Mathematics · June 2020 · Mark scheme · S3

Edexcel IAL Mathematics mark scheme for S3, June 2020, file IAL_Maths_2020_May_S3_MS_1784113450152.pdf.

Advertisement
Loading the paper…
Text of this paper

Mark Scheme (Results)
October 2020

Pearson Edexcel IAL In Statistics 1
Paper WST03/01

Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding body. We provide
a wide range of qualifications including academic, vocational, occupational and specific programmes
for employers. For further information visit our qualifications websites at www.edexcel.com or
www.btec.co.uk. Alternatively, you can get in touch with us using the details on our contact us page at
www.edexcel.com/contactus.

Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help everyone progress in
their lives through education. We believe in every kind of learning, for all kinds of people, wherever
they are in the world. We’ve been involved in education for over 150 years, and by working across 70
countries, in 100 languages, we have built an international reputation for our commitment to high
standards and raising achievement through innovation in education. Find out more about how we can
help you and your students at: www.pearson.com/uk

October 2020
Publications Code WST03_01_2010_MS
All the material in this publication is copyright
© Pearson Education Ltd 2020

General Marking Guidance

•

All candidates must receive the same treatment. Examiners must mark the first
candidate in exactly the same way as they mark the last.

•

Mark schemes should be applied positively. Candidates must be rewarded for what
they have shown they can do rather than penalised for omissions.

•

Examiners should mark according to the mark scheme not according to their
perception of where the grade boundaries may lie.

•

There is no ceiling on achievement. All marks on the mark scheme should be used
appropriately.

•

All the marks on the mark scheme are designed to be awarded. Examiners should
always award full marks if deserved, i.e. if the answer matches the mark
scheme.

Examiners should also be prepared to award zero marks if the

candidate’s response is not worthy of credit according to the mark scheme.
•

Where some judgement is required, mark schemes will provide the principles by
which marks will be awarded and exemplification may be limited.

•

When examiners are in doubt regarding the application of the mark scheme to a
candidate’s response, the team leader must be consulted.

•

Crossed out work should be marked UNLESS the candidate has replaced it with an
alternative response.

EDEXCEL IAL MATHEMATICS
General Instructions for Marking
1. The total number of marks for the paper is 75.
2. The Edexcel Mathematics mark schemes use the following types of marks:
•
•
•
•

M marks: method marks are awarded for ‘knowing a method and attempting to apply it’,
unless otherwise indicated.
A marks: Accuracy marks can only be awarded if the relevant method (M) marks have
been earned.
B marks are unconditional accuracy marks (independent of M marks)
Marks should not be subdivided.

3. Abbreviations
These are some of the traditional marking abbreviations that will appear in the mark schemes.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•

bod – benefit of doubt
ft – follow through
the symbol
will be used for correct ft
cao – correct answer only
cso - correct solution only. There must be no errors in this part of the question to
obtain this mark
isw – ignore subsequent working
awrt – answers which round to
SC: special case
oe – or equivalent (and appropriate)
dep – dependent
indep – independent
dp decimal places
sf significant figures
 The answer is printed on the paper
The second mark is dependent on gaining the first mark

4. All A marks are ‘correct answer only’ (cao.), unless shown, for example, as A1 ft to
indicate that previous wrong working is to be followed through. After a misread however,
the subsequent A marks affected are treated as A ft, but manifestly absurd answers
should never be awarded A marks.
5. For misreading which does not alter the character of a question or materially simplify it,
deduct two from any A or B marks gained, in that part of the question affected.
6. If a candidate makes more than one attempt at any question:
• If all but one attempt is crossed out, mark the attempt which is NOT crossed out.
• If either all attempts are crossed out or none are crossed out, mark all the
attempts and score the highest single attempt.
7. Ignore wrong working or incorrect statements following a correct answer.

Question
Number
1.
(a)

(b)

(a)

Scheme

2(1 + α )
2
= 1 + α ≠ α (therefore 2X is a biased estimator of α )
=
=
X ) 2E(
X)
E(2

x=6

2x – 1 =

Notes
M1 for use of 2 ×

11

M1
A1
M1
A1
Total 4

1+ α
2

A1cso correct comparison with α and no incorrect working seen.

1+ α
≠ α is M0A0
2
(b)

Marks

M1 for attempt at x and use of 2x – 1 or ft use of their E( X ) from part (a) to
find an estimate for α
A1 11 cao

(2)

(2)

Question
Number
2.
(a)

Scheme
Expected values: 13.75, 19.25, 17

Pass

(b)

Marks

(18 − 13.75)
13.75
1.31

2

B1

(15 − 19.25)
19.25

2

0.94

(17 − 17)
17

2

0

M1
2.25
9.43

H 0 : Degree/category is independent of department (no association)

H1 : Degree/category is not independent of department (association)
ν = (3 − 1)(3 − 1) = 4

(4)
B1
B1

χ (5%) = 9.488

B1ft

‘9.43’ < 9.488, so do not reject H 0 / not significant

M1

2
4

Not enough evidence to show that the Degree/category is not independent of
department (no association) (at the 5% level of significance)

(a)

A2

Notes
B1 All correct expected values (may be implied by A2)
M1 Attempting

A1ft
Total 9

(5)

(O − E ) 2
for their E (may be implied by one correct value)
E

A2 all 5 values correct (allow awrt)
(A1 any 2 values correct)
(b)

B1 Both hypotheses required must mention degree/category and department at least once. Use of
“relationship” or “correlation” or “connection” or “link” award B0.
B1 4 can be implied by 9.488 seen
2
2
B1ft 9.488 or better. Follow through their ν so may see χ 3,0.05
= 7.815 χ 2,0.05
= 5.991
M1 Correct non-contextual conclusion for their (a) and c.v. Can be implied by correct
conclusion in context ft their (a) and c.v.
A1ft A correct comment in context.
Condone “relationship” or “connection” here but not “correlation”.
Follow through from their test statistic and cv, but hypotheses must be correct.

Question
Number
3.

(a)

Scheme

A
B
C
D
E
F
G

200m

400m

3
2
1
4
7
6
5

1
2
4
5
7
6
3

d
2
0
–3
–1
0
0
2

d2

4
0
9
1
0
0
4

6 ×18 19
awrt 0.679
rs =
=
=
1−
7 × 48 28

H0 : ρ = 0

dM1 A1
(5)
B1

H1 : ρ > 0
Critical value 0.7143
(0.679 < 0.7143) so insufficient evidence to reject H 0

(c)

M1 A1

A1

∑ d 2 =18

(b)

Marks

B1
M1

There is insufficient evidence to suggest a positive correlation between the
finishing order in the 200 metre race and the finishing order in the 400 metre
race.

A1ft

There are tied lengths so use average ranks

B1

Then use rs =

dB1

Sxy

SxxS yy

Total 11

(a)

(b)

(4)

(2)

Notes
M1 for an attempt to rank athletes lists (at least 3 correct for each)
A1 for correct rankings for both (may be reversed). Can be implied by correct ∑ d 2
A1 ∑ d 2 =18
dM1 (dep upon previous M1) for use of the correct formula, follow through their ∑ d 2
A1 awrt 0.679
B1 both hypotheses correct ρ or ρ s
B1 for correct c.v. (sign should match H1 or rs )

M1 ft their rs and their c.v.
A1 ft a correct contextualised comment including positive correlation and races/finishing orders
(oe) with all previous marks in (b) scored
(c)

B1 for use of average ranks or use of 1.5 or 6.5(for C and D)/4.5 or 3.5 (for B and G)
dB1 (dep on 1st B1) for use of pmcc (with the average ranks)

Question
Number
4. (a)
(b)

(c)

Scheme
Randomly select a student from 1 to 7 oe
Take every 7th student

B1
B1

ν = 10 − 1 = 9

B1 B1ft

χ 92 (10%) = 14.684
No evidence (at 10% level of significance) that the digits generated do not
follow a uniform distribution.

H 0 : Uniform distribution is a good fit (for the two-digit numbers generated)
H1 : Uniform distribution is not a good fit (for the two-digit numbers generated)
O

E

31
49
30
42
48
200

40
40
40
40
40
200

(O − E ) 2 = 8.25
∑ E

χ 42 (10%) = 7.779

(O − E ) 2
E

2.025
24.025
2.025
60.025
2.5
22.5
0.1
44.1
1.6
57.6
8.25
208.25
2
O
or ∑
− 200 = 8.25
E

dB1
(3)
B1

B1
M1 A1

A1
B1

There is evidence to suggest the two-digit numbers generated may not follow a
uniform distribution.
To generate a simple random sample, Luka would need to generate two-digit
numbers (from 00 to 69)
But Luka’s table would not be suitable for generating random two-digit
numbers

M1
A1
(8)
B1
B1ft
Total 15

(a)
(b)

(c)

(2)

O2
E

[8.25 > 7.779] Reject H 0 / Significant

(d)

Marks

(2)

Notes
B1 for the idea of generating a random number to determine first student selected
B1 for every 7th student (not just select 40 students)
B1 for correct degrees of freedom (may be implied by 2nd B1)
B1ft for correct critical value 14.684 or better ft their d.f. so may see χ102 (10%) = 15.987
B1 (dependent upon 2nd B1) for correct conclusion in context with digits (oe) and uniform distr.
B1 Both hypotheses correct
B1 All expected values = 40
2
M1 Attempting (O − E ) or O 2 with at least 3 correct (1 dp truncated or rounded) or f.t. their E
A1 all

(O − E ) 2
E

or

E

O2
E

E

correct (1 dp truncated or rounded). May be implied by 8.25 or 208.25

A1 8.25 oe
B1 correct critical value 7.779 or better
M1 for a correct non-contextual conclusion (ignore any contradictory contextual comments for
this mark) based on their cv and their test statistic
A1 correct conclusion in context with all previous marks scored
B1 for the idea of generating two-digit numbers (for a simple random sample)
(d)
B1ft Luka’s table not suitable for generating two-digit random numbers for a simple random
sample, ft parts (b) and (c)
SC: If B0B0 scored, ‘table only suitable for generating one-digit random numbers’ scores B0B1

Question
Number
5.
(a)

Scheme

=
s A2

1
1
sB2
581430 − 134.7 2 × 32 )
790258 − 140.42 × 40 ) =
(
(
31
39

= 45.4256….
(b)

Marks

awrt 45.4

= 26.4232…

awrt 26.4

A1 A1

H0 : µ A − µB =
5

B1

H1 : µ A − µ B > 5

B1

45.4256... 26.4232...
+
(= awrt 1.4)
40
32
±(140.4 − 134.7 − 5)
= awrt 0.50
z=
s.e.

s.e. =

c.v. = 1.6449
(Do not reject H 0 ) Insufficient evidence to support the greengrocer’s belief.
(Insufficient evidence that the difference in weight between type A oranges and
type B oranges is over 5 grams).
(c)

M1

Large sample sizes so…
Sample means are normally distributed (CLT)
s A2 = σ A2 and sB2 = σ B2
Notes

(a)

M1 one correct expression
A1 either awrt 45.4 or awrt 26.4
A1 both awrt 45.4 and awrt 26.4

(b)

B1 Allow equivalent rearrangements. Must use µ
B1 Allow equivalent rearrangements. Must use µ .

M1
dM1 A1
B1
A1ft
(7)
B1
B1
Total 12

For both hypotheses do not allow e.g. µ1 and µ 2 unless each has been clearly defined
M1 attempt at standard error (allow one slip) ft their (a)
dM1 standardising with (140.4 – 134.7 – 5) and their s.e. (dep on previous M1)
A1 for 0.5 or awrt 0.50
B1 correct c.v. 1.6449 or better. Allow –1.6449 or better with use of µ B − µ A
Allow p = awrt 0.309
A1ft correct ft conclusion in context with either greengrocer’s belief (oe) or difference in
weights (oe) dependent on all B and M marks scored.
(c)

B1 must comment on both sample means, A and B
B1 must comment on both variances/standard deviations

(3)

(2)

Question
Number
6.
(a)

T ~ N(4, 354 )

M1 A1

(b)

K ~ N(λ , 40 )

M1

Scheme

(2)

λ

λ
2.6
=
40

2 × 2.5758 ×

(c)

Marks

B1 M1

2 × 0.99 × 0.01

λ = awrt 10.2

A1

= 0.0198

M1
A1

Notes

(a)

M1 for Normal distribution
A1 for correct mean and variance (allow N(4, awrt 0.114))

(b)

λ
M1 for use of 40
if λ = σ is used, then M0
B1 for ±2.5758 (may be implied by sight of 10.188…)

M1 for use of 2 × z ×

Total 8

'σ '
=2.6 with |z| > 2
40

A1 awrt 10.2 (an answer of 10.15…or awrt 10.2 on its own scores M1B0M1A1)
SC: Use of
(c)

λ instead of λ leading to an answer of awrt 3.19… scores M0B1M1A0

M1 for 2 p(1 – p) for any p 0 < p < 1
A1 0.0198

(4)
(2)

Question
Number
7.
(a)

Scheme

Marks

C1 + C2 + C3 ~ N(480, 3 ×1.252 )

M1 A1



475.8 − 480
−1.94) 
P(C1 + C2 + C3 > 475.8) =
P Z >
(=
2
3 ×1.25

M1

= awrt 0.974

(b)

(c)

2

A1
2

W = T1 + T2 + T3 + T4 + T5 + C1 + C2 ~ N(5 × 60 + 2 ×160, 5 × 2 + 2 ×1.25 )

M1 A1

625 − 620


P(W > 625) = P  Z >
(= 1.03975...) 
23.125

M1
= awrt 0.149

A1

(4)

(4)

n

Y =(n − 1)T1 − ∑ Tr
r =2

Y ~ N( µ , σ )
2

µ = (n − 1) × 60 − (n − 1) × 60 [= 0]
σ 2 = (n − 1) 2 × 4 + (n − 1) × 4 [= 4n 2 − 4n]
40 − 0
= 1.38
4n 2 − 4n
4n 2 − 4n − 840(.159...) =
0
n = 15

M1 A1
M1 A1
M1 B1
dM1
A1
Total 16

(a)

(8)

Notes
M1 for setting up Normal distribution with mean 480
A1 for correct expression for variance (= 4.6875) or for standard deviation (= 2.165…)
M1 standardising with 475.8, 480 and their standard deviation (their standard deviation ≠ 3.75)
A1 awrt 0.974

(b)

M1 for setting up Normal distribution with mean 620
A1 for correct expression for variance (= 23.125) or for standard deviation (= 4.8088…)
M1 standardising with 625, 620 and their standard deviation
A1 awrt 0.149

(c)

M1 for a single combined normal distribution (may be implied by a single standardisation)
A1 correct expression for µ
M1 for use of a 2 × 4 + a × 4
A1 correct expression for σ 2
M1 standardising with their mean and their sd = z where 1< |z| < 1.5
B1 awrt 1.38
dM1 solving their 3TQ (working must be shown if answer is incorrect) (dependent upon 2nd M1)
A1 15 cao (must reject –14 if found). Must come from compatible signs in standardisation.

Pearson Education Limited. Registered company number 872828
with its registered office at 80 Strand, London, WC2R 0RL, United Kingdom

Advertisement