Mathematics · January 2024 · Mark scheme · D1
Edexcel IAL Mathematics mark scheme for D1, January 2024, file IAL_MATHS_2024_Jan_D1_MS.pdf.
Text of this paper
Mark Scheme (Results)
January 2024
Pearson Edexcel International Advanced Level
in Decision Mathematics D1 (WDM11) Paper 01
Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding body. We
provide a wide range of qualifications including academic, vocational, occupational and specific
programmes for employers. For further information visit our qualifications websites at
www.edexcel.com or www.btec.co.uk. Alternatively, you can get in touch with us using the
details on our contact us page at www.edexcel.com/contactus.
Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help everyone
progress in their lives through education. We believe in every kind of learning, for all kinds of
people, wherever they are in the world. We’ve been involved in education for over 150 years,
and by working across 70 countries, in 100 languages, we have built an international reputation
for our commitment to high standards and raising achievement through innovation in
education. Find out more about how we can help you and your students at:
www.pearson.com/uk
January 2024
Question Paper Log Number P73481A
Publications Code WDM11_01_2401_MS
All the material in this publication is copyright
© Pearson Education Ltd 2024
General Marking Guidance
•
All candidates must receive the same treatment. Examiners must
mark the first candidate in exactly the same way as they mark the
last.
•
Mark schemes should be applied positively. Candidates must be
rewarded for what they have shown they can do rather than
penalised for omissions.
•
Examiners should mark according to the mark scheme not
according to their perception of where the grade boundaries may
lie.
•
There is no ceiling on achievement. All marks on the mark scheme
should be used appropriately.
•
All the marks on the mark scheme are designed to be awarded.
Examiners should always award full marks if deserved, i.e. if the
answer matches the mark scheme. Examiners should also be
prepared to award zero marks if the candidate’s response is not
worthy of credit according to the mark scheme.
•
Where some judgement is required, mark schemes will provide
the
principles
by
which
marks
will
be
awarded
and
exemplification may be limited.
•
When examiners are in doubt regarding the application of the
mark scheme to a candidate’s response, the team leader must be
consulted.
•
Crossed out work should be marked UNLESS the candidate has
replaced it with an alternative response.
EDEXCEL IAL MATHEMATICS
General Instructions for Marking
1. The total number of marks for the paper is 75.
2. The Edexcel Mathematics mark schemes use the following types of marks:
•
M marks: Method marks are awarded for ‘knowing a method and attempting to
apply it’, unless otherwise indicated.
•
A marks: Accuracy marks can only be awarded if the relevant method (M) marks
have been earned.
•
B marks are unconditional accuracy marks (independent of M marks)
Marks should not be subdivided.
3. Abbreviations
These are some of the traditional marking abbreviations that will appear in the mark
schemes and can be used if you are using the annotation facility on ePEN:
•
bod – benefit of doubt
•
ft – follow through
o
the symbol
will be used for correct ft
•
cao – correct answer only
•
cso – correct solution only. There must be no errors in this part of the question
to obtain this mark
•
isw – ignore subsequent working
•
awrt – answers which round to
•
SC – special case
•
oe – or equivalent (and appropriate)
•
d… or dep – dependent
•
indep – independent
•
dp – decimal places
•
sf – significant figures
•
– The answer is printed on the paper or ag- answer given
•
or d… – The second mark is dependent on gaining the first mark
4. All A marks are ‘correct answer only’ (cao), unless shown, for example, as A1 ft to
indicate that previous wrong working is to be followed through. After a misread
however, the subsequent A marks affected are treated as A ft, but manifestly absurd
answers should never be awarded A marks.
5. For misreading which does not alter the character of a question or materially simplify
it, deduct two from any A or B marks gained, in that part of the question affected. If
you are using the annotation facility on ePEN, indicate this action by ‘MR’ in the body
of the script.
6. If a candidate makes more than one attempt at any question:
a) If all but one attempt is crossed out, mark the attempt which is NOT crossed out.
b) If either all attempts are crossed out or none are crossed out, mark all the
attempts and score the highest single attempt.
7. Ignore wrong working or incorrect statements following a correct answer.
Question
Number
Scheme
Marks
M1
A1
1. (a)
M1
A1
(4)
(b)
Activity D has a total float of 12 – 4 – 5 = 3 (hours)
(c)
Lower bound =
workers
B1ft
(1)
M1 A1
(2)
M1
A1
(d)
A1
A1
(4)
(e)
a1M1
a1A1
a2M1
a2A1
b1B1ft
Minimum is 4 workers e.g. activities F, H, I and L together with
12 < time < 13
Notes for Question 1
All top boxes complete, values generally increasing in the direction of the
arrows (‘left to right’), condone one rogue
CAO (top boxes)
All bottom boxes complete, values generally decreasing in the opposite
direction of the arrows (‘right to left’), condone one rogue. Condone missing 0
and/or their 24 (at the end event) for the M mark only
CAO (bottom boxes)
Correct calculation for their event times for activity D (all three figures must be
seen)
dM1
A1
(2)
13 marks
Question
Number
Scheme
Marks
Attempt to find lower bound: (a value in the interval [55 – 79] / their finish
c1M1
time) or (sum of the activities (12 values) [condone one missing value] / their
finish time) or (as a minimum) an awrt 2.8
CSO – requires both a correct calculation or awrt 2.8 seen and 3. An answer of
c1A1
3 with no working scores no marks
At least eight different activities labelled including at least five floats. A
d1M1
scheduling diagram (so a diagram in which no floats are evident) scores M0
The critical activities dealt with correctly and appearing just once (C, F, G and
d1A1
J) and three non-critical activities dealt with correctly (both duration and total
float correct)
Any five non-critical activities correct (this mark is not dependent on the
d2A1
previous A mark)
CSO – completely correct Gantt chart (exactly twelve activities appearing just
d3A1
once)
Dependent on M mark in (d). Either a statement with the correct number of
workers (4) and stating the correct activities (F, H, I and L) with any numerical
e1depM1 time stated or the correct number of workers (4) and a time in the interval
– mark the numerical value only not their use of the words
‘day/time’ (or equivalent)
A completely correct statement with details of both time and activities.
Candidates must give a time within the correct interval of 12 < t < 13, e.g. 12.5
(or ‘on/during hour 13’) and state the correct activities (F, H, I and L). Project
is measured in hours, so a time of (e.g.) 12:30 is acceptable.
(Condone use of ‘days’ instead of ‘hours’)
e1A1
Please note the strict inequalities for the time interval (e.g. implying a time of
12 is incorrect). Answers given as an interval of time are acceptable provided
the time interval stated is correct for all its possible values (e.g. time 12 – 13 or
‘between 12 and 13’ is A0). A completely correct statement with an additional
incorrect statement scores A0 (so do not ignore subsequent working)
For (d) the following may be useful in checking their cascade chart provided the float is shown after the
corresponding activity:
Activity
A
B
C
D
E
Duration +
Float
0 to 4
F: 4 to 7
0 to 3
F: 3 to 13
0 to 7
Critical
4 to 9
F: 9 to 12
4 to 6
F: 6 to 18
Activity
F
G
H
I
J
Duration +
Float
7 to 13
Critical
13 to 18
Critical
7 to 13
F: 13 to 18
7 to 13
F: 13 to 18
18 to 24
Critical
Activity
K
L
Duration +
Float
13 to 18
F: 18 to 24
9 to 21
F: 21 to 24
2.(a)
Prim: AE, AC, CD; BD, AF; CH, BG
(b)
Weight of MST is 205 (minutes)
(c)
J–G–B–D–C–A–E–F–H–J
28 + 32 + 28 + 27 + 29 + 28 + 36 + 39 + 42 = 289 (minutes)
(d)
The best upper bound is the one starting at J as 289 is less than 291
(e)
The two smallest arcs incident to J are 28 and the min(x, 33) but 28 + 33 + 205
264
205 + 28 + x = 264
x = 31
a1M1:
a1A1:
a2A1:
b1B1:
c1M1:
c1A1:
d1B1:
e1B1:
e1M1:
e1A1:
Notes for Question 2
Prim’s – first three arcs correctly chosen in order (AE, AC, CD, …) or first four
nodes {A, E, C, D, …} correctly chosen in order. If any explicit rejections seen
at some point then M1 (max) only. Order of nodes may be seen at the top of a
matrix/table {1, -, 3, 4 , 2 , -, -, -}. Starting at any other node can score M1 only
for first three arcs chosen correctly
First five arcs correctly chosen in order (AE, AC, CD, BD, AF, …) or all eight
nodes {A, E, C, D, B, F, H, G} correctly chosen in order. Order of nodes may be
seen at the top of a matrix so for the first two marks accept {1, 5, 3, 4, 2, 6, 8, 7}
(no missing numbers)
CSO – all arcs correctly stated and chosen in the correct order (with no
additional arcs). They must be considering arcs for this final mark (do not accept
a list of nodes or numbers across the top of the matrix unless the correct list of
arcs (in the correct order) is also seen)
CAO for weight of MST (205) – no units required
Nearest neighbour starting at J with first five nodes correct (J – G – B – D – C –
) Accept arcs JG GB BD DC
Correct nearest neighbour route (must return to J) (may be listed as arcs JG GB
BD DC CA AE EF FH HJ) and correct length (289)
Accept any wording indicating that the answer from (c) is smaller than 291 and
therefore the better upper bound
An indication that 289 is the minimum (of 291 and 289) – this mark is
dependent on the correct value in (c) so accept an answer of the form ‘the one
starting at J (or the route with weight 289) as it is the least’
Correct justification that the two smallest arcs incident to J are 28 and x - may
calculate that the two smallest arcs must be 28 and 31 and then state that as no
other arc has length 31, this must be the value of x
Forming the equation: weight of MST from (b) + 28 + x = 264
CAO for x
M1 A1
A1
(3)
B1
(1)
M1
A1
(2)
B1
(1)
B1
M1
A1
(3)
10 marks
M1
A1
(ABCDE)
3.(a)(i)
A1 (FG)
A1ft (HJ)
Shortest path from A to J is ABCDFGHJ
(a)(ii)
(b)
Length of shortest path from A to J is 83 (km)
B(CD)F + HJ = 30 + 5 = 35*
B(CDFG)H + F(GH)J = 61 + 36 = 97
B(CDFGH)J + F(G)H = 66 + 31 = 97
Repeat arcs: BC, CD, DF and HJ
Route length is 458 + 35 = 493 (km)
(c)
The shortest path between any of the pairs of the four odd nodes (A, B, F and H)
is AB (17)
So start at F and finish at H (or vice-versa)
Length of route is 458 + 17 = 475 (km)
(b)
Special Case for Part B – using A B F H – Mark as Misread
AB + F(G)H = 17 + 31 = 48*
A(BCD)F + B(CDFG)H = 47 + 61 = 108
A(BCDFG)H + B(CD)F = 78 + 30 = 108
Repeat arcs: AB, FG and GH
Route length is 458 + 48 = 506 (km)
Remove final two A marks earned in this section so max 3/5
A1
A1ft
(6)
M1
A1
A1
A1
A1ft
(5)
M1
A1
B1
(3)
14 marks
M1
A1
A1
A1
A1ft
(5)
a1M1
a1A1
a2A1
a3A1ft
a4A1
a5A1ft
b1M1
b1A1
b2A1
b3A1
b4A1ft
c1M1
c1A1
c1B1
Notes for Question 3
In (a) it is important that all values at each node are checked very carefully
– the order of the working values must be correct for the corresponding A
mark to be awarded e.g. at D the working values must be 39 37 35 in that
order (so 39 35 37 is incorrect)
It is also important that the order of labelling is checked carefully. The
order of labelling must be a strictly increasing sequence – so 1, 2, 3, 3, 4, …
will be penalised once (see notes below) but 1, 2, 3, 5, 6, … is fine. Errors in
the final values and working values are penalised before errors in the order
of labelling
A larger value replaced by a smaller value in the working values of at least two
of the nodes C, D, F, G, H, J
All values at A, B, C, D and E correct and the working values in the correct
order
All values at F and G correct and the working values in the correct order
All values in H and J correct on the follow through and the working values in
the correct order. To follow through H check that the working values at H
follow from the candidate’s final values for the nodes that are directly attached
to H (which are E and G). For example, if correct then the order of labelling of
nodes E and G are 5 and 7 respectively so the working values at H should come
from E and G in that order. The first working value at H should be their 45 (the
Final value at E) + 47 (the weight of the arc EH), the second working value at H
should be their 67 (the Final value at G) + 11 (the weight of the arc GH). Repeat
the process for J (which will have working values from D, F, G and H with the
order of these nodes determined by the candidate’s order of labelling at D, F, G
and H)
CAO (ABCDFGHJ)
Follow through their final value at J only – if answer is 83 but this is not the
Final Value at J then A0
Three distinct pairings of the nodes B, F, H and J with one row correct
(including total)
Any two rows correct including pairings and totals
All three rows correct including pairings and totals
CAO - correct arcs clearly stated and not just in their working as BC, CD, DF
and HJ – must be these arcs. Do not accept BF or B(CD)F or BF via C and D
Correct route length (493) or follow through their least repeat + 458
Indicates the need to find the shortest path between any pair of the correct four
odd nodes (A, B, F, H)
CAO (F, H)
CAO (475)
Special Case for Part B – using A B F H – Mark as Misread
b1M1
b1A1
b2A1
b3A1
b4A1ft
Three distinct pairings of the nodes A, B, F and H with one row correct
(including total)
Any two rows correct including pairings and totals
All three rows correct including pairings and totals
CAO - correct arcs clearly stated and not just in their working as AB, FG and
GH – must be these arcs. Do not accept FH or F(G)H or FH via G
Correct route length (506) or follow through their least repeat + 458
Remove final two A marks earned in this section so max 3/5
M1
A1
A1
4.(a)
A1
A1
(5)
(b)(i)
oe (see below)
Activities A, C, D and H cannot be critical
(b)(ii)
Activities B and F must be criticial
a1M1
Notes for Question 4
Condone lack of, or incorrect, numbered events throughout. ‘Dealt with
correctly’ means that the activity starts from the correct event but need not
necessarily finish at the correct event, e.g. ‘L dealt with correctly’ requires the
correct precedences for this activity, i.e. H and J labelled correctly and leading
into the same node and L starting from that node but do not consider the end
event for L. Activity on node is M0
If an arc is not labelled, for example, if the arc for activity E is not labelled (but
the arc is present) then this will lose the first A mark and the final (CSO) A
mark – they can still earn the second A mark on the bod. If two or more arcs are
not labelled then mark according to the scheme. Assume that a solid line is an
activity which has not been labelled rather than a dummy (even if in the correct
place for where a dummy should be). Ignore incorrect or lack of arrows on
the activities for the first four marks only
Nine activities (labelled on arc), one start and at least two dummies placed
Activities A, B, 1st dummy (including correct arrow), C, D, E and H dealt with
correctly
2nd dummy (including correct arrow), activities F, G, I and J dealt with correctly
Activities K, L and M dealt with correctly (so third and fourth dummies required
+ arrows)
CSO – all arrows correctly placed for each activity with one finish and at most
four dummies.
Please check all arcs carefully for arrows – if there are no arrows on any
dummies then M1 only.
Note that additional (but unnecessary) ‘correct’ dummies that still maintain
precedence for the network should only be penalised with the final A mark
if earned
CAO (A, C, D and H and no others)
CAO (B and F and no others – accept though if E mentioned )
a1A1
a2A1
a3A1
4A1
b1B1
b2B1
B1
B1
(2)
7 marks
Alternative equivalent graph
Activities C and D may be interchanged on either version
5.
1B1
1M1
Objective function is maximised at C(9, 22) and minimised at A(6, 8)
Let
Notes for Question 5
Recognises that the objective function is maximised at C and minimised at A
(possibly implied by later working). Award if correct coordinates (9, 22) and (6,
8) used in their calculations. Sight of
and
earns this
mark.
Setting up an objective function of the form
or
Allow consideration of
or any multiple
Considers the gradient of the objective function
Considers ratio between a and b (e.g. 4b = 4.5a)
2M1
3M1
1A1
A correct approach to find the objective function.
earns this mark (if no incorrect working seen).
This may be implied by consideration of e.g. 540/135
Candidates may adopt alternative algebraic approaches using
and
forming simultaneous equations.
Any algebraic approach leading to the correct answer with no incorrect working
is acceptable. e.g. Setting up an equation in their using correct point C and
their expression for P and solving for their (if correct
)
Dependent on previous M mark – using point A and their objective function (of
the form
where
) to get a value for
CAO (k = 240)
B1
M1
M1
dM1
A1
(5)
5 marks
6.(a)
Bin 3 has the largest sum of the four bins with 72
After the first three numbers were placed in Bin 1 (with a total of 64) the next
smallest value (the 11) could not fit in Bin 1
oe
e.g.
B1
B1
B1
(3)
or 74
middle right
(b)
28 31
5
16
5
11
5
11
5
11
5
11
middle left
5
11
16
13
13
13
25
15
15
15
15
15
16
13
13
16
16
16
35
18
18
18
18
18
18
28
28
22
22
22
22
31
31
25
25
25
11
25
25
28
28
27
27
35
22
31
27
28
15
22
27
27
31
31
13
27
35
35
35
35
Pivots
18
11, 35
15, 25
31
27
M1
A1
A1ft
A1
(4)
Pivots
35
18
11, 25
15, 31
28
(c)
28 31
5
25 16 35 18 22 11 27 15 13
28 31
5
25 16 18 22 11 27 15 13 35
5
16 11 15 13 18 28 31 25 22 27 35
5
11 16 15 13 18 22 25 28 31 27 35
5
11 13 15 16 18 22 25 28 27 31 35
5
11 13 15 16 18 22 25 27 28 31 35
After the 27 has been placed in Bin 2 (giving a total of 55) the 18 was placed in
Bin 3 not Bin 2 indicating that n < 55 + 18
n = 72
a1B1
a2B1
a3B1
b1M1
b1A1
b2A1ft
b3A1
c1B1
c2B1
Notes for Question 6
Correct reasoning why n is at least 72
States or shows a bin (3) has total 72 and concludes that this is the least value
Correct reasoning regarding the upper bound for n – that is as the second
smallest value (the 11) was not put in Bin 1 then n < the sum of Bin 1 + 11
or 74
Quick sort – pivots, p, selected and first pass gives <p, p, >p. If only choosing 1
pivot per iteration M1 only. If sorting into descending order then mark as a
misread
First pass correct and next pivots chosen correctly/consistently for second pass
Second and third passes correct (ft from their first pass and choice of pivots)
CSO (including a fifth pass)
Correct reasoning regarding the placement of the 18 in Bin 3 rather than Bin 2
(must explicitly mention 18)
Dependent on previous B mark - CAO (n = 72)
B1
dB1
(2)
9 marks
MISREAD – sorting into descending order
middle right
6.(b)
28 31
28 31
35 28
35 28
35 31
35 31
middle left
28
35
35
35
35
35
b1M1
b1A1
b2A1ft
b3A1
31
28
28
28
31
31
5
25
31
31
28
28
5
31
31
31
28
28
25
35
25
27
27
27
25
5
25
27
27
27
16
22
22
25
25
25
16
25
22
25
25
25
35
27
27
22
22
22
18
18
18
18
18
18
22
5
16
16
16
16
11
16
15
15
15
15
27
11
13
13
13
13
15
15
11
11
11
11
13
13
5
5
5
5
Pivots
18
11, 35
15, 25
31
27
Pivots
35
18
11, 25
15, 31
28
35 18 22 11 27 15 13
16 18 22 11 27 15 13
27 18
5
16 11 15 13
22 18 16 15 13 11
5
22 18 16 15 13 11
5
22 18 16 15 13 11
5
Notes for Question 6
Quick sort – pivots, p, selected and first pass gives <p, p, >p. If only choosing 1
pivot per iteration M1 only. If sorting into descending order then mark as a
misread
First pass correct and next pivots chosen correctly/consistently for second pass
Second and third passes correct (ft from their first pass and choice of pivots)
CSO (including a fifth pass)
REMOVE final two A marks earned in this section so max 2/4
M1
A1
A1ft
A1
(4)
7.(a)
(P=)
Subject to:
and maximise
B1
B1
M1
(
M1
M1
)
A1
(6)
(b)
Substitute
into
and simplify
so maximising a (positive) multiple of
equivalent to minimising the negative of this expression, that is,
*
M1
is
A1*
(2)
B1
B1
(c)
B1
R
(d)(i)
Vertices of R are
B1
(4)
M1 A1
(106.25)
(11,968.75)
dM1
(248.3)
(ii)
(11,258.3)
12560
So 36 acres for crop A, 24 for crop B and 40 acres for crop C
(iii)
a1B1
a2B1
a1M1
a2M1
a3M1
a1A1
b1M1
b1A1*
c1B1
c2B1
c3B1
c4B1
d1M1
d1A1
d2M1
d2A1
d3A1
Maximum expected profit is (£) 12 560
Notes for Question 7
If using A, B and C throughout (a) instead of x, y and z send to review
CAO – expression (160x + 75y + 125z) together with ‘max’ or ‘maximise’ not
‘maximum’
CAO (
)
where
is any inequality or equals – brackets must be present or
implied by later working (accept correct equivalent unsimplified forms)
where is any inequality or equals. Also allow
for this mark
(accept correct equivalent unsimplified forms)
(oe) where
is any inequality or equals.
Time may be converted to minutes (must be all 4 values)
(accept correct equivalent unsimplified forms)
All three constraints (
,
,
) correct – must have
integer coefficients with only one term in each variable. Condone omission of
the trivial constraints
(Accept e.g.
oe if
working in minutes)
Substitute
into their linear objective function and simplify to a
single term in x and a single term in y only
Explaining why maximising the correct objective 35x – 50y (+12500) is
equivalent to minimising
Any two lines correctly drawn
(
should pass within half a small square of (18, 54) and (42, 14))
(
should pass within half a small square of (20, 30) and (100, 0))
(
should pass within half a small square of (0, 100), (50, 50) and (100,
0))
(
must be drawn through the middle of the small square from (24, 0) to (26,
0))
Any three lines correctly drawn
All four lines correctly drawn (penalise any poorly drawn lines with the loss of
this mark)
Correct R labelled – dependent on all three previous B marks
Attempt to find the exact coordinates (must be finding at least two pairs of
coordinates) of their R – dependent on at least two B marks in (c)
CAO - all three exact coordinates of the correct R (accept 28.125 and 42. 3̇ but
not 42.3 or 42.33)
Point testing (objective line method is M0) – testing at least two of their vertices
of their R in either
or
- dependent on previous M
mark
All three values of P found (either exact or decimal equivalent for either
objective function) and stating the correct allocation of the three crops.
Allocation must be in context for crop A, B, C not x =, y =, z =
Maximum expected profit stated correctly (units not required)
FIRST RELEASED ON AP - EDEXCEL DISCORD
https://sites.google.com/view/ap-edexcel
A1
A1
(5)
17 marks
Pearson Education Limited. Registered company number 872828