Further Mathematics · June 2019 · Mark scheme · Paper 3 Statistics
AQA A Level Further Mathematics mark scheme for Paper 3 Statistics, June 2019 — 7367, file AQA-7367-Paper-3-Statistics-MS-JUN19.pdf.
Text of this paper
A-level
FURTHER MATHEMATICS
7367/3S
Paper 3 Statistics
Mark scheme
June 2019
Version: 1.0 Final
*196A7367/3S/MS*
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2019
Mark schemes are prepared by the Lead Assessment Writer and considered, together with the
relevant questions, by a panel of subject teachers. This mark scheme includes any
amendments made at the standardisation events which all associates participate in and is the
scheme which was used by them in this examination. The standardisation process ensures that
the mark scheme covers the students’ responses to questions and that every associate
understands and applies it in the same correct way. As preparation for standardisation each
associate analyses a number of students’ scripts. Alternative answers not already covered by
the mark scheme are discussed and legislated for. If, after the standardisation process,
associates encounter unusual answers which have not been raised they are required to refer
these to the Lead Examiner.
It must be stressed that a mark scheme is a working document, in many cases further
developed and expanded on the basis of students’ reactions to a particular paper. Assumptions
about future mark schemes on the basis of one year’s document should be avoided; whilst the
guiding principles of assessment remain constant, details will change, depending on the content
of a particular examination paper.
Further copies of this mark scheme are available from aqa.org.uk
Copyright © 2019 AQA and its licensors. All rights reserved.
AQA retains the copyright on all its publications. However, registered schools/colleges for AQA are permitted to copy material from
this booklet for their own internal use, with the following important exception: AQA cannot give permission to schools/colleges to
photocopy any material that is acknowledged to a third party even for internal use within the centre.
2
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2019
Mark scheme instructions to examiners
General
The mark scheme for each question shows:
• the marks available for each part of the question
• the total marks available for the question
• marking instructions that indicate when marks should be awarded or withheld including the
principle on which each mark is awarded. Information is included to help the examiner make
his or her judgement and to delineate what is creditworthy from that not worthy of credit
• a typical solution. This response is one we expect to see frequently. However credit must be
given on the basis of the marking instructions.
If a student uses a method which is not explicitly covered by the marking instructions the same
principles of marking should be applied. Credit should be given to any valid methods.
Examiners should seek advice from their senior examiner if in any doubt.
Key to mark types
M
mark is for method
R
mark is for reasoning
A
mark is dependent on M or m marks and is for accuracy
B
mark is independent of M or m marks and is for method and accuracy
E
mark is for explanation
F
follow through from previous incorrect result
Key to mark scheme abbreviations
CAO
correct answer only
CSO
correct solution only
ft
follow through from previous incorrect result
‘their’
indicates that credit can be given from previous incorrect result
AWFW
anything which falls within
AWRT
anything which rounds to
ACF
any correct form
AG
answer given
SC
special case
OE
or equivalent
NMS
no method shown
PI
possibly implied
SCA
substantially correct approach
sf
significant figure(s)
dp
decimal place(s)
3
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2019
Examiners should consistently apply the following general marking principles
No Method Shown
Where the question specifically requires a particular method to be used, we must usually see
evidence of use of this method for any marks to be awarded.
Where the answer can be reasonably obtained without showing working and it is very unlikely
that the correct answer can be obtained by using an incorrect method, we must award full
marks. However, the obvious penalty to candidates showing no working is that incorrect
answers, however close, earn no marks.
Where a question asks the candidate to state or write down a result, no method need be shown
for full marks.
Where the permitted calculator has functions which reasonably allow the solution of the
question directly, the correct answer without working earns full marks, unless it is given to less
than the degree of accuracy accepted in the mark scheme, when it gains no marks.
Otherwise we require evidence of a correct method for any marks to be awarded.
Diagrams
Diagrams that have working on them should be treated like normal responses. If a diagram has
been written on but the correct response is within the answer space, the work within the answer
space should be marked. Working on diagrams that contradicts work within the answer space
is not to be considered as choice but as working, and is not, therefore, penalised.
Work erased or crossed out
Erased or crossed out work that is still legible and has not been replaced should be marked.
Erased or crossed out work that has been replaced can be ignored.
Choice
When a choice of answers and/or methods is given and the student has not clearly indicated
which answer they want to be marked, mark positively, awarding marks for all of the student's
best attempts. Withhold marks for final accuracy and conclusions if there are conflicting
complete answers or when an incorrect solution (or part thereof) is referred to in the final
answer.
4
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2019
AS/A-level Maths/Further Maths assessment objectives
AO
Description
AO1.1a Select routine procedures
AO1
AO1.1b Correctly carry out routine procedures
AO1.2
Accurately recall facts, terminology and definitions
AO2.1
Construct rigorous mathematical arguments (including proofs)
AO2.2a Make deductions
AO2
AO2.2b Make inferences
AO2.3
Assess the validity of mathematical arguments
AO2.4
Explain their reasoning
AO2.5
Use mathematical language and notation correctly
AO3.1a Translate problems in mathematical contexts into mathematical processes
AO3.1b Translate problems in non-mathematical contexts into mathematical processes
AO3.2a Interpret solutions to problems in their original context
AO3.2b Where appropriate, evaluate the accuracy and limitations of solutions to problems
AO3
AO3.3
Translate situations in context into mathematical models
AO3.4
Use mathematical models
AO3.5a Evaluate the outcomes of modelling in context
AO3.5b Recognise the limitations of models
AO3.5c
Where appropriate, explain how to refine models
5
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2019
Q
1
Marking Instructions
Circles correct answer
AO
AO1.1b
Total
Q
2
Marking Instructions
Circles correct answer
AO
AO1.1b
Marking Instructions
Uses formula for confidence
interval with AWRT 1.96 or 1.64 or
1.645
(PI)
Typical Solution
80
1
Total
Q
3(a)
Marks
B1
Marks
B1
Typical Solution
18.9%
1
AO
Marks
AO1.1a
M1
Typical Solution
x±z
σ2
n
= 36 ± 1.96
6
5
= (30.7, 41.3)
Obtains correct confidence interval
AWRT (30.7, 41.3)
Condone poor notation
AO1.1b
A1
3(b)
Infers no as 30 minutes is outside
the confidence interval.
Follow through their confidence
interval
AO2.2b
E1F
The confidence interval does not
support Alan’s claim as 30 minutes
is outside the confidence interval.
3(c)
Explains that their z value would be
replaced by a t value or gives
correct formula
Condone use a t-test rather than a
z-test
Ignore any values given following a
correct statement
Implied by AWRT 1.96 replaced by
AWRT 2.78
AO3.5c
E1
A t distribution will be used instead
of a normal distribution
Total
6
4
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2019
Q
4(a)
Marking Instructions
Forms one correct equation using
E(X) = 3 by using the formulae for
a rectangular distribution or by
first principles
AO
AO3.1a
Marks
M1
Typical Solution
Forms one correct equation using
Var(X) = 3 by using the formulae
for a rectangular distribution or by
first principles
AO1.1a
M1
1
(b − 6 + b) 2 = 3
12
Forms a correct equation just in
terms of a or b (PI)
AO1.1b
b=6
a=0
A1
1
(b − 6 + b) 2 = 3 (OE) or
12
1
(6 − a − a ) 2 = 3 (OE)
12
Find correct values of a and b
AO1.1b
A1
Fully defined and correct
probability density function
Follow through their a and b
AO3.2a
A1F
4(b)(i)
Makes valid criticism of model by
giving a reason why the clothes
line is more or less likely to snap
at particular points
Accept references to clothes on
the line or tension in the line
AO3.5b
E1
4(b)(ii)
Sketch a symmetrical pdf with
maximums consistent with their
criticism in (b)(i)
Their 6 or 6 must be seen
Do not award for pdfs with nonzero values at x > their 6 or 6
Allow a non-symmetrical pdf with
clear maximums if their criticism
in (b)(i) relates to the placement
of clothes on the clothes line
AO3.3
B1F
Total
1
( a + b) = 3
2
1
(b − a ) 2 = 3
12
1
f ( x) = 6
0
0≤ x≤6
otherwise
The clothes line is more likely to
snap in the middle.
7
7
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2019
Q
5(a)
Marking Instructions
Forms an integral with correct
upper limit using
P(X ≤ 200) and set equal to 0.5
(may be implied by later work)
Condone missing dx
AO
AO1.1a
Integrates correctly
Condone missing limits
AO1.1b
Marks
M1
Typical Solution
200
∫
1
k
dx = 0.5
x
[k ln x]1200 = 0.5
M1
k ln 200 = 0.5
k=
Shows substitution of limits and
AO2.1
R1
States the correct integral to find
P(X < 2000) (PI)
Condone missing dx
AO1.1a
M1
Finds correct probability
(AWRT 0.717)
AO1.1b
A1
Explains that the model is
restricted to values from 1 to 2000
Implied by set a = 2000
AO3.5c
E1
Either suggests model with pdf
unchanged for (1,2000) and has
probability 1 – their (b) for 2000
AO3.5c
E1
solves to show that k =
0.5
1
=
ln 200 2 ln 200
1
2 ln 200
Mark awarded if they have a
completely correct solution, which
is clear, easy to follow, uses
correct notation and contains no
slips
5(b)
5(c)
or
Suggests same pdf with a different
or increased value of k or a
different pdf so that
P(X < 2000) = 1
Implied by k = 1/ln 2000 or AWRT
0.132
Total
8
7
1
2 ln 200
2000
∫
1
1
dx = 0.717
x
Set a = 2000 and change the value
of k so that P(X < 2000) = 1
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2019
Q
6(a)
Marking Instructions
States both hypotheses using
correct language
Variables must be included in at
least the null hypothesis
AO
AO2.5
Marks
B1
Constructs correct contingency
table with frequencies shown (PI)
Condone one slip
AO3.3
M1
Finds expected frequencies (PI)
AWRT 3 significant figures
AO3.4
Calculates χ2-test statistic with their
observed and expected
frequencies
Condone no Yates correction used
Condone missing modulus sign
Accept use of their
AO1.1a
212 ( 60 × 30 − 42 × 80 − 0.5 × 212 )
Typical Solution
H0: There is no association
between driving test result and
driving test centre
H1: There is an association
between driving test result and
driving test centre
Observed
A
B
Total
P
60
80
140
F
42
30
72
Expected
A
B
P
67.4
72.6
F
34.6
37.4
Total
102
110
212
M1
M1
ts =
( 60 − 67.4 − 0.5) + ( 42 − 34.6 − 0.5)
2
67.4
34.6
( 80 − 72.6 − 0.5) + ( 30 − 37.4 − 0.5)
2
2
72.6
140 × 72 ×102 ×110
2
+
2
37.4
= 4.0
Calculates χ2-test statistic correctly
AWRT 4.0
AO1.1b
A1
χ2 cv for 1 df = 3.84
4.0 > 3.84
Reject H0
6(b)
Evaluates χ2-test statistic by
comparing their ts with the cv
(AWRT 3.84)
(or p = AWFW 0.045 to 0.047 with
0.05)
AO3.5a
R1
Infers H0 rejected
Follow through their test statistic
AO2.2b
E1F
Concludes in context, based on
their hypotheses
(not definite)
Should be consistent with decision
to accept or reject H0 if stated or ts
(or p value) and cv (or 0.05) if not
AO3.2a
E1F
States that they do not agree with
Rebecca’s claim that it is easier at
centre B giving valid reason or
example of alternative possible
cause
AO3.5b
E1
Total
Some evidence to suggest/support
that driving test result and driving
test centre are not independent
No, may be another underlying
cause for the higher pass rate at B
9
9
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2019
Q
7
Marking Instructions
States both hypotheses using
correct language
AO
AO2.5
Marks
B1
States required assumption to
use a t-test
AO2.4
E1
Typical Solution
H0: µ = 45
H1: µ < 45
Assume that X can be modelled by
a normal distribution
x=
Calculates sample mean
AO1.1b
Calculates sample variance or
sample standard deviation
(AWRT 4.73)
AO1.1b
Calculates the t-test statistic with
their sample mean and variance
or confidence interval (with their t
value) (PI)
Condone absolute value
AO1.1a
B1
B1
M1
246
= 41
6
s2 =
246 2
1
10198 −
6 −1
6
= 22.4
41 − 45
= –2.07
22.4
6
t5 at 95% = 2.015
–2.07 < –2.015
Reject H0
Calculates t-test statistic or
confidence interval correctly or
finds p (AWRT p = 0.0466)
Condone absolute value
AO1.1b
A1
Evaluates t model by comparing
their negative test statistic and
correct critical value (AWRT 2.02) or by comparing p value
with 0.05 or by comparing sample
mean with confidence interval
calculated using correct t value
(AWRT 2.02)
Condone comparing AWRT 2.02
with their positive test statistic
AO3.5a
R1
Infers H0 rejected, follow through
their comparison with consistent
signs
AO2.2b
E1F
Concludes in context based on
their hypotheses
(not definite)
Should be consistent with
decision to accept or reject the H0
if stated or ts (or p value) and cv
(or 0.05) if not
AO3.2a
E1F
Total
10
9
Some evidence to suggest/support
that the shopkeeper is correct that
the mass of chocolate bars is
getting lighter
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3S – JUNE 2019
Q
8(a)(i)
Marking Instructions
Obtains correct probability
AWRT 0.224
AO
AO1.1b
Marks
B1
8(a)(ii)
Selects Poisson model with
λ = 3 × 6 = 18 (PI)
Implied by 0.0059 for P(Y ≥ 30)
AO3.3
B1
Typical Solution
P(X = 2) = 0.224
Y ~ Po(18)
P(Y > 30) = P(Y ≥ 31)
= 0.0033
8(b)
8(c)(i)
Identifies correct probability
P(Y ≥ 31) or 1 – P(Y ≤ 30)
AO1.1a
M1
Obtains correct probability
AWRT 0.0033
AO1.1b
A1
Selects binomial model with n = 6
and p their probability from 8(a)(i)
(PI)
AO3.3
B1
Calculates 0.2242 (1 − 0.224) 4 with
their 0.224
AO1.1a
M1
Obtains correct probability
AWRT 0.273
AO1.1b
A1
Selects exponential or Poisson
model with λ = 3 calls per 10
minutes or equivalent (PI)
AO3.3
B1
C ~ B(6, 0.224)
6
P(C = 2) = 0.224 2 (1 − 0.224) 4
2
= 0.273
T ~ Exp(3)
P(T > 1) = e–3 × 1
= 0.0498
Calculates correct probability,
consistent with their exponential
or Poisson model
Condone confusion between
mean and parameter of
exponential
AO1.1a
M1
Obtains correct probability
AWRT 0.0498
AO1.1b
A1
AO1.2
B1F
8(c)(ii) States correct probability
Follow through their answer to
part 8(c)(i)
Deduces that it is the same
because of the memoryless
property of the exponential
distribution
AO2.2a
Total
E1
0.0498
Due to the memoryless property of
the exponential distribution
probability is unaffected by the
current time since the last call
12
11