Mathematics · January 2026 · Mark scheme · S3
Edexcel IAL Mathematics mark scheme for S3, January 2026, file IAL_MATHS_2026_Jan_S3_MS.pdf.
Text of this paper
Mark Scheme
(Final)
January 2026
International Advanced Level in Statistics S3
WST03/01
Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest
awarding body. We provide a wide range of qualifications including academic,
vocational, occupational and specific programmes for employers. For further
information visit our qualifications websites at www.edexcel.com or
www.btec.co.uk.
Alternatively, you can get in touch with us using the details on our contact us page
at www.edexcel.com/contactus
Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help everyone
progress in their lives through education. We believe in every kind of learning, for all kinds
of people, wherever they are in the world. We’ve been involved in education for over 150
years, and by working across 70 countries, in 100 languages, we have built an international
reputation for our commitment to high standards and raising achievement through
innovation in education. Find out more about how we can help you and your students at:
www.pearson.com/uk
January 2026
Question Paper Log Number P78917A
Publication Code WST03_01_2601_MS
All the material in this publication is copyright
© Pearson Education Ltd
General Marking Guidance
•
All candidates must receive the same treatment. Examiners must mark the first
candidate in exactly the same way as they mark the last.
•
Mark schemes should be applied positively. Candidates must be rewarded for what they
have shown they can do rather than penalised for omissions.
•
Examiners should mark according to the mark scheme not according to their perception
of where the grade boundaries may lie.
•
There is no ceiling on achievement. All marks on the mark scheme should be used
appropriately.
•
All the marks on the mark scheme are designed to be awarded. Examiners should always
award full marks if deserved, i.e. if the answer matches the mark scheme. Examiners
should also be prepared to award zero marks if the candidate’s response is not worthy
of credit according to the mark scheme.
•
Where some judgement is required, mark schemes will provide the principles by which
marks will be awarded and exemplification may be limited.
•
When examiners are in doubt regarding the application of the mark scheme to a
candidate’s response, the team leader must be consulted.
•
Crossed out work should be marked UNLESS the candidate has replaced it with an
alternative response.
EDEXCEL IAL MATHEMATICS
General Instructions for Marking
1. The total number of marks for the paper is 75.
2. The Edexcel Mathematics mark schemes use the following types of marks:
•
M marks: Method marks are awarded for ‘knowing a method and attempting to
apply it’, unless otherwise indicated.
•
A marks: Accuracy marks can only be awarded if the relevant method (M) marks
have been earned.
•
B marks are unconditional accuracy marks (independent of M marks)
Marks should not be subdivided.
3. Abbreviations
These are some of the traditional marking abbreviations that will appear in the mark
schemes and can be used if you are using the annotation facility on ePEN:
•
bod – benefit of doubt
•
ft – follow through
o the symbol
will be used for correct ft
•
cao – correct answer only
•
cso – correct solution only. There must be no errors in this part of the question to
obtain this mark
•
isw – ignore subsequent working
•
awrt – answers which round to
•
SC – special case
•
oe – or equivalent (and appropriate)
•
d… or dep – dependent
•
indep – independent
•
dp – decimal places
•
sf – significant figures
•
– The answer is printed on the paper or ag- answer given
•
or d… – The second mark is dependent on gaining the first mark
4. All A marks are ‘correct answer only’ (cao), unless shown, for example, as A1 ft to
indicate that previous wrong working is to be followed through. After a misread
however, the subsequent A marks affected are treated as A ft, but manifestly absurd
answers should never be awarded A marks.
5. For misreading which does not alter the character of a question or materially simplify it,
deduct two from any A or B marks gained, in that part of the question affected. If you
are using the annotation facility on ePEN, indicate this action by ‘MR’ in the body of the
script.
6. If a candidate makes more than one attempt at any question:
a) If all but one attempt is crossed out, mark the attempt which is NOT crossed out.
b) If either all attempts are crossed out or none are crossed out, mark all the attempts
and score the highest single attempt.
7. Ignore wrong working or incorrect statements following a correct answer.
Question
Number
1
Scheme
Marks
H 0 : The aptitude test result is independent of the test centre
B1
H1 : The aptitude test result is not independent of the test centre
Observed
Centre A
Centre B
Total
Expected
Centre A
Pass
60
80
140
Fail
30
30
60
Pass
140 90
[= 63]
200
140 110
[= 77]
200
Centre B
(O − E )2 ( 60 − 63) ( 80 − 77 ) ( 30 − 27 ) ( 30 − 33)
E = 63 + 77 + 27 + 33
2
2
2
Total
90
110
200
M1
Fail
60 90
[= 27]
200
60 110
[= 33]
200
M1
2
or
dM1
2
2
2
2
2
O
60 80 30 30
− 200 =
+
+
+
− 200
E
63 77 27 33
= 0.8658…
= (2 − 1)(2 − 1) = 1
awrt 0.866 A1
B1
2
2 (0.05) = 3.841
B1ft
[Do not reject H0/not significant/not in the CR] There is insufficient evidence that
dA1ft
aptitude test result differs by test centre
(8)
M1
Notes
Total 8
both hypotheses correct with result and centre (Condone aptitude test and test centre). May be
written in terms of association
for a correct contingency table. May be implied by awrt 0.866
M1
attempt at
B1
row total column total
(can be implied by at least one correct expected value)
total
O2
(O − E )2
dependent on previous M1. For using
or
− 200
E
E
dM1
(There must be 4 values of
A1
B1
B1ft
dA1ft
(O − E )2
or
E
O2
calculated)
E
awrt 0.866
=1
3.841 (or better) allow ft from their stated degrees of freedom
dependent on 3rd M1 and 3rd B1. For a correct contextual conclusion. Must include result and
centre. (Condone aptitude test and test centre)
Question
Number
2 (a)
(b)
Scheme
H0 : s = 0
B1
H1 : s 0
6 d
rs =1 −
(1)
2
0.9
5(24)
d 2
2
Marks
M1 B1
So largest possible value is 2*
A1*
(3)
(c)
e.g. d = 0, 0, 0, 1, –1
M1
So e.g. A B C E D
A1
(2)
(a)
B1
Notes
for both hypotheses correct in terms of or s . Condone use of p
(b)
M1
for use of formula for r in an equation or an inequality (condone > rather than )
B1
for 0.9
answer is given so at least one correct line of working is needed between the M mark and the
d 2 = 2 if written as an equation throughout but do not allow
d 2 2
given answer. Allow
A1*
or
(c)
d
2
2 or
d
2
Total 6
2
M1
for a correct possibility for d or d May be implied by a correct possibility for rankings
A1
for a correct possibility for rankings or eg 1, 2, 3, 5, 4
Question
Number
3 (a)
Scheme
Marks
509.1572 + 510.8428
x=
= 510
2
2 1.96
n
B1
= 510.8428 − 509.1572
M1
= 0.43
n
'510 ' 1.6449 '0.43'
( 509.292..., 510.707...)
(b)
A1
(awrt 509.3, awrt 510.7)
M1 B1
A1
(6)
Let X = The number of confidence intervals containing so X ~ B(3, 0.9)
P( X 1) = 1 − P( X = 0) = 1 − 3 C0 0.90 0.13
M1
= 0.999
A1
(2)
Notes
(a)
(b)
Total 8
B1
for x = 510
M1
for use of 2 z value
A1
Cao
M1
for use of x z value
B1
z = 1.96 or better and z = 1.6449 or better
A1
M1
(awrt 509.3, awrt 510.7)
for writing or using P( X 1) = 1 − P( X = 0) or P(X = 1) + P(X = 2) + P(X = 3)
A1
Cao
n
n
= 510.8428 − 509.1572 oe
ft their x and their
n
Question
Number
4 (a)
Scheme
Marks
273
= 0.18
150 10
M1 A1
(2)
(b)
10
C5 0.18 0.82 150[= 2.65] *
5
5
B1*
(1)
(c)
0.54
B1
(1)
(d)
To ensure that no expected frequency < 5
B1
(1)
(e)
H 0 : Binomial distribution is a good fit.
B1
H1 : Binomial distribution is not a good fit
Combine cells
M1
8 + 6 + 3 = 17 and 10.05 + 2.65 + ‘0.54’ = 13.24
(Oi − Ei )2
(17 − 13.24) 2
=
2.51
+
E
13.24
i
M1
= 3.5777
= 5 −1−1 = 3
32 (0.05) = 6.251
awrt 3.58 A1
B1
B1ft
dA1
[Do not reject H0/not significant] Binomial distribution is a suitable model
(7)
(a)
(b)
(c)
(d)
(e)
M1
A1
B1*
B1
B1
B1
M1
Notes
for a correct method to find the value of p
Awrt 0.18
for a correct expression for r
for 0.54
for a correct explanation
for both hypotheses correct (any mention of B(10, p) is B0)
for combining cells
M1
Dep on an attempt to combine cells. Use of 2.51 +
A1
B1
B1ft
=3
dA1
Total 12
(Oi − Ei )2
E for remaining cells
i
awrt 3.58
6.251 or better. Allow ft from their stated DoF
dependent on 2nd M1. For a correct conclusion which states that the data are consistent with a
binomial distribution which must be consistent with the test statistic and CV
(Condone any mention of n and p or it supports the managers belief)
Question
Number
5 (a)
(b)
Scheme
Marks
3085
m = 50 m = 61.7
190457.2 − 50(61.7)2
v=
= 2.3
50 − 1
B1
M1 A1
(3)
H0 : A − B = 10
H1 : A − B 10
B1
72.2 − '61.7 '− 10
6.4 '2.3'
+
50
50
= 1.1986...
One tailed c.v. Z = 1.6449 or CR: Z 1.6449
z=
M1 M1
awrt 1.20
A1
B1
Not in CR/Not significant/Do not reject H 0
M1
No significant evidence to support the head of department’s claim
A1
(7)
(c)
Assume that s = for both samples
B1
Assume sample sizes are large enough so that CLT applies or the CLT allows us
to assume that the distributions of the sample means are (approximately) normal
B1
2
2
(2)
Notes
Total 12
(a)
B1
M1
A1
Cao
for a full attempt at s 2 ft their x
Cao
for both hypotheses correct in terms of A and B Allow equivalent rearrangements. Allow
(b)
B1
other letters as long it is clear which is professor A and which is professor B. Must be attached to
H0 and H1
M1
M1
for z =
for z =
a − b − 10
c
d
+
50 50
72.2 − ' 61.7 '− 10
6.4
50
A1
B1
(c)
with at least 2 of a, b, c or d correct (allow ±) ft their 61.7 and their 2.3
+
' 2.3 '
(allow ±) ft their 61.7 and their 2.3
50
M1
awrt 1.20
for CV = ±1.6449 and compatible sign with their test statistic
for correct statement consistent with their test statistic and CV (no contradictory non-contextual
comments) May be implied by correct contextual comment on its own
A1
for a contextual conclusion that is consistent with their test statistic and their CV. Must mention
head of department’s claim
B1
B1
for one correct assumption. Must mention both samples.
for a second correct assumption. Must mention both samples.
Question
Number
6 (a)
Scheme
P ( H 55.08) = 0.1151
55.08 +
55.08 −
= −1.20
6
n
7.2
=
n
P ( H 56.976 ) = 0.0250
Marks
M1
A1
56.976 −
= 1.96
6
n
11.76
=
n
7.2
11.76
55.08 +
= 56.976 −
n
n
18.96
Either
= 1.896 or n = 10 leading to n = 100*
n
56.976 −
M1
A1
M1
A1*
(6)
(b)
11.76
7.2
= 55.08 +
= 55.8 or = 56.976 −
= 55.8
'10 '
'10 '
M1 A1
(2)
Notes
(a)
(b)
6
and setting = to ± 1.2
n
M1
for standardising with and
A1
for a correct equation
M1
for standardising with and
A1
M1
A1*
M1
A1
for a correct equation
for solving simultaneously
for a correct equation leading to the given answer
substitution of n = their 10 into an equation to find
Cao
6
and setting = to ± 1.96
n
Total 8
Question
Number
7 (a)
Scheme
Marks
(a − 1) + (a + 5)
=a+2
2
So X – 2 is an unbiased estimator for a
E( X ) =
M1 A1
A1
(3)
(b)
B1ft
SE ( X – 2) = SE( X )
Var( X ) =
SE =
( ( a + 5) − ( a − 1) )
2
12
M1 A1
=3
s
3
=
= 0.57735...
3
n
awrt 0.577
M1 A1
(5)
Notes
Total 8
(a)
M1
a+b
for use of
2
(b)
A1
A1
B1ft
for a + 2
Cao
for SE ( X – 2) = SE( X ) ft their unbiased estimator in part (a) May be implied by awrt 0.577
M1
for use of
A1
Cao
M1
for use of
A1
awrt 0.577
(b − a )
12
s
n
2
Question
Number
8 (a)
Scheme
Marks
[a =]625 + 625 − 886 =]364
B1
M1 A1
[b =]42 + 42 + 45 = 5553
2
2
2
(3)
(b)
X = L – 3S
E( X ) = 886 − 3 265 = 91
M1
Var( X ) = 452 + 32 782 = 56781
M1 A1
0 − 91
P ( X 0 ) = P Z
56781
P ( Z −0.38 ) = 0.6480 Cal gives 0.64865… So awrt 0.648 – 0.649
(c)
M1
A1
(5)
S1 − S2
2
265 − 265
= 0
E(Y ) =
2
Y=
782 + 782
= 3042
4
100 − 0
P (Y 100 ) = P Z
3042
Var(Y ) =
R = S1 − S 2
M1
E( R) = 265 − 265 = 0
M1
Var( R) = 782 + 782 = 12168
M1
200 − 0
P ( R 200 ) = P Z
12168
M1
P ( Z 1.81) = 1 − 0.9649 = 0.0351 Cal gives 0.0349
So awrt 0.0349 – 0.0351
A1
(5)
Notes
(a)
(b)
(c)
B1
M1
A1
M1
M1
A1
M1
A1
Cao
For writing or using 2 Var( M ) + Var( L)
Cao
for seeing or using E(X) = 91 or correct expression for mean
for writing or using Var( L) + 32 Var( S )
Cao
for standardising using their mean and standard deviation (Allow ±)
awrt 0.648 – awrt 0.649
M1
for use of S1 − S2 or S1 − S 2
M1
M1
M1
A1
for writing or using E(Y) = 0 or E(R) = 0
for using Var (Y) = 3042 or Var(R) = 12168
for standardising using their mean and standard deviation (Allow ±)
awrt 0.0349 – awrt 0.0351
2
Total 13