Mathematics · June 2026 · Mark scheme · S3

Edexcel IAL Mathematics mark scheme for S3, June 2026, file IAL_MATHS_2026_JUNE_S3_MS_1787724199098.pdf.

Advertisement
Loading the paper…
Text of this paper

Mark Scheme (Results)
Summer 2026
Pearson Edexcel International Advanced Level
In Statistics S3 (WST03) Paper 01

Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s
largest awarding body. We provide a wide range of qualifications
including academic, vocational, occupational and specific
programmes for employers. For further information visit our
qualifications websites at www.edexcel.com or www.btec.co.uk.
Alternatively, you can get in touch with us using the details on our
contact us page at www.edexcel.com/contactus

Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to
help everyone progress in their lives through education. We believe in every
kind of learning, for all kinds of people, wherever they are in the world.
We’ve been involved in education for over 150 years, and by working across
70 countries, in 100 languages, we have built an international reputation for
our commitment to high standards and raising achievement through
innovation in education. Find out more about how we can help you and your
students at: www.pearson.com/uk

Summer 2026
Question Paper Log Number P79510A
Publication Code WST03_01_2606_MS
All the material in this publication is copyright
© Pearson Education Ltd

General Marking Guidance
•

All candidates must receive the same treatment. Examiners must mark the
first candidate in exactly the same way as they mark the last.

•

Mark schemes should be applied positively. Candidates must be rewarded
for what they have shown they can do rather than penalised for omissions.

•

Examiners should mark according to the mark scheme not according to
their perception of where the grade boundaries may lie.

•

There is no ceiling on achievement. All marks on the mark scheme should
be used appropriately.

•

All the marks on the mark scheme are designed to be awarded. Examiners
should always award full marks if deserved, i.e. if the answer matches the
mark scheme. Examiners should also be prepared to award zero marks if the
candidate’s response is not worthy of credit according to the mark scheme.

•

Where some judgement is required, mark schemes will provide the principles
by which marks will be awarded and exemplification may be limited.

•

When examiners are in doubt regarding the application of the mark scheme to a
candidate’s response, the team leader must be consulted.

•

Crossed out work should be marked UNLESS the candidate has replaced it
with an alternative response.

EDEXCEL IAL MATHEMATICS
General Instructions for Marking
1. The total number of marks for the paper is 75.
2. The Edexcel Mathematics mark schemes use the following types of marks:

•

M marks: Method marks are awarded for ‘knowing a method and attempting to
apply it’, unless otherwise indicated.

•

A marks: Accuracy marks can only be awarded if the relevant method (M) marks have
been earned.

•

B marks are unconditional accuracy marks (independent of M marks)

Marks should not be subdivided.
3. Abbreviations

These are some of the traditional marking abbreviations that will appear in the mark
schemes and can be used if you are using the annotation facility on ePEN:
•

bod – benefit of doubt

•

ft – follow through
o the symbol will be used for correct ft

•

cao – correct answer only

•

cso – correct solution only. There must be no errors in this part of the question to
obtain this mark

•

isw – ignore subsequent working

•

awrt – answers which round to

•

SC – special case

•

oe – or equivalent (and appropriate)

•

d… or dep – dependent

•

indep – independent

•

dp – decimal places

•

sf – significant figures

•

 – The answer is printed on the paper or ag- answer given

•

or d… – The second mark is dependent on gaining the first mark

4. All A marks are ‘correct answer only’ (cao), unless shown, for example, as A1 ft to indicate

that previous wrong working is to be followed through. After a misread however, the
subsequent A marks affected are treated as A ft, but manifestly absurd answers should
never be awarded A marks.

5. For misreading which does not alter the character of a question or materially simplify it,

deduct two from any A or B marks gained, in that part of the question affected. If you
are using the annotation facility on ePEN, indicate this action by ‘MR’ in the body of the
script.

6. If a candidate makes more than one attempt at any question:
a) If all but one attempt is crossed out, mark the attempt which is NOT crossed out.
b) If either all attempts are crossed out or none are crossed out, mark all the attempts

and score the highest single attempt.

7. Ignore wrong working or incorrect statements following a correct answer.

Question
Number

1(a)

Scheme

∑d

2

Marks

= 1 + 1 + 4 + 1 + 0 + 1 + 0 + 9 + 1[ = 18]

M1

6 × '18'
1−
0.85
rs =
=
9 ( 92 − 1)

(b)

(c)

H0 : ρ = 0

M1A1
(3)

H1 : ρ > 0

B1

Critical Value rs = 0.6 or CR: rs 0.6
Reject H0 or significant or does lie in the critical region
There is evidence to suggest that there is a positive relationship between the position
in the 100 m freestyle and the position in the 200 m freestyle

B1
M1

The value of n will decrease
∑ d 2 would decrease/the difference in ranks for C and H would decrease

B1

[So SRCC will increase]

(b)

B1

M1

for finding the difference between the position in the 100 m freestyle and the 200 m freestyle and
d 2 . May be implied by 18. (Allow one error)
evaluating

M1

for using 1 −

A1

Cao NB 0.85 scores 3/3 (unless from obvious incorrect working)

B1
B1
M1
A1

(c)

(4)

(2)
Total 9

Notes

(a)

A1

B1
B1

∑

6∑ d 2

9 ( 9 − 1)
2

with their

∑d

2

for both hypotheses correct. Must be in terms of ρ or ρ s . Must be attached to H 0 and H1
Condone use of p
for CV of 0.6
a correct statement ft part (a) and their CV – no context needed but do not allow contradicting
non contextual statements. This may be implied by a correct contextual conclusion on its own. If
part a not answered and/or no CV stated then M0
A correct contextual conclusion which is rejecting H 0 . Allow there is positive correlation or a
description of the relationship e.g. The higher the position in 100 m race the higher the position
in the 200 m race oe

(

)

For a correct comment about n decreasing e.g. n n 2 − 1 decreases
NB This is M1 on epen
a correct explanation about what would happen to
ranks for C and H
NB This is A1 on epen

∑d

2

or a comment about the difference in

Question
Number
2(a)

(b)

Scheme

Marks

115 ×130
= 59.8
250

M1A1

H 0 : There is no association between salary and university education

H1 : There is an association between the salary and university education

Observed
52

∑

"59.8"

M1

2

= 1.017...

2

M1A1

=
2.908 + "1.017" =
3.925
E
ν = (2 − 1)(2 − 1) = 1
χ (0.05)
= 3.841 ⇒ CR: X  3.841
[In the CR/Significant/Reject H0] There is evidence of an association between the
salary and education
2
1

(a)
(b)

2

M1

B1

2

E

( 52 − "59.8")

“59.8”

(O − E )

(O − E )

Expected

(2)

Notes
Row total×Column total
for use of
May be implied by 59.8
Total

B1
B1ft
A1ft
(7)
Total 9

A1

Cao

B1

both hypotheses correct with salary and education. May be written in terms of independence

M1

for use of

(O − E )
E

2

ft their expected value in part (a) May be implied by 3.925 or 3.93

M1

for 2.908 + 1.017 ft their

A1

for 3.925 Allow 3.93
ν = 1 Implied by 3.841

B1
B1ft

A1ft

(O − E )
E

2

May be implied by 3.925 or 3.93

for 3.841 or ft their DoF [For reference ν = 2 : 5.991 ν = 3 : 7.815 ν = 4 : 9.488]
This mark is independent of the hypotheses. The conclusion must be consistent for the correct
hypotheses.
For a correct contextual conclusion ft their

∑

(O − E )
E

2

and their CV.

Must include salary and education. May be in terms of independence.

Question
Number
3(a)

Scheme

Marks

3780


 y= 90 ⇒  y= 42


164599.29 − 90(42) 2
 s y 2 = 
90 − 1

B1
M1

= 65.61

(b)

A1
H1 : µW − µ E < 0

H 0 : µW − µ E =
0

B1

40 − "42"− 0
18.49 "65.61"
+
90
90
= –2.0689…
One tailed CV: Z = − 1.6449 or CR: Z  − 1.6449
In CR/Significant/Reject H 0
Sufficient evidence to support the zoologist’s claim
z=

(c)
(a)

(b)

A1
B1
M1
A1ft
B1

2

(7)

(1)
Total 11

Notes

B1

for y = 42

M1

a correct method for finding an unbiased estimate of the variance e.g.

A1

Cao
both hypotheses correct. Allow equivalent hypotheses. Must be in terms of µ Allow other letters

B1
M1

A1ft

∑y

2

− n( y ) 2
n− 1

e.g. µ x and µ y
an attempt at

z=

a −b−0
c
d
+
90 90

with at least 2 of a, b, c or d correct. Allow ±

40 − "42"− 0
Allow ±
18.49 "65.61"
+
90
90

A1

awrt –2.07 (Allow awrt 2.07)

B1

1.6449 or better seen
A correct statement ft their test statistic and their CV – need not be contextual but do not allow
contradicting non contextual comments. May be implied by a correct contextual statement on its
own
A correct contextual statement ft their test statistic and their CV. Must contain zoologist’s claim
(allow belief) or a correct conclusion based on the zoologists claim with weight, Western and
Eastern e.g. the [mean] weight of Western [grey kangaroos] is less than Eastern [grey
kangaroos]
for the assumption that sample variance = population variance for both samples

M1

A1ft
(c)

M1A1ft

Assumed that s = σ for both samples
2

(3)

B1

Question
Number
4(a)
(b)

Scheme
 1
B  4, 
 6
 1
H 0 : B  4,  is a good model
 6

Marks
B1
 1
H1 : B  4,  is not a good model
 6

4

B1

3

5
E( X =0) =  × 200 =96.4506...
6
2

5 1
E( X ==×
1) 4   ×   × 200 =
77.1604...
6 6

2

5 1
E( X ==
2) 6 ×   ×   × 200 =
23.1481...
6 6
3

M1M1A1
4

5 1
E( X =
3) =×
4   ×   × 200 =
3.0864...
6 6

1
E( X =4) =  × 200 =0.15432...
6

(O − E )

2

E

O2
E

96.45

1.9036…

125.4…

64

77.16

2.2444…

53.0…

26

26.39

0.005473…

25.6…

O

E

110

(O − E )

2

O2
4.153...
∑ E = 4.153... or ∑ E − 200 =
ν = 2 CR: χ 2 > 9.21
 1
Insufficient evidence that B  4,  is not a good model
 6
(c)(i)
(ii)

(a)

(b)

M1M1

A1
B1B1ft
dA1
(10)

Use the data to estimate p/ p may not be 1

B1

Degrees of freedom reduced by 1 or critical value will decrease/critical region will
increase

B1

6

B1

B1

binomial with n = 4 and p = 1
6


Notes

(2)
Total 13

1
6

both hypotheses correct. B  4,  only needs to be mentioned once. Condone H 0 : Binomial

M1

is a suitable model H1 : Binomial is not a suitable model provided p = 1 is seen in part (a)
6
a correct binomial probability seen (May be implied by a correct expected value)

M1

a correct method to find an expected value (May be implied by a correct expected value)

A1

At least 4 expected values correct to 3 significant figures or better
for combining (2, 3 and 4) to ensure that all expected frequencies are > 5 May be implied by
awrt 4.15

M1
M1

(1)

2
for a correct method to find either ( O − E ) or O (May be implied by a correct value)
2

E

E

A1

for awrt 4.15

B1
B1ft

for DoF = 2
for a correct CV ft their DoF [For reference ν = 1 : 6.635 ν = 3 : 11.345 ν = 4 : 13.277 ]

dA1

Dep on 3rd M mark. For a correct conclusion. Allow Binomial is a good model

(c)(i)

B1

(ii)

B1

correct comment about p e.g. p will be 0.1587… (allow awrt 0.159)
correct comment about the reduction in DOF oe e.g. Degrees of freedom will decrease.
Allow DOF = 1 if DOF was 2 in their test or a correct comments about the critical value/critical
region Allow CV = 6.635 if CV was 9.210 in their test

Question
Number
5(a)

Scheme
 24.7034 + 26.8966 
=  25.8

2

B1

26.8966 − 24.7034 =
2 ×1.6449 ×
(b)

σ
σ
oe or 26.8966 − "25.8" = 1.6449 ×
oe or
36
36

σ
"25.8"− 24.7034 =
1.6449 ×
oe
36
6(26.8966 − 24.7034)
6(26.8966 − 25.8)
= σ oe or
= σ oe
2(1.6449)
1.6449
3.2898
σ 2
6(25.8 − 24.7034)
σ = 2.1932 oe or = oe
or
= σ oe or
6

1.6449
leading to σ = 4*

(c)

Marks

6

3

(3)

4
2× z ×
=
1.6 oe
36
z = 1.2

M1

P( Z > 1.2) =
0.1151 or P( Z < 1.2) =
0.8849

A1
M1

= 77

M1
A1

awrt 77

4
< 0.6 oe
n
8 × 1.6449 
n>
21.932  or
⇒ n =
0.6

2 ×1.6449 ×

n = 481.01… so n = 482

n>

8 ×1.64485... 
21.9313...
⇒ n =
0.6

or n = 480.98… so n = 481

Notes

B1
M1
B1
A1*cso

(c)

dM1
A1

(3)
Total 12

Cao

2 × z value ×
for 26.78 − 24.82 =
(b)

(5)

M1

Mark parts (a) and (b) together
(a)

M1B1

A1*

Confidence level = 100 × (1 − 2 × 0.1151) or 100 × ( 2 × 0.8849 − 1)

(d)

(1)

"25.8"− 24.82 = z value ×

σ
σ
oe or 26.78 − "25.8" = z value ×
oe or
36
36

σ
oe ft their 25.8
36

1.6449 or better
at least one line of working from M1 to the given answer with no incorrect working seen (Allow
4.00)

4
=
1.6 may be implied by z = 1.2
36

M1

for 2 × z ×

A1

z = 1.2
for P( Z > 1.2) =
0.1151 or P( Z < 1.2) =
0.8849 ft their z may be implied by 0.7699 or awrt
77

M1

M1
A1
(d)

M1
dM1
A1

for 100 × (1 − 2 × 0.1151) ft their 0.1151 or 100 × ( 2 × 0.8849 − 1) ft their 0.8849 May be
implied by awrt 77
Awrt 77
for 2 × z value ×
Condone = or 

4
< 0.6 z value must either be correct or consistent with part (b)
n

dependent on previous M mark. Correct rearrangement to get n > ... or n > …
Condone = or 
n = 482 or n = 481 (Must be clear that their answer matches their working)

Question
Scheme
Number
6(a)
[Continuous] uniform on the interval [0, 15]
(b)

mean = 7.5
standard deviation =

15
= 4.330...
12
(c)

(15 − 0 )

2

A1

(a)

B1

(b)

B1

for the correct distribution stated (need uniform and correct interval) Allow U[0, 15]
Condone U(0, 15) Must be seen in part (a)
Cao

M1

for a correct method for finding the standard deviation

A1

awrt 4.33 Condone

5 3
2
3

for writing or using N  7.5,  oe May be seen in a correct standardisation
8

A1
M1

for standardising using either 7.2 or 7.8 and their mean and standard deviation. The
standardisation must be shown for this mark
for a fully correct expression for either 7.2 or 7.8. May be implied by ± awrt 0.49
for p – (1 – p) or 2(p – 0.5) oe

dA1

Dep on 2nd M mark for awrt 0.376

M1

(1)

M1

12

3

By the CLT T ~ N  7.5, 
8



 7.2 − "7.5"
7.8 − "7.5" 
 =  P ( −0.49 < Z < 0.49 ) 
P ( 7.2 < T < 7.8 ) = P 
<Z<


3
3
" "
" " 

8
8


= 0.6879 – (1 – 0.6879) (Calculator gives 0.68789…)
= 0.3758 (Calculator gives 0.37579…)
awrt 0.376

M1

B1
B1

Notes

(c)

Marks

(3)
M1

M1A1
M1
dA1

(5)
Total 9

Question
Number
7(a)

Scheme

Marks

E(C ) = 4 µ − 3µ − µ[= 0]

Var(C ) = 16σ 2 + 9σ 2 +

σ2
3

M1

 76σ 2 
=
3 

M1

 76σ 2 
N  0,

3 

A1
(3)

(b)

(c)





σ − "0" 
P Z <

76σ 2 
"
"

3


= 0.5793 Calc: 0.5787

M1A1
awrt 0.579

dA1

11W − 10W2 − W3
4W1 − 3W2 − W = 1
3
E(Q) = 0

M1
B1

121σ + 100σ + σ  222σ
74σ 
= =
9
9
3 





2σ − 0 
P Z <

74σ 2 


3 

= 0.6554 Calc: 0.6564…
awrt 0.655 – awrt 0.656
=
Var(
Q)

(a)

(b)

(c)

2

2

2

2

2

M1

M1A1
dA1

(6)
Total 12

Notes

M1

for a correct method to find E(C). May be implied by E(C) = 0

M1

for a correct method to find Var(C). May be implied by Var(C) =

A1

Cao
for standardising ft their mean and their standard deviation. Allow ±
May be implied by ± awrt 0.199

M1

76σ 2
3

76σ 2
3

A1

for a fully correct standardisation using 0 and

dA1

dependent on previous A1 awrt 0.579
for writing Q as a single fraction (May be implied by 2nd M1)

M1

Allow 4W1 − 3W2 − W1 − W2 − W3 oe

B1

for E(Q) = 0 May be seen in a standardisation
for a correct method to find Var(Q) May be seen in a standardisation.

M1
M1

1
3

(3)

1
3

May be implied by Var(Q) =

Allow ±May be implied by ± awrt 0.199

1
3

74σ 2
3

for standardising using 0 and their standard deviation

74σ 2
3

A1

for a fully correct standardisation using 0 and

dA1

Dependent on the previous A mark. For answer in the range awrt 0.655 to awrt 0.656

oe

Advertisement