Statistics · January 2019 · Mark scheme · Unit 2

Edexcel IAL Statistics mark scheme for Unit 2, January 2019 — WST02/01, file WST02_01_msc_20190307.pdf.

Advertisement
Loading the paper…
Text of this paper

Mark Scheme (Results)
January 2019
Pearson Edexcel International Advanced
Level In Statistics S2 (WST02/01)

Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding
body. We provide a wide range of qualifications including academic, vocational,
occupational and specific programmes for employers. For further information visit
our qualifications websites at www.edexcel.com or www.btec.co.uk. Alternatively,
you can get in touch with us using the details on our contact us page at
www.edexcel.com/contactus.

Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help
everyone progress in their lives through education. We believe in every kind of
learning, for all kinds of people, wherever they are in the world. We’ve been
involved in education for over 150 years, and by working across 70 countries, in 100
languages, we have built an international reputation for our commitment to high
standards and raising achievement through innovation in education. Find out more
about how we can help you and your students at: www.pearson.com/uk

January 2019
Publications Code WST02_01_1901_MS
All the material in this publication is copyright
© Pearson Education Ltd 2019

General Marking Guidance

•

All candidates must receive the same
treatment. Examiners must mark the
first candidate in exactly the same
way as they mark the last.

•

Mark schemes should be applied
positively.

Candidates

must

be

rewarded for what they have shown
they can do rather than penalised for
omissions.
•

Examiners should mark according to
the mark scheme not according to
their perception of where the grade
boundaries may lie.

•

There is no ceiling on achievement.
All marks on the mark scheme
should be used appropriately.

•

All the marks on the mark scheme
are

designed

to

be

awarded.

Examiners should always award full
marks if deserved, i.e. if the answer
matches

the

mark

scheme.

Examiners should also be prepared
to

award

zero

marks

if

the

candidate’s response is not worthy of
credit according to the mark scheme.
•

Where some judgement is required,
mark

schemes

will

provide

the

principles by which marks will be
awarded and exemplification may be
limited.
•

When

examiners

are

in

doubt

regarding the application of the mark
scheme to a candidate’s response,
the team leader must be consulted.
•

Crossed out work should be marked
UNLESS the candidate has replaced it
with an alternative response.

PEARSON EDEXCEL IAL MATHEMATICS
General Instructions for Marking
1. The total number of marks for the paper is 75
2. The Edexcel Mathematics mark schemes use the following types of marks:
•

M marks: Method marks are awarded for ‘knowing a method and attempting to apply
it’, unless otherwise indicated.

•

A marks: Accuracy marks can only be awarded if the relevant method (M) marks
have been earned.

•

B marks are unconditional accuracy marks (independent of M marks)

•

Marks should not be subdivided.

3. Abbreviations
These are some of the traditional marking abbreviations that will appear in the mark
schemes.
•

bod – benefit of doubt

•

ft – follow through

•

the symbol

•

cao – correct answer only

•

cso - correct solution only. There must be no errors in this part of the question to
obtain this mark

•

isw – ignore subsequent working

•

awrt – answers which round to

•

SC: special case

•

oe – or equivalent (and appropriate)

•

d… or dep – dependent

•

indep – independent

•

dp decimal places

•

sf significant figures

•

 The answer is printed on the paper or ag- answer given

•

will be used for correct ft

or d… The second mark is dependent on gaining the first mark

4. All A marks are ‘correct answer only’ (cao.), unless shown, for example, as A1 ft to
indicate that previous wrong working is to be followed through. After a misread

however, the subsequent A marks affected are treated as A ft, but manifestly absurd
answers should never be awarded A marks.

5. For misreading which does not alter the character of a question or materially simplify
it, deduct two from any A or B marks gained, in that part of the question affected.
6. Ignore wrong working or incorrect statements following a correct answer.

Question
Scheme
Number
1. (a) Any one response in context from :
Each person turns up independently/randomly of others oe
Probability/proportion/percentage of not turning up remains constant (5%) oe

B1
(1)

(b) X ~ B(50, 0.05)
(i) [P(X = 0) =] 0.076944…
(ii) P(X = 1) = 0.2794 – 0.0769 = 0.20248...

awrt 0.0769
awrt 0.202/0.203

(c) Let T = total earnings for a journey
880
940
1000
T
P(T = t) “0.0769” “0.2025” (1 – (“0.0769”+”0.2025”))=[0.7206]
E(T) = 880 × “0.0769” + 940 × “0.2025” + 1000 × (1 – (“0.0769+0.2025”))
awrt (£) 979

=£978.62
Alternative
Let S = possible pay out
60
S
P(S = s)
“0.2025”

Marks

120
“0.0769”

B1
M1A1
(3)
M1
dM1
A1

(3)
Alternative
M1

E(T) = 1000 – (120 × “0.0769” + 60 × “0.2025”)
=£978.62

awrt (£) 979

Notes

dM1
A1
[7 marks]

(a) Must be in context containing the words in bold. Allow turning up rather than not turning up and vice
versa.
(b)
(ii) M1 for correct use of tables or for correct use of formula 50(0.05)(0.95)49
0) oe written of used
Allow P(X  1) − P( X =
(c) 1st M1 for identifying the 3 possible total earnings 880, 940, 1000 oe
2nd dM1 for a correct ft expression for E(T)
eg 880 × ‘their b(i)’ + 940 × ‘ their b(ii)’ + 1000 × (1 – (‘their b(i) + their b(ii))
Alternative:
1st M1 for identifying the 2 possible pay outs 120 and 60 oe
2nd dM1 for a correct ft expression for E(T)
Eg 1000 – (120 × their b(i) + 60 × their b(ii))
Eg

Question
Number
2. (a) [X ~ Po(2)]
P(X < 5) = P(X ≤ 4)
= 0.947346….

Scheme

Marks

awrt 0.947

(b) Y ~ Po(6)
e −6

6n
6 n +1
→ (n + 1) = 6
= e −6
( n )!
( n + 1)!

M1
A1
B1

P(Y = 4) = 0.13385…
or P(Y = 5) = 0.16062…
P(Y = 6) = 0.16062…

(2)

M1
n=5

A1
(3)

(c) [D ~ Po(9)]
P(c ≤ D ≤ 12) = P(D ≤ 12) – P(D ≤ c – 1) or P( X ≤ d=
) 0.8758 − 0.8546
0.8546 = 0.8758 – P(D ≤ c – 1)
= 0.0212
P(D ≤ c – 1) = 0.0212
P( X ≤ 3) =
0.0212
c–1=3
c=4
c=4
(d) P(X = 2) = 0.27067…
W ~ B(6, awrt 0.27067…)
P(W = 4) = 6C4(“0.27067…”)4(1 – “0.27067…”)2
= 0.0428…

awrt 0.043

Notes

M1
dM1
A1
B1
B1ft
M1
A1

(3)

(4)
[12 marks]

(a) M1 for writing or using P(X ≤ 4) If answer is incorrect this must be shown
(b) B1 for writing or using Po(6)
M1 for a correct expressions for P(Y = n) and P(Y = n + 1) using their value of λ or for finding at
least 2 of the given probabilities for Po(6) only correct to 3sf.
A1 must be only one value of n given. If more than one value of n is given working must be shown
to award the B1 and M1, 5 on its own gains B1M1A1
(c) 1st M1 for the expression P(D ≤ 12) – P(D ≤ c – 1) oe Condone P(D ≤ 12) – P(D ≤ c) allow any
letters.
2nd dM1 for correct substitution of 0.8758 (awrt 0.876) and 0.8546 leading to
P(D ≤ c – 1) = a probability. Condone P(D ≤ c) = a probability allow any letters
(d) For an awrt 0.043 from correct working award full marks.
1st B1 for awrt 0.271 seen
2nd B1ft Follow through their P(X = 2) but you must see either B(6, “0.27067…”) or working of
the form (“0.27067…”)4(1 – “0.27067…”)2. Condone missing 6C4

NB If P(X = 2) is not stated and 0.271 is not seen do not ft.
M1 6C4 p4(1 – p )2 or P(W ≤ 4) – P(W ≤ 3) or 0.9932…– 0.9504… written

Question
Scheme
Number
3. (a) P(3 < X < 7) = F(7) – F(3) [= 0.7 – 0.2]
(b)

(c)

0.4 − 0
a=
4−2

E( X )=

6

M1
A1

0.5

1 − 0.4
c=
8−6

0
b=
6−4

4

Marks

M1
a = 0.2

b = 0 c = 0.3

4

4

A1 A1

(3)

8

∫ "0.2" x dx + ∫ "0" x dx  + ∫ "0.3" x dx
2

(2)

M1

6

8

 0.2 x 2   0.3x 2 
=
E( X ) 
 +

 2 2  2 6
= 5.4

A1ft
A1

Alternative
E(X) = 3 × p + 7 × 2 × "their c " or 3 × 2 × "their a "+ 7 × p where 0 < p < 1
= 3 × "0.4"+ 7 × "0.6"
= 5.4
Notes

(3)
Alternative
M1
A1ft
A1
[8 marks]

(a) M1 for writing or using F(7) – F(3) Implied by answer 0.5
(b) M1 for attempt to find the gradient of at least 1 line segment (may be implied by
either a or c correct)
1st A1 two values correct
2nd A1 all three values correct
(c)

M1 for a correct expression for

∫ xf ( x) dx (ignore limits) using their a, b and c (Condone a, b and c
n

n+1

as a function of x) and an attempt to integrate (x → x

6

∫

). No need to see "0" x dx if b = 0
4

otherwise it must be present
A1ft correct integration with correct limits (ft their constants a, b and c from part (b))
A1 5.4 oe
Alternative
M1 must have 3, 7 and one half correct ft their values for a/c.

A1ft 3 × 2 × "their a "+ 7 × 2 × "their c "
A1 5.4 oe

Question
Number
4. (a) H0: p = 0.35

Scheme

Marks

H1: p > 0.35
Probability route

B1
CR route

P(X ≥ 11) = 1 – P(X ≤ 10) [= 1 – 0.9468]

P(X ≤ 11) = 0.9804

M1

P(X ≥ 12) = 0.0196
= 0.0532

CR: X ≥ 12

A1

Do not Reject H 0 or not significant or 11 does not lie in the CR

dM1

Hadi’s belief is not supported or

A1cso

the proportion of customers paying by credit card is not greater than 35%.
(5)
(b) X ~ B(20, 0.35)
[E(X) =] 7

B1

S.D. =

B1

20 × 0.35 × 0.65 [= 4.55 = 2.133…]

“7” + 2 × “2.133…” 11 – “7” < 2 × 2.133…”
11 < 11.266

4 < 4.266

11 − "7"
"4.55"

11 – 2 × “2.133…”

1.875 < 2

6.734 < 7

M1
A1cso
(4)
[9 marks]

Notes
(a) B1
1st M1
A1

both hypotheses correct (may use p or π). Must have H0 and H1
for writing or using 1 – P(X ≤ 10) or if leading to a CR allow P(X ≤ 11) = awrt 0.980
(condone 0.98) or P(X ≥ 12) = awrt 0.0196 (may be implied by awrt 0.0532 or correct CR)
for 0.0532 or CR: X ≥ 12 oe

NB M1 A1 for 0.9468 < 0.95
2nd M1

Dependent on the 1st M1.
For a correct statement i.e. not significant/accept H0/Not in CR
Follow through their probability/CR and their H1 . Must have a Critical region not just a
critical value
Do not allow non-contextual conflicting statements.
May be implied by a correct contextual statement on its own
2nd A1cso fully correct solution and correct contextual statement. Underlined words required and in a
correct statement. eg Allow Hadi is wrong or Hadi’s claim is not supported
The (proportion/percentage/number/rate/probability) paying by credit card (is not greater/is
35%(0.35)/ remains the same) or there is insufficient evidence that the proportion of customers who
pay by credit card has increased
(b) 1st B1 E(X) = 7
2nd B1 for a correct expression for standard deviation
M1
for using ‘mean’ + 2 × ‘standard deviation’ or 11- “their mean” < 2 × ‘standard deviation’
or

11 − "their E( X )"
If E(X) and sd not given then allow
"Their sd"

5 < E(X) < 10 and 0 < sd < 5
A1cso for comparison with 11 or 4 or 2 allow awrt (11.3 or 4.27 or 1.88 or 6.43) oe and no errors
seen

Question
Number
5. (a)(i)

Scheme
( b − 2a ) − a 1
=
3
b−a
3(b − 3a ) = (b − a )
b = 4a
a + 4a 5a
E( X ) =
*
=
2
2

Marks

b − (b − 2a ) 2
=
b−a
3
a 2(b − a )
6=
oe
b = 4a
a + 4a 5a
=
E( X ) =
*
2
2

or

M1

M1A1cso
(3)
B1
(1)
M1

(ii) [ [P( X > b − 4a=
) P( X > 0)
= ] 1
(b)(i)

( c − 3) 2
= 3c − 9
12

M1
A1

c 2 − 42c + 117 = 0 → ( c − 3)( c − 39) = 0
c = 39
(ii) P(2Y – 7 < 20 – Y) = P(Y < 9)
9−3 1
=
'39'−3 6
(iii)

M1
A1ft A1
(3)

awrt 0.167

 '39'+3 
E(Y ) = Var(Y) + [E(Y)] = (3('39' ) − 9) + 

 2 
2

2

(3)

2

M1 A1ft

E(Y 2 ) = 549

A1
(3)
[13 marks]
Notes

(a)(i) 1st M1 for a correct probability equation =
2nd M1 for use of E(X) =

a+'4a '
oe
2

1
3

(or a correct probability equation =

2
3

)in terms of a and b

A1cso correct solution with no errors seen.
(b)(i) 1st M1 for

(c − 3) 2
= 3c − 9
12

2nd M1 for rearranging correctly to form 3TQ = 0 and attempt to solve or

c −3
= 3 oe
12

For attempt at factorising it must give two of the terms when multiplied out
For using the formula allow 1 slip if the correct formula is written down otherwise no errors
For completing the square allow one sign error.
A1 If more than one value is given and c = 39 is not clearly selected then A0. Allow [3,39]
(ii) M1 for rearranging to (or using) P(Y < 9)
1st A1ft for a correct probability expression ft their ‘39’. If (i) is incorrect we must see a correct
expression eg
(iii)

9−3
6
to ft
or
"39"− 3
"36"

M1 for writing or using E(Y 2 ) = Var(Y) + [E(Y)]2 (must be E(Y 2 ) = )

'39'

∫
3

1
'39' −3

y 2 dy with y 2 → y 3

condone different letter. If c is incorrect, they must show where Var(Y) and E(Y) come from.
A1ft correct (follow through) expression for E(Y 2 ) allow

1
'39' −3

'39'

 y3  3
3

Question
Number
6. i.(a) n is large and p is small

Scheme

Marks
B1

(b) [X ~ B(3000, 0.0025) →] Y ~ Po(7.5)
P(Y > 7) = 1 – P(Y ≤ 7) = 1 – 0.5246 = 0.47536…

awrt 0.475

ii.(a) A list/database/register of all employees

B1
M1 A1
B1

(b) The probability distribution of the number of employees that cycle to work
[from all possible samples of 150]

B1

(c) D ~ N(60, 36)
P(C ≤ α) = P (Z ≤ z) = 0.0668
α − "60"
"60"− α
= 1.5
= −1.5 or
"6"
"6"

B1

(d)

(a)

(3)
(1)

(1)

M1 B1
α = 51

P(C ≤ 51) = P( D ≤ 51.5)
"51"− "60"+ 0.5 

P Z ≤

"6"


= P(Z ≤ −1.42 ) = 1 – 0.9222
= 0.0778/0.0782…

n is bigger then 10 and p < 0.25

(1)

A1cao

(4)

M1
awrt 0.078
Notes

A1

(2)
[12 marks]

i. (b) B1 for writing or using Po(7.5)
M1 for writing or using 1 – P(Y ≤ 7) oe
ii (a) B1 must be all employees
(b) B1 Allow number of employees that cycle to work and their associated probabilities
(c) 1st B1 for Normal approximation with mean = 60 and variance = 36 / standard deviation = 6
M1 for standardising with no continuity correct and equating to z using their mean and sd (if not
stated clearly they must be correct here), with |z| > 1
2nd B1 for – 1.5 (or 1.5) Their sign must be compatible with their standardisation. Allow if used their
36 instead of their 6
(d) M1 for standardising with use of continuity correction ‘their 51’ + 0.5 allow same mean and sd used
in part(c)
A1 awrt 0.078

Question
Number
7. (a)

Scheme
0

3

−3

0

∫ c(x + 3) dx + ∫ 365 (3 − x ) dx

or

Marks

area of triangle =

3 × 3c 3 × 365 (3)
+
2
2

3 × 3c 5
+ 8 = 1 oe
2

c( − 92 + 9) + 85 = 1 oe

1
*
12
Alternative


 5
 5 
 x2

x2 
3
x
−
 ∫ c( x + 3) = c  + 3 x  + d and  ∫ (3 − x)=


+e
2
 2



 36
 36 
Using F(– 3) = 0
and F(3) = 1 and d = e
1
c= *
12
(b)(i) A correct sketch of f(x) with straight line positive gradient from –3 ≤ x < 0
and straight line negative gradient from 0 ≤ x ≤ 3, LHS below RHS at y axis
Correct labels: –3 and 3 on x-axis and 14 and 125 oe on y-axis
(ii) Highest point [at f(0), so X = 0 is the mode] oe
c=

(c)

x

∫

1
12

(t + 3) dt

or

∫

1
12

( x + 3) dx with + c and F(–3) = 0

or

∫

5
36

(3 − x ) dx with + d and F(3) = 1

−3
0

∫

−3

1
12

(t + 3) dt +

x

∫
0

5
36

(3 − t ) dt

x < −3
0
0
1
1 2 1
2
3
−3≤ x < 0
 24 ( x + 3)
 24 x + 4 x + 8
or
=
x
F(
)
F(x ) = 
 5
2
2
5
5
3
0≤ x≤3
1 − 72 (3 − x)
 12 x − 72 x + 8
1

x>3
1

(d)
1 − F( d ) 2
[P(X >d | X > 0) =]
= oe
1 − F(0) 5
2 5 1
1 – F(d) = × [=] oe
5 8 4
Using cdf
or
area of triangle
(3 − d ) 365 (3 − d )
5
3 
2 5
2 5
 5
1 −  " d − d 2 + "  =" × "
or
= " × " oe
72
8  5 8
2
5 8
 12
d = awrt 1.10

M1
dM1
A1cso (3)

M1
dM1
A1 cso
B1
B1
B1

(3)

M1

B1
A1
A1
(4)
M1
A1

dM1
A1

(4)
[14 marks]

Notes
(a) M1 for correct integrals added, including limits, or area of triangle. Condone missing dx
Do not accept c(0 + 3)=5/36(3 – 0)
dM1 for equating to 1 and attempting to solve
A1 cso for c = 121 with no incorrect working seen
(b)(ii) B1: oe eg Maximum value. Condone highest probability
(c) M1 for attempting to integrate first line of pdf with correct limits or + c and F(–3) = 0
or for attempting to integrate second line of pdf with correct limits +F(0) or + d and F(3) = 1

3
instead of either F(-3) =0 or F(3) =1
8
B1 1st and 4th line correct. Allow one of range to be otherwise, ≤ instead of < and ≥ instead of >
1st A1 correct 2nd line with limits. Allow < instead of ≤ and vice versa
2nd A1 correct 3rd line with limits. Allow < instead of ≤ and vice versa
(d) 1st M1 for a correct probability expression, allow P( X > d ) 2 oe implied by A1.
=
NB Allow use of F(0) =

P( X > 0)

5

Do not allow P( X > d ) ∩ P( X > 0) for P( X > d )
2 5 1
3
1
2 5
1st A1 for 1 – F(d) = × or 1 − P( x < d ) = × [= ] or F(d) =
or P( x > d ) =oe
5 8
5 8 4
4
4
their P( X > d ) for their cdf oe and attempting to
2nd dM1 previous M1 awarded. For 1 − F(d ) =
solve leading to a value for d.

Pearson Education Limited. Registered company number 872828
with its registered office at 80 Strand, London, WC2R 0RL, United Kingdom

Advertisement