Mathematics · June 2022 · Mark scheme · S3
Edexcel IAL Mathematics mark scheme for S3, June 2022, file IAL_MATHS_2022_MayJune_S3_MS.pdf.
Text of this paper
Mark Scheme (Results)
Summer 2022
Pearson Edexcel International Advanced Level
In Statistics S3 (WST03) Paper 01
Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding body. We
provide a wide range of qualifications including academic, vocational, occupational and specific
programmes for employers. For further information visit our qualifications websites at
www.edexcel.com or www.btec.co.uk. Alternatively, you can get in touch with us using the details
on our contact us page at www.edexcel.com/contactus.
Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help everyone progress
in their lives through education. We believe in every kind of learning, for all kinds of people,
wherever they are in the world. We’ve been involved in education for over 150 years, and by working
across 70 countries, in 100 languages, we have built an international reputation for our commitment
to high standards and raising achievement through innovation in education. Find out more about
how we can help you and your students at: www.pearson.com/uk
Summer 2022
Question Paper Log Number P72469A
Publications Code WST03_01_2206_MS
All the material in this publication is copyright
© Pearson Education Ltd 2022
General Marking Guidance
•
All candidates must receive the same treatment. Examiners
must mark the first candidate in exactly the same way as they
mark the last.
•
Mark schemes should be applied positively. Candidates must
be rewarded for what they have shown they can do rather
than penalised for omissions.
•
Examiners should mark according to the mark scheme not
according to their perception of where the grade boundaries
may lie.
•
There is no ceiling on achievement. All marks on the mark
scheme should be used appropriately.
•
All the marks on the mark scheme are designed to be
awarded. Examiners should always award full marks if
deserved,
i.e.
if
the
answer
matches
the
mark
scheme. Examiners should also be prepared to award zero
marks if the candidate’s response is not worthy of credit
according to the mark scheme.
•
Where some judgement is required, mark schemes will
provide the principles by which marks will be awarded and
exemplification may be limited.
•
Crossed out work should be marked UNLESS the candidate
has replaced it with an alternative response.
PEARSON EDEXCEL IAL MATHEMATICS
General Instructions for Marking
1. The total number of marks for the paper is 75.
2. The Edexcel Mathematics mark schemes use the following types of marks:
‘M’ marks
These are marks given for a correct method or an attempt at a correct method. In Mechanics they
are usually awarded for the application of some mechanical principle to produce an equation.
e.g. resolving in a particular direction, taking moments about a point, applying a suvat equation,
applying the conservation of momentum principle etc.
The following criteria are usually applied to the equation.
To earn the M mark, the equation
(i) should have the correct number of terms
(ii) be dimensionally correct i.e. all the terms need to be dimensionally correct
e.g. in a moments equation, every term must be a ‘force x distance’ term or ‘mass x distance’, if we
allow them to cancel ‘g’ s.
For a resolution, all terms that need to be resolved (multiplied by sin or cos) must be resolved to
earn the M mark.
M marks are sometimes dependent (DM) on previous M marks having been earned.
e.g. when two simultaneous equations have been set up by, for example, resolving in two
directions and there is then an M mark for solving the equations to find a particular quantity – this
M mark is often dependent on the two previous M marks having been earned.
‘A’ marks
These are dependent accuracy (or sometimes answer) marks and can only be awarded if the
previous M mark has been earned. E.g. M0 A1 is impossible.
‘B’ marks
These are independent accuracy marks where there is no method (e.g. often given for a comment
or for a graph)
A few of the A and B marks may be f.t. – follow through – marks.
3. General Abbreviations
These are some of the traditional marking abbreviations that will appear in the mark schemes.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
bod – benefit of doubt
ft – follow through
the symbol will be used for correct ft
cao – correct answer only
cso - correct solution only. There must be no errors in this part of the question to obtain
this mark
isw – ignore subsequent working
awrt – answers which round to
SC: special case
oe – or equivalent (and appropriate)
dep – dependent
indep – independent
dp decimal places
sf significant figures
The answer is printed on the paper
The second mark is dependent on gaining the first mark
4. All A marks are ‘correct answer only’ (cao.), unless shown, for example, as A1 ft to indicate
that previous wrong working is to be followed through. After a misread however, the
subsequent A marks affected are treated as A ft, but manifestly absurd answers should
never be awarded A marks.
5. For misreading which does not alter the character of a question or materially simplify it,
deduct two from any A or B marks gained, in that part of the question affected.
6. If a candidate makes more than one attempt at any question:
• If all but one attempt is crossed out, mark the attempt which is NOT crossed out.
• If either all attempts are crossed out or none are crossed out, mark all the attempts
and score the highest single attempt.
7. Ignore wrong working or incorrect statements following a correct answer.
Special notes for marking Statistics exams (for AAs only)
•
If a method leads to “probabilities” which are greater than 1 or less than 0 then M0 should
be awarded unless the mark scheme specifies otherwise.
•
Any correct method should gain credit. If you cannot see how to apply the mark scheme
but believe the method to be correct then please send to review.
•
For method marks, we generally allow or condone a slip or transcription error if these are
seen in an expression. We do not, however, condone or allow these errors in accuracy
marks.
Question
Number
1 (a)
Scheme
Marks
You would assign an average rank between the tied ranks
B1
(1)
(b)
Rank for total tournaments 1 3 4 6 8 9 2 5 10 7
d 2 = 0 + 1 + 1 + 4 + 9 + 9 + 25 + 9 + 1 + 9 [= 68]
M1
rs = 1 −
M1
6 '68'
10 (102 − 1)
dM1
= 0.5878…
(c)
awrt 0.588
H0 : = 0 , H1 : 0
Critical Value = 0.5636 or CR … 0.5636
Reject H0 or significant or lies in the critical region
There is sufficient evidence of a positive correlation between rank and total tournaments won
A1
(4)
B1
B1
dM1
A1
(4)
(d)
2.5% and rs = 0.6485 or CR … 0.6485
(a)
B1
(b)
M1
M1
dM1
A1
(c)
(1)
Notes
Total 10
for an appropriate explanation of how to deal with tied ranks. Ignore any comments regarding
PMCC Do not allow add 0.5 to both ranks
attempt to rank total tournaments (at least four correct) Condone reversed ranks
finding the difference between players rank and each of their total tournaments ranks and
evaluating d 2 May be implied by 68
dependent on 1st M1. Using 1 −
6 d2
with their
10(99)
d
2
(you will need to check their
d
2
if
no value shown)
97
awrt 0.588 Allow 165
B1
both hypotheses correct. Must be in terms of . Must be attached to H0 and H1 If rs is negative
in part (b) then allow H1 : 0
B1
critical value of 0.5636 If rs is negative in part (b) then allow –0.5636
dM1
A1
(d)
B1
B1
dependent on 2nd B1. A correct statement ft their part (b) and their CV– no context needed but do
not allow contradicting non contextual comments. This may be implied by a correct contextual
conclusion.
correct conclusion which is rejecting H0, which must mention rank and total tournaments. No
hypotheses is A0.
NB If they have used H1 : 0 then the maximum they can score is B1B1dM1A0
for 2.5% and a correct critical value of 0.6485
Question
Number
2 (a)
(b)
Scheme
Marks
7690
x=
= 76.9
100
669.24
sx 2 =
= 6.76
99
H0 : x = y
Z=
B1
M1 A1
(3)
H1 : x y
"76.9"− 75.9
"6.76" 2.22
+
100
80
B1
= 2.793...
awrt ± 2.79 M1 M1 A1
2 tailed critical value z = 2.5758
Reject H0/Significant/In the critical region
There is sufficient evidence to suggest that the mean water temperature after 4 hours for
brand A is different to brand B
B1
M1
(It is reasonable) since both samples are (reasonably) large
B1
A1ft
(7)
(c)
Notes
(a)
(b)
B1
for 76.9
M1
for use of
A1
for 6.76
for both hypotheses correct. Must be attached to H0 and H1 Allow equivalent hypotheses. Must
be in terms of Allow any letter for the subscripts
B1
M1
M1
A1
B1
M1
A1ft
(c)
(1)
Total 11
B1
1
2
( x − x ) oe
n −1
for a correct method to find the standard error. Follow through their values from (a)
a−b
an attempt at ±
with at least 3 of a, b, c or d correct.
c
d2
+
100 80
awrt ± 2.79
(Allow z = awrt 2.3263 if a one tailed test is used)
a correct statement consistent with their CV and Z value – need not be contextual but do not
allow contradicting non contextual comments. This may be implied by a correct contextual
conclusion.
This mark is dependent on the 2nd M mark being awarded. A correct contextual statement ft their
CV and their Z value
a correct explanation, which makes reference to both samples. e.g. Do not allow the sample is
large enough
z = awrt 2.5758 seen
Question
Number
3 (a)
Scheme
26.624 + 28.976
= 27.8
2
B1
28.976 − 26.624 = 2 1.96
or
28.976 = '27.8'+ 1.96
(1)
25
M1 B1
25
= 3*
2 z
26.624 = '27.8'− 1.96
or
25
(b)
(c)
Marks
A1* cso
(3)
3
25
= 2.1 So z = 1.75
M1 A1
P( Z '1.75') = P( Z − '1.75') = 1 − '0.9599 ' = '0.0401'
M1 A1ft
Confidence level = 100 (1 − 2 '0.0401' ) = 91.98%
M1 A1
(6)
(d)
2 1.96
3
1.5
n
6 1.96
n
1.5
n awrt 7.84 So n = 62
M1
dM1
A1 A1
(4)
Total 14
Notes
(a)
B1
for 27.8
for 28.976 − 26.624 = 2 z value
(b)
M1
28.976 = '27.8'− z value
B1
A1* cso
(c)
(d)
25
or 26.624 = '27.8'− z value
or
25
where 1.5 < z < 2.4
25
awrt 1.96
answer is given so no incorrect working must be seen
3
M1
for 2 z
A1
M1
for z = 1.75
for 1 – p, where p is a probability
A1ft
for 0.0401 or ft their z value (Allow 0.04)
M1
for 100 (1 − 2 0.0401) ft their P( Z −1.75)
A1
awrt 92.0 (allow 92)
M1
25
= 2.1
for 2 z value
3
n
1.5 oe z value must either be correct or consistent with part (b)
Allow ⩽ or = Condone > or ⩾
A1
Dependent on previous M mark. Correct rearrangement to get
Allow ⩾ or = Condone < or ⩽
awrt 7.84 may be implied by awrt 61.5
A1
for n = 62
dM1
n ... or n > … oe
Question
Number
4 (a)
Scheme
Marks
[Continuous] uniform on the interval [0, 7]
B1
(1)
(b)
mean = 3.5
B1
standard deviation =
=
(7 − 0)
2
M1
12
7
12
= 2.0207...
awrt 2.02
A1
(3)
(c)
49
N 3.5,
552
3.4 − "3.5"
3.6 − "3.5"
P ( 3.4 T 3.6 ) = P
Z
= P ( −0.34 Z 0.34 )
49
49
"
"
"
"
552
552
By the CLT T
= 0.6331 – (1 – 0.6331) (Calculator gives 0.6314…)
= 0.2662 (Calculator gives 0.2628…)
awrt 0.263 to 0.266
M1
M1 A1
M1
A1
(5)
(d)
Large/ independent/ random sample allows use of CLT
B1
(1)
Notes
Total 10
For the correct distribution stated (need uniform and correct interval) Allow U[0, 7] A fully
(a)
(b)
B1
1
correct pdf implies B1 e.g. f ( x) = 7
0
0„ x„ 7
otherwise
B1
M1
For 3.5
For a correct method for finding the standard deviation
A1
awrt 2.02 (Allow
7
12
or
7 3
6
oe)
(c)
M1
49
2.022
oe
Allow
N
3.5,
or ft from part (b) e.g. if Po(7)
552
46
7
given in part (a) allow N 7,
46
(d)
M1
A1
M1
A1
B1
For standardising using either 3.4 or 3.6 and their mean and standard deviation
For a fully correct expression for either 3.4 or 3.6. May be implied by ± awrt 0.34
For p – (1 – p) or 2(p – 0.5) oe
awrt 0.263 to 0.266
Any suitable assumption
For writing or using N 3.5,
Question
Number
5 (a)
(b)
Scheme
Marks
It is not a statistic as it involves unknown [population parameters]
B1
(1)
An estimator for is unbiased if its expected value is equal to
B1
(1)
(c)
1
E(U1 ) = 3E( X1 ) − 2E( X 2 ) or E(U 2 ) = ( E( X 1 ) + 3E( X 2 ) )
4
E(U1 ) = 3 − 2 = (therefore unbiased)
1
E(U 2 ) = ( + 3 ) = (therefore unbiased)
4
M1
A1cso
A1cso
(3)
(d)
Var(U1 ) = 9Var( X1 ) + 4Var( X 2 ) or Var(U 2 ) =
Var(U1 ) =13 2
1
9
Var( X1 ) + Var( X 2 )
16
16
M1
A1
5 2
8
As Var(U1 ) Var(U 2 ) U 2 is the most efficient estimator for
Var(U 2 ) =
A1
A1
(a)
B1
(b)
B1
(4)
Notes
Total 9
for a correct explanation, must include unknown
for a correct explanation that refers to expected X. Allow − E( X ) = 0 , but bias = 0 is B0
(c)
M1
for use of aE( X1 ) + bE( X 2 ) May be implied by 3 − 2 or
M1
for a correct solution for E(U1 ) with no incorrect working Condone missing notation. Condone
missing subscripts
for a correct solution for E(U 2 ) with no incorrect working seen Condone missing notation.
Condone missing subscripts
2
2
for use of a Var( X 1 ) + b Var( X 2 )
A1
Allow 9 + 4
A1
Allow
A1
for U 2 with a correct reason
A1cso
A1cso
(d)
1
( + 3 )
4
2
2
1 2 9 2
5
+ or 2 oe
8
16
16
NB It is possible to score M1 A0 A0 A1 if Var(U1 ) and Var(U 2 ) are correct
Question
Number
Scheme
M
6 (a)
N(80,100)
W
Marks
N(69, 25)
X = M1 + M 2 + M 3 + M 4 + M 5 + M 6 + W1 + W2 + W3
X
N(687, 675)
M1 A1
700 − 687
P( X 700) = P Z
= P( Z 0.500...)
675
( = 1 − 0.6915) = 0.3085 (Calculator gives 0.3084)
M1
A1
(4)
(b)
Let Y = Number of men in the lift
Y
N(80 x,100 x)
700 − 80 x
P(Y 700) = P Z
0.025
10 x
700 − 80 x
1.96
10 x
6400 x2 − 112384.16 x + 490000[ 0]
80 x + 19.6 x − 700[ 0]
Solving leading to
(a)
B1
B1
Solving leading to x 8.05...
So c = 8 (people)
Notes
for setting up normal distribution with mean 687
M1
B1
M1
M1
A1
(6)
Total 10
B1
for a correct variance (675) or for standard deviation ( 15 3 )
for standardising with 700, 687 and their standard deviation
for answer between 0.308 – 0.309
for setting up normal distribution with mean 80x and variance 100x (may be implied by use of
sd = 10 x ) Allow any letter
for standardising with 700, their mean and their standard deviation (if not stated then these must
be correct)
for an equation or inequality set = to 1.96 (Allow – 1.96)
M1
for a correct 3TQ ft their mean and standard deviation
M1
A1
(b)
x 2.838...
M1
M1
M1
M1
A1
for an attempt to solve their 3TQ with either x ... or x ... Allow = instead of < Condone >
or ⩾ If the answer is incorrect then we must see use of the quadratic formula/completing the
square (Allow one error)
cao
Question
Number
7 (a)
Scheme
Marks
H 0 : The observed distribution can be modelled by a discrete uniform distribution
Observed
(O − E )
Expected
x+6
x
x–8
x
x+8
x
x–5
x
x+4
x
x–5
x
Total = 6x
X2 =
(O − E ) 2
E
v = 6 −1= 5
;
Do not reject H 0 if
36
( x + 6)
x
x
64
( x − 8)
x
x
E
O2
or
− 6x
x
x
25
( x − 5)
x
x
16
( x + 4)
x
x
25
( x − 5)
x
x
B1 M1
2
2
2
Total =
6 x + 230
x
230
;
2
2
230
6 x + 230
2
or
6 x + 230
− 6x
M1 ; A1
B1 ; B1
2
„ '11.070 '
or
x
x … 20.7768... So x = 21
Hence the die was rolled “21” × 6 = 126 times
B1
for both hypotheses correct
(bi)
B1
for expected frequency = x
M1
2
( x + 8)
x
x
2
2
c 5 (0.05) = 11.070 CR: X … 11.070
230
2
64
x
(a)
for one correct
(O − E )
x
− 6 x „ '11.070 '
Notes
Allow H 0 : the die is not biased
2
O
or
E
M1
A1
(8)
M1 A1
(2)
Total 11
H1 : the die is biased
2
ft their expected frequency
E
M1
for an attempt at X 2 ft their values (At least 4 of these need to be seen and added)
A1
for either
230
x
(bii)
(1)
O2
E
Total =
Total = 6x
2
E
(bi)
(bii)
B1
H1 : The observed distribution cannot be modelled by a discrete uniform distribution
6 x + 230
2
or
− 6x
x
B1
for v = 6 − 1 = 5 May be implied by a correct critical value
B1
for a correct critical value ft their DOF (NB common error is v = 4 so c 24 (0.05) = 9.488 )
M1
for either
A1
M1
A1
230
6 x 2 + 230
− 6 x „ their CV Allow < rather than „
x
x
for x = 21 provided the previous M mark has been awarded
for their 21 × 6 Allow 6 × x or the answer to 6 × their value for x
cao
„ their CV or
Pearson Education Limited. Registered company number 872828
with its registered office at 80 Strand, London, WC2R 0RL, United Kingdom