A-level
FURTHER MATHEMATICS
7367/3S
Paper 3 Statistics
Mark scheme
June 2020
Version: 1.0 Final Mark Scheme

*206a7367/3s/MS*

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2020

Mark schemes are prepared by the Lead Assessment Writer and considered, together with the
relevant questions, by a panel of subject teachers. This mark scheme includes any
amendments made at the standardisation events which all associates participate in and is the
scheme which was used by them in this examination. The standardisation process ensures that
the mark scheme covers the students’ responses to questions and that every associate
understands and applies it in the same correct way. As preparation for standardisation each
associate analyses a number of students’ scripts. Alternative answers not already covered by
the mark scheme are discussed and legislated for. If, after the standardisation process,
associates encounter unusual answers which have not been raised they are required to refer
these to the Lead Examiner.
It must be stressed that a mark scheme is a working document, in many cases further
developed and expanded on the basis of students’ reactions to a particular paper. Assumptions
about future mark schemes on the basis of one year’s document should be avoided; whilst the
guiding principles of assessment remain constant, details will change, depending on the content
of a particular examination paper.
Further copies of this mark scheme are available from aqa.org.uk

Copyright information
AQA retains the copyright on all its publications. However, registered schools/colleges for AQA are permitted to copy material from this booklet for their own
internal use, with the following important exception: AQA cannot give permission to schools/colleges to photocopy any material that is acknowledged to a third
party even for internal use within the centre.
Copyright © 2020 AQA and its licensors. All rights reserved.

2

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2020

Mark scheme instructions to examiners
General
The mark scheme for each question shows:
• the marks available for each part of the question
• the total marks available for the question
• marking instructions that indicate when marks should be awarded or withheld including the
principle on which each mark is awarded. Information is included to help the examiner make
his or her judgement and to delineate what is creditworthy from that not worthy of credit
• a typical solution. This response is one we expect to see frequently. However credit must be
given on the basis of the marking instructions.
If a student uses a method which is not explicitly covered by the marking instructions the same
principles of marking should be applied. Credit should be given to any valid methods.
Examiners should seek advice from their senior examiner if in any doubt.
Key to mark types
M

mark is for method

R

mark is for reasoning

A

mark is dependent on M marks and is for accuracy

B

mark is independent of M marks and is for method and accuracy

E

mark is for explanation

F

follow through from previous incorrect result

Key to mark scheme abbreviations
CAO

correct answer only

CSO

correct solution only

ft

follow through from previous incorrect result

‘their’

indicates that credit can be given from previous incorrect result

AWFW

anything which falls within

AWRT

anything which rounds to

ACF

any correct form

AG

answer given

SC

special case

OE

or equivalent

NMS

no method shown

PI

possibly implied

sf

significant figure(s)

dp

decimal place(s)

3

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2020

Examiners should consistently apply the following general marking principles:
No Method Shown
Where the question specifically requires a particular method to be used, we must usually see
evidence of use of this method for any marks to be awarded.
Where the answer can be reasonably obtained without showing working and it is very unlikely
that the correct answer can be obtained by using an incorrect method, we must award full
marks. However, the obvious penalty to candidates showing no working is that incorrect
answers, however close, earn no marks.
Where a question asks the candidate to state or write down a result, no method need be shown
for full marks.
Where the permitted calculator has functions which reasonably allow the solution of the
question directly, the correct answer without working earns full marks, unless it is given to less
than the degree of accuracy accepted in the mark scheme, when it gains no marks.
Otherwise we require evidence of a correct method for any marks to be awarded.
Diagrams
Diagrams that have working on them should be treated like normal responses. If a diagram has
been written on but the correct response is within the answer space, the work within the answer
space should be marked. Working on diagrams that contradicts work within the answer space
is not to be considered as choice but as working, and is not, therefore, penalised.
Work erased or crossed out
Erased or crossed out work that is still legible and has not been replaced should be marked.
Erased or crossed out work that has been replaced can be ignored.
Choice
When a choice of answers and/or methods is given and the student has not clearly indicated
which answer they want to be marked, mark positively, awarding marks for all of the student's
best attempts. Withhold marks for final accuracy and conclusions if there are conflicting
complete answers or when an incorrect solution (or part thereof) is referred to in the final
answer.

4

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2020

AS/A-level Maths/Further Maths assessment objectives

AO

Description
AO1.1a Select routine procedures

AO1

AO1.1b Correctly carry out routine procedures
AO1.2

Accurately recall facts, terminology and definitions

AO2.1

Construct rigorous mathematical arguments (including proofs)

AO2.2a Make deductions

AO2

AO2.2b Make inferences
AO2.3

Assess the validity of mathematical arguments

AO2.4

Explain their reasoning

AO2.5

Use mathematical language and notation correctly

AO3.1a Translate problems in mathematical contexts into mathematical processes
AO3.1b Translate problems in non-mathematical contexts into mathematical processes
AO3.2a Interpret solutions to problems in their original context
AO3.2b Where appropriate, evaluate the accuracy and limitations of solutions to problems

AO3

AO3.3

Translate situations in context into mathematical models

AO3.4

Use mathematical models

AO3.5a Evaluate the outcomes of modelling in context
AO3.5b Recognise the limitations of models
AO3.5c

5

Where appropriate, explain how to refine models

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2020

Q

Marking Instructions

AO

Marks

1

Circles correct answer.

1.1b

B1

Total
Marking Instructions

AO

Marks

2

Circles correct answer.

1.1b

B1

6

3
5

1

Q

Total

Typical Solution

1

Typical Solution
0.0500

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2020

Q
3(a)

3(b)

Marking Instructions

AO

Marks

Obtains correct z value.
AWRT 1.88
PI by a correct upper or lower limit
of the confidence interval.

1.1b

B1

7

z = 1.88

Uses formula for upper or lower
limit of a confidence interval using
their z-value and sample mean and
variance.
Condone use of 98
May use t-value.

1.1a

Obtains correct confidence interval
AWRT 1dp.

1.1b

A1

States yes and explains that the
sample size has changed and is
part of the calculation or a t
distribution would be used instead
of a z distribution or the confidence
interval will be wider.

2.4

E1

Total

Typical Solution

x±z

M1

s2
n

= 1196 ± 1.88

98
600

= (1188.5, 1203.5)

4

Yes as the sample size has
changed and is part of the
calculation.

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2020

Q

Marking Instructions

AO

Marks

4(a)

Uses formula for E(X)

1.1a

M1

Typical Solution
E(X) =

x

n

∑n =
i =1

Obtains an expression for E(X) by
using the formula for ∑ n

1.1b

A1

Uses formula for E(X 2)

1.1a

M1

n
(1 + n )
2
=
n
n +1
=
2

x 2 12 + 22 + ... + n 2
=
E(X ) = ∑
n
i =1 n
1
n( n + 1)( 2n + 1)
6
=
n
( n + 1)( 2n + 1)
=
6
2
( n + 1)( 2n + 1)  n + 1 
Var (X) =
−

6
 2 
2n 2 + 3n + 1 n 2 + 2n + 1
−
=
6
4
2
2
4n + 6n + 2 − 3n − 6n − 3
=
12
2
n −1
=
12
2

Obtains an expression for E(X 2) by

1.1b

A1

Uses the formula for Var (X) or
uses Var (Y) = 22 Var (X)

1.1a

M1

Obtains correct expression for
Var (X)

1.1b

A1

2.1

R1

using the formula for

∑n

2

Completes a rigorous algebraic
proof by using Var (Y) = 22 Var (X)
2

to show that Var (Y) =

n −1
3

1 + 2 + ... + n
n

n

Var (Y) = Var (2X) = 22 Var (X)

n2 − 1
=4×
12
2
n −1
=
3

4(b)

Obtains probability that next value
spinner lands on is greater than 2
0.75 OE

1.1b

B1

3×

4(c)

Explains that the spinner toy is
unbiased or the probability of
obtaining each score is equal.

3.5b

E1

The spinner toy is unbiased.

Total

8

9

1
= 0.75
4

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2020

Q
5(a)

5(b)

5(c)

Marking Instructions

AO

Marks

States both hypotheses using
correct language.

2.5

B1

Evaluates the Poisson model by
comparing the sample with the
critical region.

3.5a

R1

Infers H0 not rejected.
FT ‘their’ comparison.

2.2b

Concludes in context.
(Conclusion should not be
definite)
FT their incorrect rejection of H0 if
stated or ‘their’ comparison if not.

3.2a

E1F

Uses Poisson model with λ = 7 to
calculate a cumulative probability.

1.1a

M1

9

H0: λ = 8
H1: λ ≠ 8

3 is not in the critical region.
E1F

Accept H0
There is no significant evidence to
suggest that the average number
of runners per minute passing the
shop is not 8

P(X ≤ 2) = 0.0296
P(X ≥ 14) = 0.0128

Uses Poisson model with λ = 7 to
calculate both P(X ≤ 2) = AWRT
0.0296 and P(X ≥ 14) = AWRT
0.0128
or
P(3 ≤ X ≤ 13) = AWRT 0.958

1.1b

Obtains power of the test
AWRT 0.0424

1.1b
Total

Typical Solution

A1

Power = 0.0296 + 0.0128
= 0.0424

A1F
7

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2020

Q
6(a)

Marking Instructions

AO

Marks

Uses the mean equalling 25 to find
the value of λ

3.3

M1

Evaluates an exponential model to
find P(X ≤ 2)
or
uses it to find x

6(c)

λ

= 25

λ = 0.04

1.1b

A1

= 0.077 > 0.05
The probability of a ‘Red’ rating has
increased.

Concludes probability higher or
probability will be increased
because 2 metres is higher than
1.3 metres.
FT ‘their’ probability or x value.

3.2a

E1F

States the correct probability
density function for x ≥ 0 for their
value of λ

1.1b

B1F

0.04e −0.04 x
f ( x) = 
0

States the complete correct
probability density function
including x < 0 (or otherwise).

1.2

B1F

Obtains the standard deviation of
the exponential model
or
the value of λ (0.2) corresponding
to a standard deviation of 5 metres.

1.1b

B1

Explains that the model is not
appropriate as the actual standard
deviation is not close to the
standard deviation of the model
or
λ values are different.
Total

10

M1

1

P(X ≤ 2) = 1 – e-0.04 × 2

Find P(X ≤ 2) = AWRT 0.077
or
x = AWRT 1.3 metres.

6(b)

3.4

Typical Solution

s.d. =

3.5b

E1

8

x≥0

otherwise 

1
= 25 metres
0.042

The model is not appropriate as the
actual standard deviation of 5
metres is very different from the
standard deviation of the model.

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2020

Q
7(a)

Marking Instructions

AO

Marks

States both hypotheses using
correct language.

2.5

B1

Obtains t test statistic with ‘their’
sample mean and variance.
Condone z =

1.1a

M1

Obtains t test statistic correctly
or
find p = AWRT 0.0556
Condone z =

1.1b

H0: µ = 1.8
H1: µ > 1.8
A1

t=

2 − 1.8
0.4
12

t = 1.73

Evaluates t model by comparing
‘their’ test statistic and correct
critical value
or
by comparing p value with 0.05

3.5a

Infers H0 not rejected.
FT ‘their’ comparison using the t
model.

2.2b

E1F

3.2a

E1F

3.2a

E1

To conclude that the rainfall per
day in February has not increased
when it has.

E1

The assumption of a normal
distribution is not appropriate
because the distribution is not
symmetrical.

Concludes in context.
(Conclusion must not be definite)
FT their incorrect rejection of H0 or
‘their’ test statistic (or p-value) and
‘their’ critical value (or 0.05) if not.

7(b)

States to accept that the mean
rainfall per day in February has not
increased when it has.

7(c)

Recognises that the assumption is
not appropriate because the
distribution is not symmetrical or
is skewed.
Total

11

Typical Solution

M1

t11 at 95% = 1.796
1.73 < 1.796
Accept H0

3.5b

8

No significant evidence to suggest
that the rainfall in February in the
town has increased.

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2020

Q
8(a)

8(b)

Marking Instructions

AO

Marks

Deduces that two columns will
need to be merged as there is an
expected frequency less than 5

2.2a

E1

2.2a

Explains that Yates’ correction will
need to be used.

3.5c

E1

Evaluates χ2-test statistic by
comparing the correct critical
value with the test statistic.

3.5a

R1

Infers H0 rejected.
FT ‘their’ critical value.

2.2b

Total

12

There is an expected frequency
less than 5 so two columns will
need to be merged.
This means that the test will only
have 1 degree of freedom.

Deduces that there is only 1
degree of freedom or that this will
form a 2×2 table.
Allow if only seen in 8(b).

Concludes in context.
(Conclusion must not be definite)
FI their incorrect acceptance of H0
if stated or ‘their’ comparison if
not.

Typical Solution

E1

This means that Yates’ correction
will need to be used and so the test

( O − E − 0.5) 2
statistic will be ∑
E
2
(O − E )
rather than ∑
E

χ2 cv for 1 df = 6.635
8.74 > 6.635

3.2a

E1F

E1F

6

Reject H0
Significant evidence to suggest that
there is an association between
time of day and number of snacks
eaten.

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2020

Q

Marking Instructions

AO

Marks

9

Differentiates the cumulative
distribution function of X to obtain
f(x) in the form ax2 + bx + c

1.1a

M1

Uses correct integral of the form

∫x

3

f( x) dx with any limits to find

1.1a

M1

3
( 4 x 2 + 4 x + 1)
62
2

3
E(X ) =
x 3 ( 4 x 2 + 4 x + 1) dx
∫
62 0

542
or
155

1.1b

Obtains E(Y) by evaluating 2 ×
0.5 + 7 × 0.1 + 13 × 0.1 + 19 ×
0.3
Uses formula
E(X 3 + Y) = E(X 3) + E(Y)

3781
310

Total

A1

=

542
155

E(Y) = 2 × 0.5 + 7 × 0.1 + 13 × 0.1
+ 19 × 0.3
1.1a

1.1a

Completes a rigorous method to
correctly show that

13

1
( 24 x 2 + 24 x + 6)
124

3

Obtains E(X 3) =

E(X 3 + Y) =

f(x) =

=

E(X 3)

AWRT 3.5

Typical Solution

2.1

M1

M1

R1

6

=

87
10

E(X 3 + Y) = E(X3) + E(Y)
=

542
87
+
10
155

=

3781
310