Mathematics · June 2025 · Mark scheme · D1
Edexcel IAL Mathematics mark scheme for D1, June 2025, file IAL_MATHS_2025_MayJune_D1_MS.pdf.
Text of this paper
Mark Scheme (Results)
Summer 2025
Pearson Edexcel International Advanced Level
in Decision Mathematics D1 (WDM11) Paper 01
Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding body. We
provide a wide range of qualifications including academic, vocational, occupational and specific
programmes for employers. For further information visit our qualifications websites at
www.edexcel.com or www.btec.co.uk. Alternatively, you can get in touch with us using the details
on our contact us page at www.edexcel.com/contactus.
Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help everyone
progress in their lives through education. We believe in every kind of learning, for all kinds of
people, wherever they are in the world. We’ve been involved in education for over 150 years, and
by working across 70 countries, in 100 languages, we have built an international reputation for
our commitment to high standards and raising achievement through innovation in education.
Find out more about how we can help you and your students at: www.pearson.com/uk
Summer 2025
Question Paper Log Number P76408A
Publications Code WDM11_01_2506_MS
All the material in this publication is copyright
© Pearson Education Ltd 2025
General Marking Guidance
•
All candidates must receive the same treatment. Examiners
must mark the first candidate in exactly the same way as they
mark the last.
•
Mark schemes should be applied positively. Candidates must be
rewarded for what they have shown they can do rather than
penalised for omissions.
•
Examiners should mark according to the mark scheme not
according to their perception of where the grade boundaries
may lie.
•
There is no ceiling on achievement. All marks on the mark
scheme should be used appropriately.
•
All the marks on the mark scheme are designed to be awarded.
Examiners should always award full marks if deserved, i.e. if the
answer matches the mark scheme. Examiners should also be
prepared to award zero marks if the candidate’s response is not
worthy of credit according to the mark scheme.
•
Where some judgement is required, mark schemes will provide
the
principles
by
which
marks
will
be
awarded
and
exemplification may be limited.
•
When examiners are in doubt regarding the application of the
mark scheme to a candidate’s response, the team leader must
be consulted.
•
Crossed out work should be marked UNLESS the candidate has
replaced it with an alternative response.
EDEXCEL GCE MATHEMATICS
General Instructions for Marking
1. The total number of marks for the paper is 75.
2. The Edexcel Mathematics mark schemes use the following types of marks:
•
•
•
•
M marks: method marks are awarded for ‘knowing a method and attempting to apply
it’, unless otherwise indicated.
A marks: Accuracy marks can only be awarded if the relevant method (M) marks have
been earned.
B marks are unconditional accuracy marks (independent of M marks)
Marks should not be subdivided.
3. Abbreviations
These are some of the traditional marking abbreviations that will appear in the mark
schemes.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
bod – benefit of doubt
ft – follow through
the symbol
will be used for correct ft
cao – correct answer only
cso - correct solution only. There must be no errors in this part of the question to
obtain this mark
isw – ignore subsequent working
awrt – answers which round to
SC: special case
oe – or equivalent (and appropriate)
dep – dependent
indep – independent
dp decimal places
sf significant figures
The answer is printed on the paper
The second mark is dependent on gaining the first mark
4. All A marks are ‘correct answer only’ (cao.), unless shown, for example, as A1 ft to
indicate that previous wrong working is to be followed through. After a misread
however, the subsequent A marks affected are treated as A ft, but manifestly absurd
answers should never be awarded A marks.
5. For misreading which does not alter the character of a question or materially simplify it,
deduct two from any A or B marks gained, in that part of the question affected.
6. If a candidate makes more than one attempt at any question:
• If all but one attempt is crossed out, mark the attempt which is NOT crossed out.
• If either all attempts are crossed out or none are crossed out, mark all the
attempts and score the highest single attempt.
7. Ignore wrong working or incorrect statements following a correct answer.
Question
1 (a)
Scheme
(180 + 300 + 250 + 410 + 240 + 120 + 230 + 310 + 190)/600
= 3.72
Lower bound = 4
Marks
M1
A1
(2)
(b)
Van 1: 180
300
Van 2: 250
240
Van 3: 410
190
Van 4: 230
310
120
M1
A1
(2)
(4 marks)
Notes
a1M1
a1A1
Calculates (2230 +/-410)/ 600 a calculation using the sum of the activities
(accept a total in the range 1820 – 2640) (accept 3.71 as correct truncated
value). This can be awarded for sight of the calculation or awrt 3.7
CAO – must follow from a correct calculation or decimal (rounded or
truncated), so we must see either 2230/600 o.e. or awrt 3.7 - an answer of 4
with no working scores M0
b1M1
The correct first five items placed correctly (the bold values) and at least
seven values placed in bins (allow repeated values). Condone cumulative
totals or calculation of the remaining space for M1 only
b2A1
CSO
Question
Scheme
M1
2
(a)
Marks
PR PU UV PQ RS ST
A1
(2)
(b)
M1
A1ft
“540” x 2 = 1080 (metres)
(2)
(c)
M1
A1
A1
PRSTUVQP
880 (metres)
(3)
(d)
(metres)
M1
A1
(2)
(9 marks)
Notes
a1M1
Prim - first three arcs correctly chosen in order (PR, PU, UV, …) or first four
nodes {P, R, U, V, …}. If any explicit rejections seen at some point then M1
(max) only.
Order of nodes may be seen at the top of a matrix/table {1, -, 2, - , - , 3, 4 }.
Starting at any other node can score M1 only for first three arcs chosen
correctly
a1A1
CSO – all arcs correctly stated and chosen in the correct order (with no
additional arcs). They must be considering arcs for this mark (do not accept a
list of nodes or numbers across the top of the matrix unless the correct list of
arcs (in the correct order) is also seen)
b1M1
Calculates the weight of their MST and doubles
If their MST is incorrect, follow through the total for their tree (must be
exactly 6 arcs)
1080 or 2 x “their 540” (if any subsequent calculations are seen do not isw this
is A0) (1080 implies both marks)
b1A1ft
c1M1
NN route attempted, first five nodes correct PRSTU (accept arcs for this mark
PR, RS, ST, TU, …) (do not accept numbering across the matrix here unless
nodes or arcs are stated in the correct order)
c1A1
CAO – Route correct including return to P (accept arcs PR, RS, ST, TU, UV,
VQ, QP) (condone if arcs stated alphabetically instead of in route order)
c2A2
CAO – 880 (metres) (if they double the length of the NN route do not isw, this
is A0)
d1M1
Their “540” – 75 + two shortest from T (a new calculation to find the RMST
may be seen e.g. new table with T deleted and a new MST calculation, with
the correct 5 arcs circled PR PU UV PQ RS plus two shortest from T)
d1A1
CAO – A final answer of 720 implies both marks (if additional calculations
seen do not isw)
Question
3. (i)(a)
Scheme
Marks
Middle Right
Pivot
28
18
50
27
48
8
25
12
56
31
33
42
25
18
8
12
25
28
50
27
48
56
31
33
42
8, 56
8
18
12
25
28
50
27
48
31
33
42
56
12, 48
8
12
18
25
28
27
31
33
42
48
50
56
(18), 31, (50)
M1
A1
A1ft
A1
8
12
18
25
28
27
31
33
42
48
50
56
8
12
18
25
27
28
31
33
42
48
50
56
27, 42
Middle Left
Pivot
28
18
50
27
48
8
25
12
56
31
33
42
8
8
28
18
50
27
48
25
12
56
31
33
42
25
8
18
12
25
28
50
27
48
56
31
33
42
18, 48
8
12
18
25
28
27
31
33
42
48
50
56
(12), 31, 50
8
12
18
25
28
27
31
33
42
48
50
56
28, 33, (56)
8
12
18
25
27
28
31
33
42
48
50
56
(4)
(i)(b)
8
12
18
25
27
28
31
33
42
48
50
56
Pivot 31
M1
31 < 40 so discard 31 and below
33
42
48
50
56
Pivot 48
48 > 40 so discard 48 and above
A1
33
42
Pivot 42
42 > 40 so discard 42
A1
33
33 ≠ 40 so 40 is not in the list
Alternatively
56
50
48
42
33
31
28
27
25
18
12
8
Pivot 28
33
31
Pivot 42
33
31
Pivot 31
28 < 40 so discard 28 and below
56
50
48
42
42 > 40 so discard 42 and above
31 < 40 so discard 31
33
33 ≠ 40 so 40 is not in the list
(3)
(ii)
o.e.
B1
B1
(2)
(9 marks)
Notes
ia1M1
Quick sort using all 12 numbers (condone one item error or omission), pivot, p, chosen (must be
choosing middle left or right – choosing first/last item as the pivot is M0). After the first pass the list
must read (values less than the pivot), pivot, (values greater than the pivot). If only choosing one pivot
per iteration then M1 only
ia1A1
First and second passes correct, but not choice of pivots for 3rd pass
ia2A1ft
Third and fourth passes correct following through from their second pass and choice of pivots for the
third pass. The pivots for the third, and fourth passes must be consistent (so all MR or all ML)
ia3A1
CSO (correct solution only – all previous marks in this part must have been awarded) including a fifth
pass (with both 27 and 42 chosen as pivots MR or both 28 and 33 chosen as pivots ML)
Special Case for (a) If the candidate sorts into descending order they can score M1 as per the main
scheme (but with the values either side of the pivot reversed), A1 for a fully correct sort then A0
A0 even if the list is reversed at the end (so 2 marks max.). See below
ib1M1
Correct choice of pivot (must be using MR) (31 ascending or 28 descending) and discards 8 to 31 or 28
(must be using the sorted list, but could be sorted into either ascending or descending order) It must be
clear which values are being discarded or the reduced list must be shown. If pivots are retained, this will
score M1 only. Candidates may either compare with the actual values or the positions of items in a
correctly sorted list. The actual rejections may be shown as values from the list or the positions in the
list. (If they do not not have the correct 12 numbers in their sorted list in (a) they can score M1 only for
using their sorted list here)
ib1A1
2nd and 3rd pass correct choice of pivots and discards (if pivot not discarded A0)
ib2A1
CSO - Final pass correct, compares with 33 and concludes 40 is not in list
ii1B1
One inequality correct – if a list of inequalities is seen, they must clearly select from this list otherwise
B0
Both inequalities correct and combined to give a range of values (accept either form or list of values 16,
17, 18) (SC if just 16, 17, 18 seen accept this for both marks) (accept interval notation either (15, 19) or
[16, 18])
ii2B1
Special Case Descending Max M1 A1 A0 A0
Middle Right
Pivot
28
18
50
27
48
8
25
12
56
31
33
42
25
28
50
27
48
56
31
33
42
25
18
8
12
56, 8
56
28
50
27
48
31
33
42
25
18
12
8
48, 12
56
50
48
28
27
31
33
42
25
18
12
8
(50), 31, (18)
56
50
48
33
42
31
28
27
25
18
12
8
42, 27
56
50
48
42
33
31
28
27
25
18
12
8
Middle Left
Pivot
28
18
50
27
48
8
25
12
56
31
33
42
8
28
18
50
27
48
25
12
56
31
33
42
8
25
28
50
27
48
56
31
33
42
25
18
12
8
48, 18
50
56
48
28
27
31
33
42
25
18
12
8
50, 31, (12)
56
50
48
33
42
31
28
27
25
18
12
8
33, 28
56
50
48
42
33
31
28
27
25
18
12
8
Question
Scheme
Marks
4.
M1
(a)(i)
A1
(ACB
D)
A1
(EFG)
A1ft
(JH)
(ii)
Fastest route: ACBEFGJH
A1
Fastest time: 53 (minutes)
A1ft
(6)
(b)
Either calculates new fastest route AF(35) + FH(22) = 57
Or calculates the change to sections of the route e.g. ACDF compared with
ACBEF and FGJH compared with FJH
M1
Difference 57 – “53” = 4 (minutes) or 2 + 2 = 4 (minutes)
A1ft
(2)
(8 marks)
Notes
In (a) it is important that all values at each node are checked very carefully – the
order of the working values must be correct for the corresponding A mark to be
awarded e.g. at E the working values must be 27 26 in that order (so 26 27 is
incorrect)
It is also important that the order of labelling is checked carefully. The order of
labelling must be a strictly increasing sequence – so 1, 2, 3, 3, 4, … will be penalised
once (see notes below) but 1, 2, 3, 5, 6, … is fine. Errors in the final values and
working values are penalised before errors in the order of labelling
ai1M1
A larger value replaced by a smaller value at least twice in the working values at either B,
D, E, F, G, H, J
ai1A1
All values at A, C, B and D correct and the working values in the correct order
ai2A1
All values at E, F and G correct and the working values in the correct order
ai3A1ft
All values in J and H correct on the follow through and the working values in the correct
order. To follow through J check that the working values at J follow from the candidate’s
final values for the nodes that are directly attached to J (which are F and G). For example,
if correct then the order of labelling of nodes F and G are 6 and 7 respectively so the
working values at J should come from F and G in that order. The first working value at J
should be their 50 (the Final value at F) + 17 (the weight of the arc FJ), the second
working value at J should be their 48 (the Final value at G) + G (the weight of the arc
GJ). Repeat the process for H (which will have working values from E, F and J with the
order of these nodes determined by the candidate’s order of labelling at E, F and J)
ai4A1
CAO
aiiA1ft
Follow through their final value at H only – if answer is 53 but the final value at H is not
53 then A0 (condone lack of minutes)
bM1
Either calculates the revised time of 57 minutes
Or compares the route in stages e.g. ACBEF against ACDF difference 2 and FGJH
against FJH difference 2. If their final value at H is not 53 follow through their final value
at F and shortest from F to H for these calculations
bA1ft
4 (minutes) (may be seen as 2 + 2 = 4) or follow through 57 - their fastest to H (which
may be in sections AF + FH)
Question
5 (a)
Scheme
Maximise
Marks
B1
(1)
M1
A1
(b)
(2)
M1
(c)
A1
B1
(3)
M1
A1
(d)
(2)
M1
(e)
A1
A1
Optimal point (60, 20)
60 red (rose bushes), 20 yellow (rose bushes)
A1
(4)
(12 marks)
Notes
aB1
CAO – must have maximise (accept max but not maximum) and
bM1
Forms inequality using the costs and attempts to simplify. If a correct equation
is formed and then changed to an inequality this is M1 A0
bA1
CSO *
cM1
Attempts to form inequality with either 0.4 or 40/100 (o.e. fraction) combined
with (x + y + z). Accept any inequality or equals for this mark
cA1
CAO – fully simplified with integer coefficients
cB1
CAO
dM1
Substitutes z = 30 into their
and attempts to simplify (Allow
recovery if their inequality is not fully simplified e.g.
)
dA1
CSO *
eM1
Draws at least two of the three lines with at least one correct (Condone no
consideration of
)
e1A1
Any two lines correct
passes through (60, 20) and (76, 0)
passes through (20, 0) and (40, 30)
(must be within ½ small square from these points)
e2A1
All three lines correct
e3A1
CSO – must have drawn the correct region (we do not require shading or for
the feasible region to be marked with R, but if this is done, the region selected
must be correct)
The answer must be in context so x = 60, y = 20 is A0 Accept 60 red and 20
yellow with no mention of rose bushes. We do not need to see any mention of
white roses here.
Question
6 (a)
Scheme
Considers pairings of nodes F, J, K and M
FJ + KM = 32+14 = 46
FK + JM = 15+26 = 41
FM + JK = 13+17 = 30
Repeat FG GM JL LK
Total length = 338 + 30 = 368 (km)
Special Case Max M1 A1 A0 A0 A0
Considers pairings of A, F, K and M
AF + KM = 26 + 14 = 40
AK + FM = 41 + 13 = 54
AM + FK = 39 + 15 = 54
Marks
M1
A1
A1
A1
A1ft
(5)
(b)
Now only repeat needed is KM, length 14
e.g. New length 338 + 18 + 14 = 370 (km)
(Increases length by) 2 (km)
M1
A1
(2)
(7 marks)
Notes
a1M1
The correct three pairings of the correct four nodes F, J, K and M with one row
correct (including total)
a1A1
Two rows correct including pairings and totals
a2A1
All three rows correct including pairings and totals
a3A1
CAO for the repeated arcs
a4A1ft
M1
A1
A0
A0
A0
b1M1
b1A1
338 + their smallest from a choice of three totals
Special Case – considers A, F, K, M
Three pairings of the four nodes with one row correct (including total)
All three rows correct including pairings and totals
No further marks available
Considers KM (may be implied by a correct calculation) as only pair of odd
nodes and calculates new length 338 + 18 +14 or calculates 18 + 14 as new
additional length
CAO – 2 (km) (must not come from any incorrect working)
Question
7.
(a)
Scheme
Marks
Activity
IPA
Activity
IPA
A
-
H
BC
(DEFGH)
B
-
I
DE
B1
B1
(IJK)
C
-
J
F
B1
D
AB
K
F
(LMN)
E
B
L
FGH
F
B
M
IJ
G
B
N
KL
(3)
(b)
M1
A1
M1
A1
(4)
(c)
Lower bound = (8+12+14+6+4+8+8+5+7+2+6+6+6+4)/31 = 96/31 = 3.1
Therefore 4 workers required
M1
A1
(2)
M1
(d)
A1
A1
A1
(4)
(e) At
activities D, C, F and G must be happening and at
activities D,
F, G and H must be happening. Also activity E must be happening at either
or
so a total of five workers
M1
A1
A1
(3)
(16 marks)
Notes
a1B1
a2B1
a3B1
Activities D, E, F, G and H correct
Activities I, J and K correct
Activities L, M and N correct
b1M1 All top boxes complete, values generally increasing in the direction of the arrows (‘left to
right’), condone one rogue value which is a number in a top box greater than the
subsequent value
b1A1
CAO (top boxes)
b2M1 All bottom boxes complete, values generally decreasing in the opposite direction of the
arrows (‘right to left’), condone one rogue value which is a number in a bottom box
greater than the previous value. Condone missing 0 and/or their 31 (at the end event) for
the M mark only
b2A1
CAO (bottom boxes)
c1M1 Calculates 96 (+/-14)/”31” – a calculation using the sum of the activities (accept a total in
the range 82 – 110) divided by their finish time or sight of awrt 3.1
c1A1
4 workers but must follow from a correct calculation (awrt 3.1) with no incorrect working
seen (note an answer of 4 with no working is M0)
d1M1 Cascade Chart not a schedule. At least 9 activities including at least 5 floats
d1A1 Critical activities (BDIM) and at least 3 non-critical activities correct
d2A1 At least 7 non-critical activities correct
d3A1 CAO All 14 activities present (just once). No errors.
e1M1 A statement mentioning one of the following
•
•
•
4 workers, 4 of D C E F G stated and time 13 – 14
4 workers, 4 of D E F G H stated and time 16 – 17
5 workers, either D C E F G or D E F G H stated and any time interval
e1A1
A correct statement of 5 workers with details of both the time and activities for one of the
intervals. Candidates must give a time within one of the correct intervals. Either 13 < t <
14, e.g. 13.5 (or ‘on/during day 14’) and state the correct activities D, C, E, F and G or
16 < t < 17 (or e.g. 16.5 or ‘on/during day 17’) and the correct activities D, E, F, G and H.
Please note an inequality for the time interval implying a time of 13, 14, 16 or 17 is
incorrect. Answers given as an interval of time are acceptable provided the time interval
stated is correct for all its possible values (e.g. time 13 – 14 or ‘between 13 and 14’ is A0)
e2A1
A fully correct statement mentioning both intervals and both correct groups of activities
and stating 5 workers
Question
Scheme
Marks
8.
B1
(a)
B1
(2)
M1
(b)
A1
M1
A1
(4)
(c)
Considers the gradient of
value for k
Considers the gradient of
value for k
e.g.
and attempts to find a limiting
and attempts to find a limiting
M1
M1
A1
A1
Alternative 1
Compares value of objective function at A and E
Compares value of objective function at C and D
M1
M1
A1
A1
giving
Alternative 2
Rearranges 3x + 2y = 48 to compare with x + ky
Rearranges 2x + y = 70 to compare with x + ky
M1
M1
A1
A1
(4)
For reference the coordinates of all points of intersection
A
3x + 2y = 48 and y = 2x + 5
B
y = 2x + 5 and x + 5y = 150
C
x + 5y = 150 and 2x + y = 70
D
2x + y = 70 and 5y = 3x - 15
E
5y = 3x – 15 and 3x + 2y = 48
(10 marks)
Notes
a1B1
a2B1
Any two inequalities correct (accept equivalent rearrangements)
CAO – all four correct (ignore any mention of 3x + 2y ≥ 48
(SC B1 B0 for all four strict inequalities)
b1M1
Attempts to solve both correct pairs of simultaneous equations (candidates
may use their calculator to solve these, so the correct values for both points
implies both marks) Ignore any additional work to find other points of
intersection
b1A1
CAO – both pairs of coordinates (accept awrt (12.9, 4.7) and (22.2, 25.6))
Ignore additional points of intersection
b2M1
Forms a pair of simultaneous equations using their minimum and maximum
points and solves to obtain a and b (may be unsimplified). If they have
calculated additional points of intersection, then they must use their answer
for the correct two points here
b2A1
CAO – must be exact values (either stating a and b or as function P = )
c1M1
Considers
and attempts to find a value for k by comparing gradients
or compares the value of the objective function at A and E (accept the use of
m for -1/k to compare gradients even if not clearly defined)
c2M1
Considers
and attempts to find a value for k by comparing gradients or
compares the value of the objective function at C and D
c1A1
Either
or
(allow use of
) (If gradients are compared
please check inequalities carefully to ensure that any working shown is fully
correct) (this mark can be awarded following either of the M marks so M0
M1 A1 A0 or M1 M0 A1 A0 are possible)
c2A1
Both values correct and correct interval stated (allow use of ≤ ) (both M
marks must be awarded and must not come from incorrect working)
Pearson Education Limited. Registered company number 872828
with its registered office at 80 Strand, London, WC2R 0RL, United Kingdom