Mathematics · January 2025 · Mark scheme · D1
Edexcel IAL Mathematics mark scheme for D1, January 2025, file IAL_MATHS_2025_Jan_D1_MS.pdf.
Text of this paper
Mark Scheme (Results)
January 2025
Pearson Edexcel International Advanced Level
in Decision Mathematics D1(WDM11) Paper 01
Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding body. We
provide a wide range of qualifications including academic, vocational, occupational and specific
programmes for employers. For further information visit our qualifications websites at
www.edexcel.com or www.btec.co.uk. Alternatively, you can get in touch with us using the
details on our contact us page at www.edexcel.com/contactus.
Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help everyone
progress in their lives through education. We believe in every kind of learning, for all kinds of
people, wherever they are in the world. We’ve been involved in education for over 150 years,
and by working across 70 countries, in 100 languages, we have built an international reputation
for our commitment to high standards and raising achievement through innovation in
education. Find out more about how we can help you and your students at:
www.pearson.com/uk
January 2025
Question Paper Log Number P76012A
Publications Code WDM11_01_2501_MS
All the material in this publication is copyright
© Pearson Education Ltd 2025
General Marking Guidance
•
All
candidates
must
receive
the
same
treatment. Examiners must mark the first candidate in
exactly the same way as they mark the last.
•
Mark schemes should be applied positively. Candidates
must be rewarded for what they have shown they can do
rather than penalised for omissions.
•
Examiners should mark according to the mark scheme
not according to their perception of where the grade
boundaries may lie.
•
There is no ceiling on achievement. All marks on the mark
scheme should be used appropriately.
•
All the marks on the mark scheme are designed to be
awarded. Examiners should always award full marks if
deserved,
i.e.
if
the
answer
matches
the
mark
scheme. Examiners should also be prepared to award
zero marks if the candidate’s response is not worthy of
credit according to the mark scheme.
•
Where some judgement is required, mark schemes will
provide the principles by which marks will be awarded
and exemplification may be limited.
•
When examiners are in doubt regarding the application
of the mark scheme to a candidate’s response, the team
leader must be consulted.
•
Crossed out work should be marked UNLESS the
candidate has replaced it with an alternative response.
EDEXCEL GCE MATHEMATICS
General Instructions for Marking
1. The total number of marks for the paper is 75.
2. The Edexcel Mathematics mark schemes use the following types of
marks:
•
•
•
•
M marks: method marks are awarded for ‘knowing a method and
attempting to apply it’, unless otherwise indicated.
A marks: Accuracy marks can only be awarded if the relevant method
(M) marks have been earned.
B marks are unconditional accuracy marks (independent of M marks)
Marks should not be subdivided.
3. Abbreviations
These are some of the traditional marking abbreviations that will appear in
the mark schemes.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
bod – benefit of doubt
ft – follow through
the symbol
will be used for correct ft
cao – correct answer only
cso - correct solution only. There must be no errors in this part of
the question to obtain this mark
isw – ignore subsequent working
awrt – answers which round to
SC: special case
oe – or equivalent (and appropriate)
dep – dependent
indep – independent
dp decimal places
sf significant figures
The answer is printed on the paper
The second mark is dependent on gaining the first mark
4. All A marks are ‘correct answer only’ (cao.), unless shown, for
example, as A1 ft to indicate that previous wrong working is to be
followed through. After a misread however, the subsequent A marks
affected are treated as A ft, but manifestly absurd answers should
never be awarded A marks.
5. For misreading which does not alter the character of a question or
materially simplify it, deduct two from any A or B marks gained, in that
part of the question affected.
6. If a candidate makes more than one attempt at any question:
• If all but one attempt is crossed out, mark the attempt which is
NOT crossed out.
• If either all attempts are crossed out or none are crossed out,
mark all the attempts and score the highest single attempt.
7. Ignore wrong working or incorrect statements following a correct
answer.
Question
Number
1.(a)
Scheme
Marks
Bin 1: 26 19 10
Bin 2: 31 14 3 5
Bin 3: 30 18
Bin 4: 33
Bin 5: 28
M1 A1 A1(3)
middle right
(b)
26
31
33
33
33
33
19
33
31
31
31
31
middle left
26 19
31 33
33 31
33 31
33 31
(c)
31
30
30
30
30
30
10
26
26
26
28
28
14
19
19
28
26
26
30
10
28
19
19
19
33
14
18
18
18
18
18
18
10
10
14
14
3
3
14
14
10
10
28
28
3
5
5
5
5
5
5
3
3
3
Pivot 30
33, 18
(31) 19, 3
28, 14
(26) 5
(10)
31
30
30
30
30
10
26
26
26
28
14
19
19
28
26
30
10
18
19
19
33
14
28
18
18
18
18
14
14
14
3
3
10
10
10
28
28
3
5
5
5
5
5
3
3
Pivot 30
31, 14
(33), 19, 3
26, (18) 10
(28), (5)
Bin 1: 33 19 3
Bin 2: 31 18 5
Bin 3: 30 14 10
Bin 4: 28 26
Notes for Question 1
The correct first five items placed correctly (the bold values) and at least eight
a1M1
values placed in bins (allow repeated values). Condone cumulative totals or
calculation of the remaining space for M1 only
First eight values placed correctly (the bold and underlined values) with all eleven
a1A1
correct values only placed in bins. This mark cannot be awarded if any repeated
values or incorrect values are seen (even if the first eight values have been placed
correctly)
a2A1
CSO – no additional or repeated values (dependent on both previous marks)
M1
A1
A1ft
A1
M1 A1(2)
9 marks
(4)
Quick sort using all 11 numbers (condone one item error or omission), pivot, p,
chosen (must be choosing middle item – choosing first/last item as the pivot is
b1M1
M0). After the first pass the list must read (values greater than the pivot), pivot,
(values less than the pivot). If only choosing one pivot per iteration then M1.
Bubble sort is M0.
b1A1
First and second passes correct but not choice of pivots for 3rd pass
Third and fourth passes correct following through from their second pass and
choice of pivots for the third pass. The pivots for the third and fourth pass must
b2A1ft
be consistent with their second pass (MR or ML) If they choose one MR and one
ML pivot for the second pass, they can score this mark if they then consistently
choose either MR or ML pivots for the rest of their sort.
CSO (correct solution only – all previous marks in this part must have been
b3A1
awarded) including a fifth pass for middle right and choosing either 5 (MR) or 10
(ML) as pivots
Special Case for (b) If the candidate sorts into ascending order they can score
M1 as per the main scheme (but with the values either side of the pivot
reversed), A1 for a fully correct sort then A0 A0 even if the list is reversed at
the end (so 2 marks max.). See below
Their seven largest items placed correctly and at least nine values placed in bins
(if correct this will be the bold items but must check their packing if any of their
c1M1
seven largest values are incorrect – note that the maximum weight of a bin is 55).
Condone cumulative totals or calculation of remaining space for M1 only. Firstfit increasing scores no marks in this part. If no sort seen in (b) then mark (c)
assuming the correct ordered list is being used
c1A1
CAO
Ascending Sort
Middle right
26 19 31
26 19 10
10 14
3
3
10 14
3
10
5
3
5
10
10
14
5
5
14
14
14
18
18
18
18
18
30
3
26
19
19
19
33
28
19
26
26
26
18
5
28
28
28
28
3
30
30
30
30
30
28
31
31
31
31
31
5
33
33
33
33
33
Pivot 30
18, 33
3, 19, (31)
14, 28
5 (26)
(10)
Middle left
26
26
10
3
3
19
19
3
10
5
31
10
5
5
10
10
14
14
14
14
14
18
26
18
18
30
3
19
19
19
33
28
18
26
26
18
5
28
28
28
3
30
30
30
30
28
31
31
31
31
5
33
33
33
33
Pivot 30
14, 31
3, 19, (31)
10, (18) 26
(28), (5)
Question
Number
Scheme
Marks
M1
A1 (ADBCE)
A1 (HF)
2.(a) (i)
A1ft (GJ)
(a) (ii)
(b)
Shortest path from A to J is ABFGJ
A1
Shortest length is 357 (metres)
A1ft
Consider all pairings of A, C, E and J
M1
(6)
AC + EJ 147 + 210 = 357
AE + CJ 161 + 364 = 525
AJ + CE 357 + 168 = 525
Length of route = 1 960 + 357 = 2 317 (metres)
(c)(i)
(c)(ii)
Consider arcs between odd nodes not using A – shortest CE so repeat.
Finish at J
Difference in length their “357” – 168 = 189 metres or their “2317” – 2128 =
189 (metres)
A1ft
A1ft
A1 ft
(4)
M1
A1
A1ft
13 Marks
(3)
Notes for Question 2
In (a) it is important that all values at each node are checked very carefully – the order of
the working values must be correct for the corresponding A mark to be awarded e.g. at C
the working values must be 182 154 147 in that order (so 182 147 154 is incorrect)
It is also important that the order of labelling is checked carefully. The order of labelling
must be a strictly increasing sequence – so 1, 2, 3, 3, 4, … will be penalised once (see notes
below) but 1, 2, 3, 5, 6, … is fine. Errors in the final values and working values are penalised
before errors in the order of labelling
ai1M1
A larger value replaced by a smaller value at least twice in the working values at either C, E, G,
H, J
ai1A1
All values at A, D, B, C and E correct and the working values in the correct order
ai2A1
All values at H and F correct and the working values in the correct order
All values in G and J correct on the follow through and the working values in the correct order.
To follow through G check that the working values at G follow from the candidate’s final values
for the nodes that are directly attached to G (which are E, F and H (and J)). For example, if correct
then the order of labelling of nodes E, F and H are 5, 7 and 6 respectively so the working values
ai3A1ft
at H should come from E, H and F in that order. The first working value at G should be their 161
(the Final value at E) + 133 (the weight of the arc EG), the second working value at G should be
their 203 (the Final value at H) + 84 (the weight of the arc HG) and the third working value should
be their 217 (the Final value at F) + 56 (the weight of the arc FG) . Repeat the process for J (which
will have working values from F, G and H with the order of these nodes determined by the
candidate’s order of labelling at F, G and H)
ai4A1
aii1A1ft
b1M1
b1A1ft
b2A1ft
b3A1ft
ci1M1
CAO (accept route written in arcs)
Follow through their final value at J only – if answer is 357 but the final value at J is not 357 then
A0
The correct three pairings of the correct four nodes (A, C, E and J)
Two rows correct including pairings and totals. Ft for AC, AE and AJ only using their values
from (a) but allow recovery if correct totals seen here
All three rows correct including pairings and totals. Ft for AC, AE and AJ only using their values
from (a) but allow recovery if correct totals seen here
1960 + their smallest from a choice of three totals
Considers arcs between odd nodes not including A (e.g. listing possible arcs to be repeated CE
CJ and EJ) (A statement that CE is the shortest implies this mark)
ci1A1
cii1A1ft
Clear indication that CE is shortest (e.g. a statement or tick or starring of CE, not just using 168)
(we do not need to see all values explicitly listed here) and therefore finish at J
Dependent on M mark in (b) 189 or their “357” – 168
Question
Number
3.(a)
Scheme
a
1 980
462
132
b
462
132
66
c
914 760
(914 760)
(914 760)
d
30/7
7/2
2
Marks
e
4
3
2
f
1848
396
132
g
132
66
0
h
M1
13 860
A1
A1ft
(b)
Output 13 860
Calculates the lowest common multiple of two numbers o.e. description
A1
B1
(4)
(1)
5 marks
Notes for Question 3
Note values may be written on individual rows. Please award the marks for the
complete rows shown above. The values in cell c do not need to be repeated in
each row, but we will condone this.
a1M1
a1A1
a2A1ft
a3A1
First row cells a to g completed – something in each cell
First and second row correct. Accept decimal equivalent awrt 4.29 and 3.5 (h must
have no numerical value in these rows)
Third row correct – ft their first and second rows
13 860 in Output row CSO
LCM CAO (accept e.g. smallest common multiple, minimum common multiple,
b1B1
minimum common product, smallest number which can be divided by both a and b
o.e.) (do not accept times instead of multiple or product)
Question
Number
Scheme
Marks
M1
A1
A1
4.(a)
A1
A1
(5)
e.g.
(b)
Activities A, B, C, F and H are critical
Notes for Question 4
Condone lack of, or incorrect, numbered events throughout. ‘Dealt with correctly’
means that the activity starts from the correct event but need not necessarily finish
at the correct event, e.g. ‘H dealt with correctly’ requires the correct precedences
for this activity, i.e. D and E labelled correctly and leading into the same node, a
dummy from the end of F into the node and H starting from that node but do not
consider the end event. Activity on node is M0
If an arc is not labelled, for example, if the arc for activity E is not labelled (but
the arc is present) then this will lose the first A mark and the final (CSO) A mark
– they can still earn the second A mark on the bod. If two or more arcs are not
labelled then mark according to the scheme. Assume that a solid line is an activity
which has not been labelled rather than a dummy (even if in the correct place for
where a dummy should be). Ignore incorrect or lack of arrows on the activities
for the first four marks only
a1M1
a1A1
a2A1
a3A1
a4A1
Nine activities (labelled on arc), one start and at least two dummies placed
Activities A, B, C, 1st two dummies (including correct arrow), D, E and F dealt
with correctly
Activities G, H and I dealt with correctly and dummy from the end of F to end of
D/E (including correct arrow)
Activities J and K dealt with correctly and dummy from the end of F to end of G
(including correct arrow)
CSO – all arrows correctly placed for each activity with one finish and exactly
five dummies (so uniqueness dummy for J/K required)
B1
(1)
6 marks
Please check all arcs carefully for arrows – if there are no arrows on any
dummies then M1 only.
Note that additional (but unnecessary) ‘correct’ dummies that still maintain
precedence for the network should only be penalised with the final A mark if
earned. Note that this answer is not unique (e.g. J and K are interchangeable,
the arrow on the dummy between K and J can go in either direction or this
dummy could be at the start of J and K)
b1B1
CAO (A, B, C, F and H and no others, but condone mention of D and/or I)
Question
Number
5. (a)
Scheme
Marks
B1
B1
Maximise
(2)
* (result given in question)
(b)
M1
A1
(2)
M1
A1
A1
(c)
(3)
7 marks
a1B1
Notes for Question 5
Maximise stated (accept max but not maximum)
Objective function correct (we do not need to see P = ) accept 1.5x + 2y + 1.8z or if
a2B1
they work in pence so 150x + 200y + 180z accept the use of correct fractions
Do not ISW if they multiply by 10 and P = 15x + 20y + 18z is seen – this is B0
bM1
bA1
Attempts inequality for total quantity of ice cream:
Sum of the correct 3 fractions
CSO * (result given in question)
Attempts at least two non-trivial constraints (any inequality symbol or equals) (must
cM1
be using fractions or decimals but not just e.g. 40%) Each inequality must have the
correct ingredients (e.g. x, 40/100, and x + y + z) correct simplified inequalities can
imply this. Accept
c1A1
c2A1
for this mark
Two non-trivial constraints correct – simplified with integer coefficients (so accept
multiples)
All non-trivial constraints correct – simplified with integer coefficients (so accept
multiples) (note we do not need to see
)
Question
Number
6.(a)
(b)
(c)
(d)
Scheme
Classical problem must visit every vertex exactly once and returns to start but
practical problem must visit every vertex at least once and returns to start
Either AB, BC, CK, HK, JK, CD, GJ, FG, EG
or AB, BC, CK, HK, JK, GJ, FG, EG, CD
(miles)
ABCKHJGFEDA 140 (miles)
Marks
B1
B1
M1
A1
A1
(3)
B1
M1
A1
A1
(e)
Route from A as it is the smaller value or 140 because 140 < 145
B1ft
(f)
Lower Bound = 89 – 16 + (16 + 19) = 108 (miles)
M1
A1
(g)
(2)
(1)
(3)
(1)
(2)
B1ft
(1)
13 marks
a1B1
a2B1
Notes for Question 6
General idea that Classical visits vertices once but practical is at least once. Any
mention of travelling along every arc is B0
Need to see all the words in bold (accept equivalent technical language e.g. node
instead of vertex) – must include return to start
Prim’s – first three arcs correctly chosen in order (AB, BC, CK, …) or first four
nodes {A, B, C, K, … } correctly chosen in order. If any explicit rejections seen at
b1M1
some point then M1 (max) only. Order of nodes may be seen at the top of a
matrix/table {1, 2, 3, - , - , -, -, -, -, 4 }. Starting at any other node can score M1
only for first three arcs chosen correctly
First six arcs correctly chosen in order {AB, BC, CK, HK, JK, CD, …} or {AB,
BC, CK, HK, JK, GJ, …}or all 10 nodes {A, B, C, K, H, J, D, G, F, E} or {A, B,
b1A1
C, K, H, J, G, F, E, D}correctly chosen in order. Order of nodes may be seen at the
top of a matrix so for the first two marks accept {1, 2, 3, 7, 10, 9, 8, 5, 6, 4} or
{1, 2, 3, 10, 9, 8, 7, 5, 6, 4} (no missing numbers).
CSO – all arcs correctly stated and chosen in the correct order (with no additional
b2A1
arcs). They must be considering arcs for this final mark (do not accept a list of
nodes or numbers across the top of the matrix unless the correct list of arcs (in the
correct order) is also seen)
c1B1
CAO
NN route attempted – first seven nodes correct ABCKHJG (accept arcs for this
d1M1
mark AB, BC, CK, KH, HJ, JG or complete numbering on table
{1, 2, 3, 10, 9, 8, 7, 5, 6, 4} which is clearly a separate calculation from part (b))
d1A1
d2A1
e1B1ft
CAO – route correct including return to A (accept arcs AB, BC, CK, KH, HJ, JG,
GF, FE, ED, DA) (condone if arcs stated alphabetically instead of in route order)
CAO – distance 140
States A or 140 and reason correct (smaller value) but ft their answer to (d)
dependent on M1 in (d)
Their “89” – 16 + two shortest from A (a new calculation to find the RMST may be
f1M1
seen e.g. new table with A deleted and a new MST calculation, with the correct 8
arcs circled BC CD CK EG FG GJ JK KH plus two shortest from A)
f1A1
CAO – an answer of 108 implies both of these marks
FT their answers to (e) and (f) but dep on B1 in (e) and M1 in (f) and
g1B1ft
their (f) < their (e)
(accept
or interval notation [108, 140] or (108, 140] )
Question
Number
7.(a)
Scheme
Dummy is required to uniquely define Activity Q and Activity R
Marks
B1
(1)
M1
A1
(b)
M1
(c)
AFILP
(d)
28 – 13 – 12 = 3 (days)
A1
(4)
B1
M1
A1
(1)
(2)
M1
A1
(e)
A1
A1
(f)
At time
activities D, E, F, G and H must be happening. Therefore five
workers required
M1
A1
14 marks
(4)
(2)
a1B1
Notes for Question 7
CAO – accept equivalent explanations (e.g. to allow two activities to start at the same
event and end at the same event – see examples)
All top boxes complete, values generally increasing in the direction of the arrows (‘left
b1M1
to right’), condone one rogue value which is a number in a top box greater than the
subsequent value
b1A1
CAO (top boxes)
All bottom boxes complete, values generally decreasing in the opposite direction of
b2M1
the arrows (‘right to left’), condone one rogue value which is a number in a bottom
box greater than the previous value. Condone missing 0 and/or their 41 (at the end
event) for the M mark only
b2A1
CAO (bottom boxes)
c1B1
CAO
d1M1
Their “Late End Time K” – “Early Start Time K” – 12
or a correct equivalent calculation e.g. 41 – 7 – 6 – 12 – 4 – 9 (= 3)
d1A1
CAO
e1M1
Cascade Chart not a schedule. At least 11 activities including at least 6 floats
e1A1
Critical activities (AFILP) correct and at least 3 non-critical activities correct
e2A1
At least 9 non-critical activities correct
e3A1
CAO All 17 activities present (just once). No errors.
Either a statement with the correct number of workers (5) and stating the correct
f1M1
activities (D, E, F, G and H) with any numerical time stated or the correct number of
workers (5) and a time in the interval
– mark the numerical value only
not their use of the words ‘day/time’ (or equivalent)
A completely correct statement with details of both time and activities. Candidates
must give a time within the correct interval of 12 < t < 13, e.g. 12.5 (or ‘on/during day
13’) or
and state the correct activities (D, E, F, G and H). (If using set
notation there must be a statement linking time to (12, 13) )
f1A1
Please note inequalities for the time interval implying a time of 12 is incorrect.
Answers given as an interval of time are acceptable provided the time interval stated
is correct for all its possible values (e.g. time 12 – 13 or ‘between 12 and 13’ is A0).
A completely correct statement with an additional incorrect statement scores A0 (so
do not ignore subsequent working)
Question
Number
Scheme
Marks
8. (a)
B1
B1
(b)
M1
A1
A1
(2)
dM1
A1
(c)
(3, 11)
B1
8 marks
(5)
(1)
a1B1
a2B1
Notes for Question 8
Any two inequalities correct – condone strict inequalities here (accept equivalent
forms)
All four inequalities correct (accept equivalent forms)
Attempts to solve either pair of simultaneous equations to find min and max
points (they may attempt to find all 4 vertices) Note they may use calculators
b1M1
to solve these equations, with no working shown. The correct two pairs of
coordinates implies M1 A1 A1 (These values may be seen on the diagram)
If the correct coordinates are not seen and no working is shown, this is M0
b1A1
b2A1
One pair correctly solved (accept decimal equivalents awrt (12.22, 15.11) and
(2.29, 10.86)
Both pairs correctly solved (accept decimal equivalents)
Forms a pair of simultaneous equations using P = ax + by and their minimum
b2dM1
(cM1 on
ePen)
and maximum values and solves to obtain a and b (dependent on the previous
b3A1
(cA1 on
ePen)
CAO – (P =) 2x + 3y (must follow from correct working) Note we do not need
c1B1
(dB1 on
ePen)
M mark) Condone use of alternative letters instead of a and b (but not x and
y)
P =, but if they write e.g. 2x + 3y = 0 this is A0
CAO (note the correct coordinates may be embedded in a calculation of the
minimum profit e.g. 2(3) + 3(11) = 39 (we will accept a value of 39 with no
obvious wrong working as evidence of the correct point) Accept 3, 11 here
Pearson Education Limited. Registered company number 872828
with its registered office at 80 Strand, London, WC2R 0RL, United Kingdom