Further Mathematics · June 2024 · Mark scheme · Paper 3 Statistics

AQA A Level Further Mathematics mark scheme for Paper 3 Statistics, June 2024 — 7367, file AQA-7367-Paper-3-Statistics-MS-JUN24.pdf.

Advertisement
Loading the paper…
Text of this paper

A-level
FURTHER MATHEMATICS
7367/3S
Paper 3 Statistics
Mark scheme
June 2024
Version: 1.0 Final

*246A7367/3s/MS*

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2024

Mark schemes are prepared by the Lead Assessment Writer and considered, together with the
relevant questions, by a panel of subject teachers. This mark scheme includes any amendments
made at the standardisation events which all associates participate in and is the scheme which
was used by them in this examination. The standardisation process ensures that the mark scheme
covers the students’ responses to questions and that every associate understands and applies it in
the same correct way. As preparation for standardisation each associate analyses a number of
students’ scripts. Alternative answers not already covered by the mark scheme are discussed and
legislated for. If, after the standardisation process, associates encounter unusual answers which
have not been raised they are required to refer these to the Lead Examiner.
It must be stressed that a mark scheme is a working document, in many cases further developed
and expanded on the basis of students’ reactions to a particular paper. Assumptions about future
mark schemes on the basis of one year’s document should be avoided; whilst the guiding
principles of assessment remain constant, details will change, depending on the content of a
particular examination paper.
No student should be disadvantaged on the basis of their gender identity and/or how they refer to
the gender identity of others in their exam responses.
A consistent use of ‘they/them’ as a singular and pronouns beyond ‘she/her’ or ‘he/him’ will be
credited in exam responses in line with existing mark scheme criteria.

Further copies of this mark scheme are available from aqa.org.uk

Copyright information
AQA retains the copyright on all its publications. However, registered schools/colleges for AQA are permitted to copy material from this booklet for their own
internal use, with the following important exception: AQA cannot give permission to schools/colleges to photocopy any material that is acknowledged to a third
party even for internal use within the centre.
Copyright © 2024 AQA and its licensors. All rights reserved.

2

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2024

Mark scheme instructions to examiners
General
The mark scheme for each question shows:
• the marks available for each part of the question
• the total marks available for the question
• marking instructions that indicate when marks should be awarded or withheld including the
principle on which each mark is awarded. Information is included to help the examiner make his
or her judgement and to delineate what is creditworthy from that not worthy of credit
• a typical solution. This response is one we expect to see frequently. However credit must be
given on the basis of the marking instructions.
If a student uses a method which is not explicitly covered by the marking instructions the same
principles of marking should be applied. Credit should be given to any valid methods. Examiners
should seek advice from their senior examiner if in any doubt.
Key to mark types
M

mark is for method

R

mark is for reasoning

A

mark is dependent on M marks and is for accuracy

B

mark is independent of M marks and is for method and accuracy

E

mark is for explanation

F

follow through from previous incorrect result

Key to mark scheme abbreviations
CAO

correct answer only

CSO

correct solution only

ft

follow through from previous incorrect result

‘their’

indicates that credit can be given from previous incorrect result

AWFW

anything which falls within

AWRT

anything which rounds to

ACF

any correct form

AG

answer given

SC

special case

OE

or equivalent

NMS

no method shown

PI

possibly implied

sf

significant figure(s)

dp

decimal place(s)

ISW

Ignore Subsequent Workings

3

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2024

Examiners should consistently apply the following general marking principles:
No Method Shown
Where the question specifically requires a particular method to be used, we must usually see
evidence of use of this method for any marks to be awarded.
Where the answer can be reasonably obtained without showing working and it is very unlikely that
the correct answer can be obtained by using an incorrect method, we must award full marks.
However, the obvious penalty to candidates showing no working is that incorrect answers, however
close, earn no marks.
Where a question asks the candidate to state or write down a result, no method need be shown for
full marks.
Where the permitted calculator has functions which reasonably allow the solution of the question
directly, the correct answer without working earns full marks, unless it is given to less than the
degree of accuracy accepted in the mark scheme, when it gains no marks.
Otherwise we require evidence of a correct method for any marks to be awarded.

Diagrams
Diagrams that have working on them should be treated like normal responses. If a diagram has
been written on but the correct response is within the answer space, the work within the answer
space should be marked. Working on diagrams that contradicts work within the answer space is
not to be considered as choice but as working, and is not, therefore, penalised.
Work erased or crossed out
Erased or crossed out work that is still legible and has not been replaced should be marked.
Erased or crossed out work that has been replaced can be ignored.
Choice
When a choice of answers and/or methods is given and the student has not clearly indicated which
answer they want to be marked, mark positively, awarding marks for all of the student’s best
attempts. Withhold marks for final accuracy and conclusions if there are conflicting complete
answers or when an incorrect solution (or part thereof) is referred to in the final answer.

4

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2024

AS/A-level Maths/Further Maths assessment objectives

AO

Description

AO1.1a Select routine procedures

AO1

AO1.1b Correctly carry out routine procedures
AO1.2

Accurately recall facts, terminology and definitions

AO2.1

Construct rigorous mathematical arguments (including proofs)

AO2.2a Make deductions

AO2

AO2.2b Make inferences
AO2.3

Assess the validity of mathematical arguments

AO2.4

Explain their reasoning

AO2.5

Use mathematical language and notation correctly

AO3.1a Translate problems in mathematical contexts into mathematical processes
AO3.1b Translate problems in non-mathematical contexts into mathematical processes
AO3.2a Interpret solutions to problems in their original context
AO3.2b Where appropriate, evaluate the accuracy and limitations of solutions to problems

AO3

AO3.3

Translate situations in context into mathematical models

AO3.4

Use mathematical models

AO3.5a Evaluate the outcomes of modelling in context
AO3.5b Recognise the limitations of models
AO3.5c

Where appropriate, explain how to refine models

5

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2024

Q

Marking Instructions

AO

Marks

1

Circles the 1st answer

1.1b

B1

Question total
Marking Instructions

AO

Marks

2

Circles the 3rd answer

1.1b

B1

Question total

Typical Solution
1 – e–0.7

1

Q

Marking Instructions

AO

Marks

3

Circles the 2nd answer

1.1b

B1

6

4

1

Q

Question total

Typical Solution

1

Typical Solution
10 – 3 2
2

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2024

Q

Marking Instructions

AO

Marks

4

States both hypotheses using
correct language using either
λ = 140 or λ = 20
May use λ or μ

2.5

B1

Typical Solution
H0 : λ = 140
H1 : λ > 140
X

P(X ≥ 162) = 0.037

Uses Poisson model X ~ Po(140)
to calculate one of
P(X ≥ 162) = AWRT 0.037
P(X ≤ 161) = AWRT 0.963
P(X > 162) = AWRT 0.031
P(X ≤ 162) = AWRT 0.969
or P(X ≥ 161) = AWRT 0.044
PI by correct critical region

3.3

Uses Poisson model to calculate
P(X ≥ 162) = AWRT 0.037
or finds correct critical region
X ≥ 161

3.4

A1

3.5a

M1

2.2b

A1F

3.2a

R1

Evaluates the Poisson model by
correctly comparing their
probability with 0.05 or 0.025 if a
two-tailed test is performed

~ Po(140)

0.037 < 0.05
M1

Reject H0
Sufficient evidence to suggest that
the mean number of volcanic
eruptions per week has increased.

or by correctly comparing 162
with their critical region

Infers H0 rejected.
FT comparison using their
P(X ≥ 162) or P(X > 162) with
0.05 or 0.025 if a two-tailed test is
performed
or their critical region which must
correspond to an upper tail of the
distribution.
Condone Accept H1

Concludes, from a fully correct
comparison, in context by
referring to the mean number of
volcanic eruptions per week. OE
(Conclusion must not be definite,
eg use of ‘suggest’, ‘support’)
Question total

6

7

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2024

Q

Marking Instructions

5

Uses  e 3 d x with any or no
6
limits
Condone missing d x

x

1

x

AO

Marks

1.1a

M1

Typical Solution

ln 27


0

x
6

1

x

e3 d x

 x 1x 
=  e3 

Uses integration by parts the
correct way round to obtain
1
1
x
x

3
3
kx
e
–
k
e
d x with any or no

 


limits
Condone missing d x
PI

3.1a

M1

x

1

e3

Completes reasoned argument to
3
obtain (ln 27 – 2)
2
Question total

8


0

 x 1x 3 1x 
=  e3 – e3 
2

2

3

9

3
2

1.1b

A1
3
2

= (ln 27 – 2)

x

6
which must have at least two
terms
PI by sight of AWRT 1.94

0

= ln 27 – 3

Substitutes limits of 0 and ln 27
and subtracts the correct way
round in their integral of

ln 27

–

1 31 x
e dx
2

ln 27

0

3

= ln 27 –  – 
2
2 2

1
x
3

3 1x
Obtains e – e 3 OE
2
2
Components of the integrated
function may be seen on different
lines.

x

2

ln 27

1.1a

M1

2.1

R1

5

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2024

Q
6(a)

Marking Instructions

AO

Marks

States normally distributed OE

3.5b

B1

Subtotal

Typical Solution
Assume that retirement ages are
normally distributed.

1

9

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2024

Q
6(b)

Marking Instructions

AO

Marks

States both hypotheses using correct
language.

2.5

B1

Typical Solution
H0: µ = 29.5
H1: µ ≠ 29.5

x = 30.42
Obtains x = 30.42 and s2 = 1.9525 OE
781
s2 implied by s =
or AWRT 1.40
20

1.1b

B1

s2 = 1.9525
t=

Attempts to calculate t =

their x – 29.5
their s

5

t = 1.47

Condone z =
or attempts to calculate

t4 at 95% = 2.13
their s 2

their x − their critical value 

3.3

M1
1.47 < 2.13

5

Do not reject H0

or attempts to calculate
their s

2

Insufficient evidence to suggest
that the mean retirement age is
not 29.5

5

Obtains t = AWRT 1.47
Condone z =
or obtains correct lower limit of
confidence interval, AWRT 29.1
or obtains correct upper limit of critical
region, AWRT 30.8

3.4

A1

Obtains correct critical value
AWRT 2.13
or obtains p = AWRT 0.11

1.1b

B1

Evaluates t model by comparing their
test statistic and their critical value
or by comparing their p value with 0.05
or 0.1 if a one-tailed test is performed
or by comparing 29.5 and their lower
limit of their confidence interval
or by comparing their x and their upper
limit of their critical region

3.5a

M1

2.2b

A1F

Infers H0 not rejected.
FT their comparison using the t model.
Condone Accept H0 or Reject H1

10

1.9525

2

5

29.5 + their critical value 

30.42 – 29.5

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2024

Concludes, from a fully correct
comparison, in context by referring to
mean retirement age.
(Conclusion must not be definite, eg
use of ‘suggest’, ‘support’)

3.2a

R1

Subtotal

8

Question total

9

11

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2024

Q

Marking Instructions

7(a)
States

n2 – 1
12

AO

Marks

1.2

B1

Var( X ) =

OE
Subtotal

Q
7(b)

Typical Solution

n2 – 1
12

1

Marking Instructions

AO

Marks

States Y = 3X + 10 or Y replaced
by 3X + 10

3.1a

M1

Typical Solution

Y = 3X + 10
Var(Y) = Var(3X + 10) = 32Var(X)

States or uses Var(3X + k) =
32Var(X) or 9Var(X)
PI by 32 × their Var(X)

1.1a

M1

=3 ×

12

12
3( n – 1)
2

=
Completes reasoned argument to
3( n 2 – 1)
obtain
4
OE
Must see Y replaced by 3X + 10
and Var(3X + 10) = 32Var(X) or
9Var(X)

n2 – 1

2

2.1

R1

Subtotal

3

Question total

4

4

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2024

Q

Marking Instructions

AO

Marks

8

Uses correct formula for E(X)

1.1a

M1

Obtains either P(X > E(X)) or
P(X > E(X) ∩ X ≤ 17) for their E(X)

Typical Solution
E(X) = 7 × 0.4 + 13 × 0.35 + 17 ×
0.1 + 21 × 0.15
E(X) = 12.2

1.1a

M1

P(X > E(X)) = P(X ≥ 13)

= 0.35 + 0.1 + 0.15 = 0.6
Obtains P(X > E(X)) = 0.6
and P(X > E(X) ∩ X ≤ 17) = 0.45
Condone incorrect E(X) that leads
to these values

Uses conditional probability
P( X  E( X )  X  17)
formula
P( X  E( X ))

P(E(X) < X ≤ 17) = P(13 ≤ X ≤ 17)
1.1b

A1

= 0.35 + 0.1 = 0.45
P(X ≤ 17 | X > E(X)) =
P(13  X  17) 0.45
=
= 0.75
P( X  13)
0.6

1.1a

M1

2.1

R1

Completes reasoned argument to
obtain P(X ≤ 17 | X > E(X)) = 0.75
CSO
Must see E(X) = 12.2 OE
P(X > E(X)) = 0.6 OE
and P(X > E(X) ∩ X ≤ 17) = 0.45
OE

Question total

5

13

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2024

Q
9(a)

Marking Instructions

AO

Marks

Calculates one correct row or
column.

3.1b

M1

14

A
B
C

Calculates two correct rows or two
correct columns or one correct row
and one correct column.

1.1b

A1

Obtains all the correct observed
frequencies.

1.1b

A1

Subtotal

Typical Solution

3

G
65
80
65

S
90
100
71

P
95
70
114

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2024

Q
9(b)

Marking Instructions

AO

Marks

States both hypotheses using
correct language. Variables need
to be stated in at least the null
hypothesis.

2.5

B1

Obtains correct expected
contingency table for χ 2 model.
PI

Attempts to calculate

( O – E )2

E

B1

( O – E )2

E

Condone slips if intent clear
PI

Obtains

3.3

= AWRT 17.6

3.4

M1

Typical Solution
H0: There is no association
between shop and rating
H1: There is an association
between shop and rating
E
A
B
C

G
70
70
70

( O – E )2

E

S
87
87
87

P
93
93
93

=

(65 – 70)2 + (80 – 70)2 + (65 – 70)2

1.1b

A1

87
2
(95 – 93) + (70 – 93)2 + (114 – 93)2
93

= 17.60
Obtains correct critical value
AWRT 13.3
or obtains p = AWRT 0.001

+

70
2
(90 – 87) + (100 – 87)2 + (71 – 87)2

χ 2 cv for 4 df = 13.277
1.1b

B1
17.60 > 13.277
Reject H0

Evaluates χ 2 -test statistic by
comparing their test statistic with
their critical value or their p with
0.01

3.5a

M1

Infers H0 rejected.
FT their comparison using the χ 2
model.
Condone Accept H1

2.2b

A1F

Concludes, from a fully correct
comparison, in context by referring
to association between shop and
rating. OE
(The conclusion must not be
definite, eg use of ‘suggest’,
‘support’)

3.2a

R1

Subtotal

8

Question total

11

Sufficient evidence to suggest that
there is an association between
shop and rating.

15

+

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2024

Q
10(a)

Marking Instructions

AO

Marks

Obtains correct z or t value
AWRT 1.70
PI

1.1b

B1

10(b) (i)

16

1.3
250

(10.06, 10.34)

Uses formula for upper or lower
limit of a confidence interval
using their z or t value.
PI

1.1a

M1

Obtains correct confidence
interval
AWRT 10.06 and 10.34

1.1b

A1
3

Marking Instructions

AO

Marks

Explains that the null hypothesis
is rejected because 10.36 is
outside the confidence interval.
Must see reference to 10.36
FT a correct conclusion for their
confidence interval.

2.4

E1F

Subtotal

z = 1.6954
10.2 ± 1.6954 ×

Subtotal
Q

Typical Solution

1

Typical Solution
The null hypothesis is rejected as
10.36 is outside the confidence
interval.

MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2024

Q
10(b) (ii)

Marking Instructions

AO

Marks

Uses formula for upper or lower
critical value for the hypothesis
test.
FT their z value
PI

1.1a

M1

Typical Solution
10.36 ± 1.6954 ×

1.3
250

(10.221, 10.499)

X ~ N  10.32,


1.3 
Uses X ~ N  10.32,

250 

model to find the probability of
either their lower or upper tail or
1 – their P(Type II error).
(must not use 10.2, 10.32 or
10.36)
PI

1.1a

Obtains correct power of the test
AWRT 0.13

1.1b

2

1.32 

250 

P(X < 10.221) = 0.114
P(X > 10.499) = 0.015
M1

Power of test = 0.114 + 0.015

= 0.13

A1

Subtotal

3

Question total

7

Paper total

50

17

Advertisement