Mathematics · June 2025 · Mark scheme · S1
Edexcel IAL Mathematics mark scheme for S1, June 2025, file IAL_MATHS_2025_MayJune_S1_MS.pdf.
Text of this paper
Mark Scheme (Results)
Summer 2025
Pearson Edexcel International Advanced Level
In Statistics S1 (WST01) Paper 01
Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding body. We
provide a wide range of qualifications including academic, vocational, occupational and specific
programmes for employers. For further information visit our qualifications websites at
www.edexcel.com or www.btec.co.uk. Alternatively, you can get in touch with us using the details
on our contact us page at www.edexcel.com/contactus.
Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help everyone progress
in their lives through education. We believe in every kind of learning, for all kinds of people,
wherever they are in the world. We’ve been involved in education for over 150 years, and by
working across 70 countries, in 100 languages, we have built an international reputation for our
commitment to high standards and raising achievement through innovation in education. Find out
more about how we can help you and your students at: www.pearson.com/uk
Summer 2025
Question Paper Log Number P76176A
Publications Code WST01_01_2506_MS
All the material in this publication is copyright
© Pearson Education Ltd 2025
General Marking Guidance
•
All candidates must receive the same treatment. Examiners
must mark the first candidate in exactly the same way as they
mark the last.
•
Mark schemes should be applied positively. Candidates must
be rewarded for what they have shown they can do rather
than penalised for omissions.
•
Examiners should mark according to the mark scheme not
according to their perception of where the grade boundaries
may lie.
•
There is no ceiling on achievement. All marks on the mark
scheme should be used appropriately.
•
All the marks on the mark scheme are designed to be
awarded. Examiners should always award full marks if
deserved,
i.e.
if
the
answer
matches
the
mark
scheme. Examiners should also be prepared to award zero
marks if the candidate’s response is not worthy of credit
according to the mark scheme.
•
Where some judgement is required, mark schemes will
provide the principles by which marks will be awarded and
exemplification may be limited.
•
When examiners are in doubt regarding the application of the
mark scheme to a candidate’s response, the team leader
must be consulted.
•
Crossed out work should be marked UNLESS the candidate
has replaced it with an alternative response.
General Instructions for Marking
1. The total number of marks for the paper is 75.
2. The Edexcel Mathematics mark schemes use the following types of marks:
•
•
•
•
M marks: method marks are awarded for ‘knowing a method and
attempting to apply it’, unless otherwise indicated.
A marks: Accuracy marks can only be awarded if the relevant method (M)
marks have been earned.
B marks are unconditional accuracy marks (independent of M marks)
Marks should not be subdivided.
3. Abbreviations
These are some of the traditional marking abbreviations that will appear in
the mark schemes.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
bod – benefit of doubt
ft – follow through
the symbol will be used for correct ft
cao – correct answer only
cso - correct solution only. There must be no errors in this part of the
question to obtain this mark
isw – ignore subsequent working
awrt – answers which round to
SC: special case
oe – or equivalent (and appropriate)
dep – dependent
indep – independent
dp decimal places
sf significant figures
The answer is printed on the paper
The second mark is dependent on gaining the first mark
4.
All A marks are ‘correct answer only’ (cao.), unless shown, for example, as
A1 ft to indicate that previous wrong working is to be followed through.
After a misread however, the subsequent A marks affected are treated as
A ft, but manifestly absurd answers should never be awarded A marks.
5.
For misreading which does not alter the character of a question or
materially simplify it, deduct two from any A or B marks gained, in that
part of the question affected.
6.
If a candidate makes more than one attempt at any question:
•
If all but one attempt is crossed out, mark the attempt which is NOT
crossed out.
•
If either all attempts are crossed out or none are crossed out, mark
all the attempts and score the highest single attempt.
7.
Ignore wrong working or incorrect statements following a correct answer.
Question
1 (a)
(b)
Scheme
0.85
B1
3X – 3 X + 2 → X 2.5
M1
A1
(1)
[P( X 2.5) =] 0.5
(c)
[E ( X ) =]1 0.3 + 2 0.2 + 3 0.35 + 4 0.15 =
2.35
(d)
E ( X ) =1 0.3 + 2 0.2 + 3 0.35 + 4 0.15= 6.65
Var( X ) = "6.65"− "2.35"2
2
2
= 1.1275*
(e)
Var ( 5 − 2 X ) = 4.51
2
2
2
(2)
M1
A1
(2)
M1
M1
A1*
(3)
B1
(1)
Total 9
(a)
(b)
(c)
(d)
(e)
Notes
Look out for answers given next to the questions
Must be identified as answer to part (a) (not just seen anywhere in the script). Ignore their
B1 oe
label.
M1 for X < 2.5 (condone X > 2.5, X = 2.5) or X < 2 or for identifying X = 1 and X = 2 (may be
circled, ticked, or otherwise clearly identified as the only 2 x-values that satisfy the inequality)
or 0.3 + 0.2
A1 oe Correct answer scores 2 out of 2.
M1 for an attempt to find E(X) with at least 3 correct products or terms with intention to add
0.3 + 0.4 + 1.05 + 0.6 (may be seen in table at the start of the question)
Division by 4 or any k (k ≠ 1) is M0
A1 oe Correct answer scores 2 out of 2
M1 for an attempt to find E(X2) with at least 3 correct products or terms with intention to add
0.3 + 0.8 + 3.15 + 2.4 (may be seen in table at the start of the question or elsewhere)
Division by 4 or any k (k ≠ 1) is M0
6.65 on its own does not imply this mark
M1 for 6.65 – 2.352 ft their E(X) and E(X2).
A full calculation scores M1M1 e.g. 12 0.3 + 22 0.2 + 32 0.35 + 42 0.15 − 5.5225
A1*cso dependent on both M marks for a fully correct expression for Var(X) leading to correct given
answer 1.1275 with no incorrect working seen.
6.65 − 2.352 = 1.1275 on its own scores M0M1A0
B1 for 4.51 oe
Question
2(a)
Scheme
xB = 54 45 − 24 47 = 1302
x =
24 47 + 30b
= 45
54
or
M1
54 45 − 24 47
= 43.4 *
30
A1*
(2)
(b)
(66876 + 73826) −
66876 + 73826
− 452 =
54
or
24.095….
24302
54
M1
54
awrt 24.1
A1
(2)
(c)(i)
(ii)
(iii)
(a)
SC:
(b)
(c)(i)
(ii)
(iii)
No effect as e.g. adding 2 to each does not change the variance
Increase as e.g. the total mark will increase
Decrease as e.g. the mean mark of class B is closer to the mean mark of class A
B1
B1
B1
(3)
Notes
Total 7
M1 for a correct method to find the total marks for class B
or for a correct equation for b eg 1128 + 30b = 2430
but not 30b = 1302 on its own
A1* a fully correct method shown leading to 43.4
For the equation in b there should be 1 line of intermediate working between the equation and the
given answer.
24 47 + 30 43.4
= 45 scores M1A0
Verification method e.g.
54
M1 for a correct method to find the standard deviation including root
A1 awrt 24.1
correct answer scores 2 out of 2
allow s = awrt 24.3
B1 for no effect and a correct reason:
• Spread/variation/range or difference (in marks) remains the same o.e.
• Addition has no effect/only multiplication/division affects the variance o.e.
Variance not affected by coding on its own is B0
B1 for increase and a correct reason:
• Total/mark/score/∑x increases o.e.
• Mean of class B increases (by 2 marks) o.e.
• Total/mark/score/∑x for class B increases (by 60 marks) o.e.
Incorrect statements score B0 e.g. “The mean (of all 54 students) increases by 2” or e.g. “Total for
class B increases by 48 marks”
Ignore calculation if seen, but do not allow increases by 1.11…. on its own to score the mark here.
B1 for decrease and correct reason:
• Mean/marks of class B now closer to mean/marks of class A o.e.
• Values/marks/scores are closer together o.e.
• Less spread/variation between values/marks/scores (for class A and class B) o.e.
Question
3 (a)
Scheme
eg They represent / analyse / solve (real world problems)
They improve understanding / simplify (the real world)
Can be repeated/ adapted / refined
To show the relationship between variables/show trends
B1
(1)
(b)
Sww
339.252
= 445.57 (to 2 decimal places)*
=10036.45 −
12
B1*
(1)
(c)
29.5
−91.55
29.5 9.1
445.57
or Std = 14.4 −
or Sdd =
or Sdd = 75.9 −
2
12
11.5
12
11.5
Std = −7.9608...
Sdd = 3.3691... awrt 3.37
awrt −7.96
2
Std =
M1
A1A1
(3)
(d)
"− 7.9608..."
−91.55
or r =
r =
"3.3691..." 26.43
445.57 26.43
= – 0.8436…
M1
awrt – 0.844
A1
(2)
(e)
As the temperature increases, gas/consumption decreases
(f)
−91.55
[= – 3.4638…]
b=
26.43
339.25
9.1
a=
− "− 3.4638"
[= 30.897…] or
12
12
w = −3.46t + 30.9 *
B1ft
(1)
(g)
M1
a = awrt 28.3 − "− 3.4638" awrt 0.76
M1
A1*
(3)
11.5d = −3.46t + 30.9 oe eg d = −0.301t + 2.69
B1
(1)
(h)(i)
(ii)
2.0852…( m3)
the gas consumption will decrease by 0.3 m3
awrt 2.09
B1
B1ft
(2)
Total 14
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)(i)
(ii)
B1 for one valid reason why models are used
B0 for comments relating to time, cost, and predictions only. “Easy”/ “Easy to use” on its own is B0
Ignore extraneous non-contradictory comments once B1 has been scored.
B1* Correct numerical method to find Sww shown with an answer awrt 445.57
M1 Method to find Sdd or Std (implied by awrt −7.96 or awrt −7.97 or awrt 3.37 or awrt 3.38)
A1 awrt −7.96 or awrt 3.37
condone awrt −7.97 or awrt 3.38 for this mark
A1 awrt −7.96 and awrt 3.37
M1 for a correct method with Sww 10036.45
A1 awrt –0.844 correct answer scores 2 out of 2
an answer of awrt –0.843 scores M1A0
B1ft for correct contextual interpretation with bold words o.e., ft “their (d)”
Allow as gas increases, temp(erature) decreases o.e.
B0 for “their (d)” outside the range [–1, 1]
Interpreting numerically as a gradient is B0.
M1 for a correct numerical expression to find the value of b
M1 for a correct method to find a allow “their b” or just b in the expression
w − awrt 28.3 = "− 3.46..."(t − awrt 0.76)
A1* (dep on M1M1) for correct given equation. Allow w = awrt − 3.46t + awrt 30.9 No fractions.
t +30.9
B1 Any correct equation seen (ISW) (allow fractions). allow d = −0.3t + 2.69 , d = −3.4611.5
B1 awrt 2.09
B1ft for decrease awrt 0.3m3 must include units ft their changed gradient B0 for decrease by –0.3m3
Question
4 (a)
0.2 =
P (C D )
0.45
Scheme
M1
[ P(C D) =] 0.09
(b)
(a)
0.59 = P(C ) + 0.45 − "0.09"
= 0.23
A1
[→ P(C ) = 0.59 − 0.45 + "0.09" ]
(2)
M1
A1
(2)
Notes
Total 4
Mark (a) and (b) together
M1 for substitution of 0.2 and 0.45 into a correct equation for P ( C D ) (allow any rearrangement)
A1 oe correct answer scores 2 out of 2
Must be clearly identified as the answer to part (a).
A correct Venn diagram on its own is not sufficient.
M1 for correct substitution of 0.59, 0.45 and “their a” into P ( C D ) = P ( C ) + P ( D ) − P ( C D )
(b)
Implied by “their (b)” – “their(a)” = 0.14
0.59 = P(C ) + 0.45 is M0
Only ft 0 < “their (a)” < 1 If “their (a)” is outside this range, then M0
A1 oe correct answer scores 2 out of 2
Question
5 (a)
Speed (km/h)
20 „ x 25
25 „ x 30
30 „ x 40
Scheme
Number of cars
54
90
60
fd
10.8
18
6
M1
90 x = 54 10
18 x = 10.8 10
or
nd
height of 2 tallest bar = 6 (cm)
M1
A1
(3)
(b)
2
30 + 15 + 6
15
= 45.8
,
therefore 46 cars.
M1, A1
(2)
(c)
58.5
Q2 = 25 + 5
90
= 28.25
M1
awrt 28.3
A1
(2)
(d)(i)
(ii)
24.75
10
Q3 = 30 +
60
= 34.125
“34.125” – 25.14
= 8.99
M1
awrt 34.1–34.3
awrt 9.0 – 9.1
A1
M1
A1
(4)
(e)
Q2 − Q1 (3.11) Q3 − Q 2 (5.875)
therefore, positively skewed
M1
A1
(f)
The suggestion is not suitable as part (e) shows the data is skewed/not symmetric.
B1ft
(2)
(1)
Total 14
(a)
(b)
(c)
(d)(i)
(ii)
(e)
(f)
M1 for evidence of fd = f/w or for identifying/using 25 „ x 30 as the tallest bar
or 20 „ x 25 as the 2nd tallest bar or an answer of awrt 3.33
M1 identifying/using 25 „ x 30 as the tallest bar and 20 „ x 25 as the 2nd tallest bar.
Implied by correct working seen or correct answer. Allow equivalent ratio equation.
A1 6 cao
Be careful the f.d. of the 3rd bar is 6, so 60 ÷ 10 = 6 on its own is M1M0A0.
Answer only scores M1M0A0
M1 for 30 + 15 + k where 0.5 „ k „ 1 (implied by 45.8) or k + 219 − (54 + 90 + 30)
A1cao 45 or 46 (must be an integer). Correct answer only scores 2 out of 2.
m − 25
30 − m
30 − 25
5
58.5
31.5
M1 for
or
=
=
5 or
5 or
112.5 − 54 144 − 54
144 − 112.5 90
90
90
Allow use of 113 instead of 112.5
A1 for awrt 28.3
Q3 − 30
40 − 30
40 − m
10
35.25
24.75
M1 for
or
=
=
10 or
10 or
168.75 − 144 204 − 144
204 − 168.75 60
60
60
Allow use of any value from 168.75 to 169.5
A1 awrt 34.1 to awrt 34.3 an answer in this range scores 2 out of 2 unless obvious incorrect working
M1 for “their (d)(i)” substituted into “Q3” – awrt 25.1
A1 awrt 9.0 or awrt 9.1 Allow 9 if correct working seen.
M1 A correct comparison which must follow from their figures. Must have 25.14 < “ Q2”< “Q3”
A1 dep on M1 and dep on their figures being consistent with positive skew. Negative skew is A0.
Allow calculation of estimated mean awrt 30.6 > “28.3” so +ve for M1A1
B1ft For not suitable and a correct supporting reason which is consistent with “their (e)”
Question
6(a)(i)
(ii)
Scheme
508 − 502
P ( X 508) = P Z
= 2
3
= 0.0228
M1
awrt 0.0228
(2)
P ( 496 X 508) = 1 − 2 "0.0228" or "0.9772" − (1 − "0.9772")
= 0.9544
A1
M1
awrt 0.954
A1ft
(2)
(b)
"0.0228" (1 − "0.0228") 6
2
2
M1 dM1
= 0.002978… (calc gives 0.002965…)
awrt 0.00297 or awrt 0.00298
A1
(3)
(c)
1038.51 − 1024
=
= 1.0364
M1
1038.51 − 1024
= 14.000.. (calc 13.999…)*
1.0364
A1*
(2)
(d)(i)
k − 502
1024 − 2k
and
14
3
k − 502 1024 − 2k
=
oe
e.g. 14k − 7028 = 3072 − 6k
3
14
M1
M1
k = 505
(ii)
(a)(i)
(ii)
A1
"505"− 502
P ( X 505) = P Z
= 1
3
= 0.1587
M1
awrt 0.159
A1
(5)
Notes
Total 14
M1 for standardising with 508, 502 and 3 allow ±
A1 awrt 0.0228 (dependent on M1 scored for standardising) . Answer must be in part (a)(i).
M1 ft their 0.0228
A1ft awrt 0.954 or from calculator 0.954499…. so allow 0.9545 Correct answer scores 2 out of 2.
ft their part (a) i.e. 1 – 2 × “their (a)” provided 0 < “their (a)” < 0.5
M1 For an expression in the form p 2 (1 − p ) A where A is an integer, A …1 and p is a probability
2
(b)
4
Allow A written in alternative forms eg C2
(c)
(d)(i)
(ii)
M1 dep on first M1 for A = 6 oe
A1 awrt 0.00297 or awrt 0.00298 (allow in standard form). Correct answer scores 3 out of 3.
14.51
1038.51 − 1024
= z with 1.03 „ z „ 1.04
= z or
M1 an equation in the form
A1* for a correct expression for with z = 1.0364 or better (calc 1.036433…) seen and awrt 14
M1 for both standardisations seen or used in an equation Allow use of their 14 from part (c)
M1 Correct equation with compatible signs - need not be simplified Allow use of their 14 from part(c)
A1 505 (allow awrt 505 coming from “their 14” used).
M1 for standardising with “505”, 502 and 3 or with “1010”, 1024 and 14 allow ±,
ft their value of k
may be implied by a correct answer
A1 awrt 0.159 Correct answer scores M1A1 in (d)(ii)
Question
Number
7(a)
Scheme
B1 M1A1
(3)
(b)
3
6
6
3
" " " "+ " " " " ,
9
8
9
8
=
(c)
3
6
6
5
3
1 − " " " " or " "+ " " " " ,
9
9
9
8
8
7
= oe
12
1
oe
2
M1, A1
(2)
M1, A1
(2)
(d)
3
2
" " " "
9
8 ,
7
" "
12
=
1
oe
7
M1, A1
(2)
(e)
1
n
n 12 n − 1 83 n
3
8 =
n
n − 1 n − 2 n − 3 235
1
2
4x 4x − 1
3x
x
3
=
8x 8x − 1 8x − 2 8x − 3 235
3 3 1
3
n ( 2 n − 1) =
n(n − 1)(n − 2)(n − 3) → 63n3 − 3198n 2 + 8448n − 4608 = 0
128
235
235n 2 = 256 ( n − 1)(n − 3) 21n 2 − 1024n + 768 = 0
or ( 3n − 6 ) ( 21n 2 − 1024n + 768 ) (n 2 ) 21n2 −1024n + 768 = 0
(a)
(b)
(c)
(d)
Notes
B1 1st branches correct oe allow 0.3 and 0.6
M1 for one correct 2nd branch 2/8 and 6/8 oe or 3/8 and 5/8 oe
A1 for both correct 2nd branches 2/8 and 6/8 and 3/8 and 5/8 oe
M1 for adding the two correct products of probabilities ft their probabilities
A1 0.5 oe Correct answer from no obvious incorrect working scores M1A1
M1 correct method used. ft their probabilities
A1 allow awrt 0.583
" 3 " " 82 " " 127 "
n
M1 for p or where n < 7. num>denom is M0. Indeped. e.g. 9
is M0
" 127 "
7
"7 "
12
(e)
NB:
A1 allow awrt 0.143
M1 for setting up the product of 4 probabilities with all of the denominators correct and
equating to 3/235 For the first term allow ½ oe (condone RHS method in terms of n)
M1 a fully correct equation
(condone RHS method in terms of n)
dM1 (dep on 2nd M mark) for forming a correct equation in terms of n removing all
terms in n from the denominator. For RHS method, only award if x is replaced by 8n
A1 (dep on all M marks) for a correct equation with b = –1024 and c = 768
Trial and improvement method → n = 48 satisfies the given conditions is M0M0M0A0
M1M1
dM1
A1
(4)
Total 13
Pearson Education Limited. Registered company number 872828
with its registered office at 80 Strand, London, WC2R 0RL, United Kingdom