Mathematics · January 2026 · Mark scheme · D1A

Edexcel IAL Mathematics mark scheme for D1A, January 2026, file IAL_MATHS_2026_Jan_D1A_MS.pdf.

Advertisement
Loading the paper…
Text of this paper

Mark Scheme (Final)
January 2026
Pearson Edexcel International Advanced Level In Decision
Mathematics D1
WDM11/01A

Edexcel and BTEC Qualifications

Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding body.
We provide a wide range of qualifications including academic, vocational, occupational
and specific programmes for employers. For further information visit our qualifications
websites
at
www.edexcel.com
or
www.btec.co.uk.
Alternatively, you can get in touch with us using the details on our contact us page at

www.edexcel.com/contactus

Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help
everyone progress in their lives through education. We believe in every kind of
learning, for all kinds of people, wherever they are in the world. We’ve been involved
in education for over 150 years, and by working across 70 countries, in 100 languages,
we have built an international reputation for our commitment to high standards and
raising achievement through innovation in education. Find out more about how we
can help you and your students at: www.pearson.com/uk

January 2026
Question Paper Log Number P87588A
Publication Code WDM11_01A_2601_MS
All the material in this publication is copyright
© Pearson Education Ltd

General Marking Guidance
All candidates must receive the same treatment. Examiners must mark the first
candidate in exactly the same way as they mark the last.
Mark schemes should be applied positively. Candidates must be rewarded for what
they have shown they can do rather than penalised for omissions.
Examiners should mark according to the mark scheme not according to their
perception of where the grade boundaries may lie.
There is no ceiling on achievement. All marks on the mark scheme should be used
appropriately.
All the marks on the mark scheme are designed to be awarded. Examiners should
always award full marks if deserved, i.e. if the answer matches the mark scheme.
Examiners should also be prepared to award zero marks if the candidate’s
response is not worthy of credit according to the mark scheme.
Where some judgement is required, mark schemes will provide the principles by
which marks will be awarded and exemplification may be limited.
When examiners are in doubt regarding the application of the mark scheme to a
candidate’s response, the team leader must be consulted.
Crossed out work should be marked UNLESS the candidate has replaced it with an
alternative response.

General Instructions for Marking
1. The total number of marks for the paper is 75.
2. The Edexcel Mathematics mark schemes use the following types of marks:
‘M’ marks
These are marks given for a correct method or an attempt at a correct method.

M marks are sometimes dependent (DM) on previous M marks having been
earned.

‘A’ marks
These are dependent accuracy (or sometimes answer) marks and can only be
awarded if the previous M mark has been earned. E.g. M0 A1 is impossible.

‘B’ marks
These are independent accuracy marks where there is no method (e.g. often
given for a comment or for a graph)
A few of the A and B marks may be f.t. – follow through – marks.

3. General Abbreviations
These are some of the traditional marking abbreviations that will appear in the
mark schemes.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•

bod – benefit of doubt
ft – follow through
the symbol will be used for correct ft
cao – correct answer only
cso - correct solution only. There must be no errors in this part of the
question to obtain this mark
isw – ignore subsequent working
awrt – answers which round to
SC: special case
oe – or equivalent (and appropriate)
dep – dependent
indep – independent
dp decimal places
sf significant figures
 The answer is printed on the paper
The second mark is dependent on gaining the first mark

4. All A marks are ‘correct answer only’ (cao.), unless shown, for example, as A1
ft to indicate that previous wrong working is to be followed through. After a
misread however, the subsequent A marks affected are treated as A ft, but
manifestly absurd answers should never be awarded A marks.
5. For misreading which does not alter the character of a question or materially
simplify it, deduct two from any A or B marks gained, in that part of the
question affected.
6. If a candidate makes more than one attempt at any question:
• If all but one attempt is crossed out, mark the attempt which is NOT
crossed out.
• If either all attempts are crossed out or none are crossed out, mark all
the attempts and score the highest single attempt.
7. Ignore wrong working or incorrect statements following a correct answer.

Question
Number
1.

Scheme
so lower bound is 4 (planks/bins)

(a)

(b)

Marks
M1 A1

Bin 1: 5.0 1.8 2.8
Bin 2: 6.2 3.0 0.6
Bin 3: 4.0 3.8 0.8
Bin 4: 2.4
Bin 5: 7.8
e.g. Middle Right

M1 A1 A1
(3)

Pivots

(c)

(2)

5.0 1.8 6.2 2.8 3.0 4.0 3.8 2.4 0.6 0.8 7.8

4.0

5.0 6.2 7.8 4.0 1.8 2.8 3.0 3.8 2.4 0.6 0.8

6.2, 3.8

7.8 6.2 5.0 4.0 3.8 1.8 2.8 3.0 2.4 0.6 0.8 (7.8, 5.0), 2.4
7.8 6.2 5.0 4.0 3.8 2.8 3.0 2.4 1.8 0.6 0.8

3.0, 0.6

7.8 6.2 5.0 4.0 3.8 3.0 2.8 2.4 1.8 0.8 0.6

(2.8), 0.8

7.8 6.2 5.0 4.0 3.8 3.0 2.8 2.4 1.8 0.8 0.6

(1.8)

M1
A1
A1ft
A1
(4)

e.g. Middle Left
Pivots
5.0 1.8 6.2 2.8 3.0 4.0 3.8 2.4 0.6 0.8 7.8

4.0

5.0 6.2 7.8 4.0 1.8 2.8 3.0 3.8 2.4 0.6 0.8

6.2, 3.8

7.8 6.2 5.0 4.0 3.8 1.8 2.8 3.0 2.4 0.6 0.8 (7.8, 5.0), 3.0

(d)

7.8 6.2 5.0 4.0 3.8 3.0 1.8 2.8 2.4 0.6 0.8

2.4

7.8 6.2 5.0 4.0 3.8 3.0 2.8 2.4 1.8 0.6 0.8

(2.8), 0.6

7.8 6.2 5.0 4.0 3.8 3.0 2.8 2.4 1.8 0.8 0.6

1.8

7.8 6.2 5.0 4.0 3.8 3.0 2.8 2.4 1.8 0.8 0.6

(0.8)

Bin 1: 7.8
Bin 2: 6.2
Bin 3: 5.0
Bin 4: 3.0

1.8
3.8
4.0 0.8
2.8 2.4 0.6

M1 A1
11 marks

(2)

a1M1
a1A1
b1M1
b1A1
b2A1
c1M1
c1A1
c2A1ft
c3A1
d1M1
d1A1

Notes for Question 1
If 5.0 4.0 3.0 written as 5, 4, 3 penalise once only with the first CSO mark
earned in a part of the question where they have used 5, 4 or 3
38.2 (30.4 – 46) / 10 total in the range 38.2 +/- 7.8
CAO correct calculation seen or 3.82 and 4 (planks/bins) An answer of 4 with
no working is M0. Do not award if any incorrect working seen.
First five numbers placed correctly (the bold numbers) and at least seven
numbers put in bins. Condone cumulative totals here only.
First nine numbers placed correctly (bold and underlined) with no repeated or
additional values.
CSO – all correct.
Quick sort – pivots, p, selected and first pass gives >p, p, <p. If only choosing
1 pivot per iteration M1 only. Must choose middle item as pivot – any other
choice is M0. Bubble sort is M0. If sort ascending this can score a maximum of
M1 A1 A0 A0 for fully correct even if then reversed. Condone one additional
number/error/omission.
First pass correct and next pivots chosen correctly/consistently for second pass.
Second and third passes correct (ft from their first pass and choice of pivots) –
next pivots chosen correctly/consistently for fourth pass.
CSO all correct including choice of pivots for the fifth pass (MR) or sixth pass
(ML)
Must be using their ‘sorted’ list in decreasing order. Their first six numbers
placed correctly (bold numbers) and at least seven numbers put in bins. First-fit
increasing is M0.
CSO – all correct.
Sort ascending
Middle right
Pivots
5.0

1.8

6.2

2.8

3.0

4.0

3.8

2.4

0.6

0.8

7.8

4.0

1.8

2.8

3.0

3.8

2.4

0.6

0.8

4.0

5.0

6.2

7.8

3.8, 6.2

1.8

2.8

3.0

2.4

0.6

0.8

3.8

4.0

5.0

6.2

7.8

2.4, (5.0, 7.8)

1.8

0.6

0.8

2.4

2.8

3.0

3.8

4.0

5.0

6.2

7.8

0.6, 3.0

0.6

1.8

0.8

2.4

2.8

3.0

3.8

4.0

5.0

6.2

7.8

0.8, (2.8)

0.6

0.8

1.8

2.4

2.8

3.0

3.8

4.0

5.0

6.2

7.8

Middle left
Pivots
5.0

1.8

6.2

2.8

3.0

4.0

3.8

2.4

0.6

0.8

7.8

4.0

1.8

2.8

3.0

3.8

2.4

0.6

0.8

4.0

5.0

6.2

7.8

3.8, 6.2

1.8

2.8

3.0

2.4

0.6

0.8

3.8

4.0

5.0

6.2

7.8

3.0, (5.0, 7.8)

1.8

2.8

2.4

0.6

0.8

3.0

3.8

4.0

5.0

6.2

7.8

2.4

1.8

0.6

0.8

2.4

2.8

3.0

3.8

4.0

5.0

6.2

7.8

0.6, (2.8)

0.6

1.8

0.8

2.4

2.8

3.0

3.8

4.0

5.0

6.2

7.8

1.8

0.6

0.8

1.8

2.4

2.8

3.0

3.8

4.0

5.0

6.2

7.8

Question
Number

2.(a)
(b)
(c)

(d)

a1M1
a1A1
a2A1
b1B1
c1M1
c1A1
c2A1
d1B1

Scheme

AB, BC, CF, CE; FG, AD; EH, HI
(£)191
(BC EF) CF, reject CE, AB, FG; {AD, reject AC}, reject DG,
{reject BE and DF}, EH, reject FH, HI, (reject GI FI)
(Note BC and EF are already in the tree and may be listed before
CF)
(£)147
Notes for Question 2
First four arcs (AB, BC, CF, CE) correctly chosen, or first five nodes
ABCFE chosen in order. If any rejections seen M1 only. If Prim
starting at any other node M1 only for the correct first four arcs (not
nodes).
First six arcs (AB, BC, CF, CE; FG, AD) correctly chosen, or all nodes
in order ABCFEGDHI.
CSO (must be arcs)
CAO
First three arcs (CF, AB, FG) correctly chosen and at least one
rejection seen at some point. (Kruskal not Prim.) We do not need to
see BC and EF added to the tree.
All arcs in tree selected correctly at correct time. Ignore any
reference to BC and EF.
CSO including all rejections correct (GI and FI do not need to be
explicitly rejected) and at the right time. Penalise any reference to
BC and EF unless correctly added before CF.
CAO

Marks

M1 A1
A1
B1

(3)
(1)

M1 A1
A1

(3)

B1
(1)
8 marks

Question
Number

Scheme

Marks

3.
(a)

M1
A1 (ABDC)
A1(GFH)
A1ft (EJ)

Shortest route: A – B – C – F – E – J
Length: 22 (metres)

A1
A1ft
(6)

(b)
A(BCF)E + F(E)J = 15 + 11 = 26
A(BC)F + EJ = 11 + 7 = 18*
A(BCFE)J + EF = 22 + 4 = 26
Arcs AB, BC, CF, EJ will be traversed twice

M1 A1ft A1
A1
(4)

(c)
Route: e.g. ABADGHDFHJEJFECFCBCA
Length: 100 + 18 = 118

B1
B1ft
(2)

(d)
(Start/finish at) E/J, or (start/finish at) C/J (one pair stated)
(Start/finish at) E/J, and (start/finish at) C/J (both pairs stated)
Length: 100 – 3 – 4 + 4 = 97 (metres)

M1
A1
A1
(3)
[15]

Notes for Question 3
In (a) it is important that all values at each node are checked very carefully – the order of the
working values must be correct for the corresponding A mark to be awarded e.g. at J the
working values must be 24 23 22 in that order (so 24 22 23 is incorrect)
It is also important that the order of labelling is checked carefully – some candidates start with
a label of 0 at A (rather than 1) – which is fine. Also the order of labelling must be a strictly
increasing sequence – so 1, 2, 3, 3, 4,… will be penalised once (see notes below) but 1, 2, 3, 5,
6,… is fine. Errors in the final values and working values are penalised before errors in the
order of labelling
a1M1: A larger value replaced by a smaller value in at least two of the working value boxes at either
C or E or F or H or J
a1A1: All values at A, B, D and C correct and working values in the correct order. Condone lack of
0 in As working value
a2A1: All values at G, F and H correct and the working values in the correct order. Penalise order of
labelling only once per question (G, F and H must be labelled in that order and G must be labelled
after A, B, D and C)
a3A1ft: All values at E and J correct on the follow through and the working values in the correct
order. Penalise order of labelling only once per question. To follow through E check that the
working values at E follow from the candidate’s final values from the feeds into E (which will come
from nodes C and F (in the order in which the candidate has labelled them)) and that the final value,
and order of labelling, follows through correctly. Repeat this process for J (which will possibly have
working values from F, H and E with the order of labelling determined by the candidate’s order of
labelled at F, H and E)
a4A1: CAO (accept in terms of arcs) (do accept route from J to A)
a5A1ft: ft their final value at J (if 22 stated and 22 is not the final value at J then A0)
If route and length are written on the wrong lines this can still score both marks
b1M1: The correct three pairings of the correct four nodes (A, E, F and J)
b1A1ft: Two rows correct including pairings and totals follow through their final values at E, F and
J
b2A1: All three rows correct including pairings and totals
b3A1: Correct repeats (AB, BC, CF, EJ) must be arcs so do not accept ABCF and EJ
c1B1: CAO – must be 20 vertices starting and finishing at A with correct repeats (shown in bold)
and visiting every vertex (may be in terms of arcs)
c2B1ft: Length of route correct on the follow through (100 + smallest repeat) but must be from a
choice of 3 totals from the correct 3 pairs of vertices
d1M1: One correct pair (E and J or C and J)
d1A1: Both pairs correct – accept as a minimum EJ and CJ without any comment on start/finish
d2A1: CAO (97)

Question
Number

Scheme

Marks

4.
M1
A1
A1
A1
A1
(5)
[5]

a1M1
a1A1
a2A1
a3A1
a4A1

Notes for Question 4
Condone lack of, or incorrect, numbered events throughout. ‘Dealt with correctly’
means that the activity starts from the correct event but need not necessarily finish at the
correct event, e.g. ‘H dealt with correctly’ requires the correct precedences for this
activity, i.e. D and E labelled correctly and leading into the same node and H starting
from that node but do not consider the end event. Activity on node is M0
If an arc is not labelled, for example, if the arc for activity E is not labelled (but the arc
is present) then this will lose the first A mark and the final (CSO) A mark – they can still
earn the second A mark on the bod. If two or more arcs are not labelled then mark
according to the scheme. Assume that a solid line is an activity which has not been
labelled rather than a dummy (even if in the correct place for where a dummy should
be). Ignore incorrect or lack of arrows on the activities for the first four marks only
If two activities are labelled with the same letter and one is in the correct position for
this activity please award the A mark on BOD, but penalise the second incorrectly
labelled activity.
Eight activities (labelled on arc), one start and at least two dummies placed
Activities A, B, C, 1st dummy (including correct arrow), D, and E dealt with correctly
Activities F, G, H and J dealt with correctly
Activities I and K dealt with correctly and both dummies from the end of G to end of F
and end of H (including correct arrows)
CSO – all arrows correctly placed for each activity with one finish and exactly three
dummies
Please check all arcs carefully for arrows – if there are no arrows on any dummies
then M1 only.
Note that additional (but unnecessary) ‘correct’ dummies that still maintain
precedence for the network should only be penalised with the final A mark if
earned.

Question
Number

5.
(a)
(b)

Scheme

Marks

B1

3x + 5y ≤ 1000

(1)

B1
B1
B1
dB1
(4)

(c)

Objective is to maximise (P =) x + y

(d)

,

B1
,

At A, P = 90
At B, P =

(1)
dM1
A1
A1

ddM1
A1

At C, P =
So C is optimal point
Testing integer solutions around C,

M1

A1
x = 173 and y = 96 is optimal integer solution, so they should make 173 soft toys and
96 craft sets

(7)

(13)
(a)
(b)

(c)
(d)

Notes for Question 5
B1: CAO
All lines should be within half a small square of the stated points and must be long
enough to fully define the feasible region (if necessary the line should be extended
to the stated points)
1B1: 3x + 5y = 1000 drawn CAO
(if correct passes through (0, 200) and (300, 20))
2B1: y = 2x drawn CAO
(if correct passes through (0, 0) and (100, 200))
3B1: 4y – x = 210 drawn CAO
(if correct passes through (30, 60) and (150, 90))
4dB1: R labelled with correct shading, either consistently outside the region or inside
the region (dependent on all three lines correct)
B1: maximise (accept max but not maximum) and (P=) x + y
1dM1: Attempt to solve two pairs of the above equations simultaneously (may be
using calculator, so no working may be seen, but do not accept 3 pairs of coordinates
with integer values which have been read off the graph. The correct three pairs of
coordinates implies M1A1A1) (dependent on scoring at least 2/4 in (b))
1A1: At least 1 correct R vertex found awrt 1dp (76.9, 153.8) (173.5, 95.9)
2A1: All correct R vertices but must be exact values

2ddM1: Attempt to evaluate at least 2 points in x + y (may be using calculator, so no
working may be seen – the correct three values implies M1A1) (dependent on
previous M mark)(condone use of integer coordinates here)
3A1: The 2 correct P values for B and C either exact or awrt 1 dp (230.8, 269.4)
(

,

)

3M1: Attempt to test at least two integer points around their “C” in both inequalities or
one failed inequality. (Accept a clear indication that the point has been tested against
the inequalities such as a tick or cross without explicitly stating the numerical values)
4A1: CAO – must be in context, so do not accept x = 173 and y = 96 or (173, 96)

Question
Number

Scheme

Marks

M1
A1
6(a)

M1
A1
(4)

(b)

21 (hours)
4+5+7+4+7+9+7+6+2+5+8

(c)

21

B1

(1)

M1 A1

(2)

64

= 21 ≈ 3.048 so at least 4 workers required

M1
A1
(d)
A1
A1

(4)

e.g.
M1
(e)

A1ft
A1
see alternatives below

14 marks

(3)

a1M1
a1A1
a2M1
a2A1
b1B1
c1M1
c1A1
d1M1
d1A1
d2A1
d3A1
e1M1
e1A1ft

e2A1

Notes for Question 6
All top boxes complete, values generally increasing in the direction of the
arrows (‘left to right’), condone one rogue value which is a number in a top box
greater than the subsequent value
CAO (top boxes)
All bottom boxes complete, values generally decreasing in the opposite
direction of the arrows (‘right to left’), condone one rogue value which is a
number in a bottom box greater than the previous value. Condone missing 0
and/or their 21 (at the end event) for the M mark only
CAO (bottom boxes)
CAO
64 (+/-9)/”21” a calculation using the sum of the activities (accept a total in the
range 55 – 73) divided by their finish time or sight of awrt 3.05 (accept 3.04
truncated)
CAO – 4 note an answer of 4 with no working is M0
Cascade Chart not a schedule. At least 7 activities including at least 4 floats
Critical activities (AFJ) correct and at least 3 non-critical activities correct
At least 6 non-critical activities correct
CAO All 11 activities present (just once). No errors.
Schedule not a cascade (Gantt) chart. 3 ‘workers’ used at most and at least 8
activities placed.
All 11 activities present (just once) with a finish time of 22 (ft their end time +
1). Condone at most two errors. An activity can give rise to at most three
errors; one on duration, one on time interval and only one on IPA
3 workers. All 11 activities present (just once). No errors.
The table shows the possible time intervals to allow the project to be completed
by 3 workers in 22 hours

Possible alternative schedules for (e). This is not exhaustive.

Note: it is possible to swap J with I and K (I starts at 14) in the top diagram (and in the main
scheme), J with G in the second diagram, J with I and G (J starts at 13) in the third diagram
and J with I and H (I starts at 14) in the bottom diagram.

7.
(a)

Maximise
Subject to

B1
B1
M1 A1
M1 A1

Use

to obtain two values of y, leading to

(b)

M1
A1ft

Minimum profit (£)159.25, Maximum profit (£)561.25

A1
9 marks

a1B1
a2B1
a1M1
a1A1

Notes for Question 7
CAO objective function (oe) + maximise (accept max but not maximum) Do not
ISW if converted to integer coefficients without a correct multiple of P.
CAO (
)
where
is any inequality (accept 2.5y
x o.e. for M1 only)
or special case
(must be integers)
CAO (
)
where

is any inequality

a2M1

a2A1
b1M1
b1A1ft
b2A1

(6)

If they use 75% only award this mark when this is converted to a fraction or
decimal (which may be implied by the correct fully simplied inequality)
CAO (
) (or equivalent rearrangement, but must be fully simplified)
Obtaining two values of (by substituting
into their
inequalities but not y ≥ 0)
Correct maximum and minimum values for y (ft y for the special case
only; accept if y ≥ 2.5x seen in (a)) either as inequalities or stated values
(If they have
their minimum value is 250)
CAO on minimum and maximum profit (The correct minimum and maximum
values with no incorrect working seen implies M1 A1 A1)

(3)

Pearson Education Limited. Registered company number 872828
with its registered office at 80 Strand, London, WC2R 0RL, United Kingdom

Advertisement