Further Mathematics · November 2020 · Mark scheme · Paper 3 Discrete
AQA A Level Further Mathematics mark scheme for Paper 3 Discrete, November 2020 — 7367, file AQA-7367-Paper-3-Discrete-MS-NOV20.pdf.
Text of this paper
A-level
FURTHER MATHEMATICS
7367/3D
Paper 3 Discrete
Mark scheme
June 2020
Version: 1.0 Final Mark Scheme
*206a7367/3D/MS*
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3D – JUNE 2020
Mark schemes are prepared by the Lead Assessment Writer and considered, together with the
relevant questions, by a panel of subject teachers. This mark scheme includes any
amendments made at the standardisation events which all associates participate in and is the
scheme which was used by them in this examination. The standardisation process ensures that
the mark scheme covers the students’ responses to questions and that every associate
understands and applies it in the same correct way. As preparation for standardisation each
associate analyses a number of students’ scripts. Alternative answers not already covered by
the mark scheme are discussed and legislated for. If, after the standardisation process,
associates encounter unusual answers which have not been raised they are required to refer
these to the Lead Examiner.
It must be stressed that a mark scheme is a working document, in many cases further
developed and expanded on the basis of students’ reactions to a particular paper. Assumptions
about future mark schemes on the basis of one year’s document should be avoided; whilst the
guiding principles of assessment remain constant, details will change, depending on the content
of a particular examination paper.
Further copies of this mark scheme are available from aqa.org.uk
Copyright information
AQA retains the copyright on all its publications. However, registered schools/colleges for AQA are permitted to copy material from this booklet for their own
internal use, with the following important exception: AQA cannot give permission to schools/colleges to photocopy any material that is acknowledged to a third
party even for internal use within the centre.
Copyright © 2020 AQA and its licensors. All rights reserved.
2
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3D – JUNE 2020
Mark scheme instructions to examiners
General
The mark scheme for each question shows:
• the marks available for each part of the question
• the total marks available for the question
• marking instructions that indicate when marks should be awarded or withheld including the
principle on which each mark is awarded. Information is included to help the examiner make
his or her judgement and to delineate what is creditworthy from that not worthy of credit
• a typical solution. This response is one we expect to see frequently. However credit must be
given on the basis of the marking instructions.
If a student uses a method which is not explicitly covered by the marking instructions the same
principles of marking should be applied. Credit should be given to any valid methods.
Examiners should seek advice from their senior examiner if in any doubt.
Key to mark types
M
mark is for method
R
mark is for reasoning
A
mark is dependent on M and is for accuracy
B
mark is independent of M and is for method and accuracy
E
mark is for explanation
F
follow through from previous incorrect result
Key to mark scheme abbreviations
CAO
correct answer only
CSO
correct solution only
ft
follow through from previous incorrect result
‘their’
indicates that credit can be given from previous incorrect result
AWFW
anything which falls within
AWRT
anything which rounds to
ACF
any correct form
AG
answer given
SC
special case
OE
or equivalent
NMS
no method shown
PI
possibly implied
sf
significant figure(s)
dp
decimal place(s)
3
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3D – JUNE 2020
Examiners should consistently apply the following general marking principles:
No Method Shown
Where the question specifically requires a particular method to be used, we must usually see
evidence of use of this method for any marks to be awarded.
Where the answer can be reasonably obtained without showing working and it is very unlikely
that the correct answer can be obtained by using an incorrect method, we must award full
marks. However, the obvious penalty to candidates showing no working is that incorrect
answers, however close, earn no marks.
Where a question asks the candidate to state or write down a result, no method need be shown
for full marks.
Where the permitted calculator has functions which reasonably allow the solution of the
question directly, the correct answer without working earns full marks, unless it is given to less
than the degree of accuracy accepted in the mark scheme, when it gains no marks.
Otherwise we require evidence of a correct method for any marks to be awarded.
Diagrams
Diagrams that have working on them should be treated like normal responses. If a diagram has
been written on but the correct response is within the answer space, the work within the answer
space should be marked. Working on diagrams that contradicts work within the answer space
is not to be considered as choice but as working, and is not, therefore, penalised.
Work erased or crossed out
Erased or crossed out work that is still legible and has not been replaced should be marked.
Erased or crossed out work that has been replaced can be ignored.
Choice
When a choice of answers and/or methods is given and the student has not clearly indicated
which answer they want to be marked, mark positively, awarding marks for all of the student's
best attempts. Withhold marks for final accuracy and conclusions if there are conflicting
complete answers or when an incorrect solution (or part thereof) is referred to in the final
answer.
4
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3D – JUNE 2020
AS/A-level Maths/Further Maths assessment objectives
AO
Description
AO1.1a Select routine procedures
AO1
AO1.1b Correctly carry out routine procedures
AO1.2
Accurately recall facts, terminology and definitions
AO2.1
Construct rigorous mathematical arguments (including proofs)
AO2.2a Make deductions
AO2
AO2.2b Make inferences
AO2.3
Assess the validity of mathematical arguments
AO2.4
Explain their reasoning
AO2.5
Use mathematical language and notation correctly
AO3.1a Translate problems in mathematical contexts into mathematical processes
AO3.1b Translate problems in non-mathematical contexts into mathematical processes
AO3.2a Interpret solutions to problems in their original context
AO3.2b Where appropriate, evaluate the accuracy and limitations of solutions to problems
AO3
AO3.3
Translate situations in context into mathematical models
AO3.4
Use mathematical models
AO3.5a Evaluate the outcomes of modelling in context
AO3.5b Recognise the limitations of models
AO3.5c
Where appropriate, explain how to refine models
5
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3D – JUNE 2020
Q
Marking instructions
AO
Marks
1
Ticks correct box
1.1b
B1
Total
Marking instructions
AO
Marks
2
Ticks correct box
1.2
B1
6
Supersource: V, X
Supersink: U, W
1
Q
Total
Typical solution
1
Typical solution
Matrix multiplication is associative
but not commutative
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3D – JUNE 2020
Q
3(a)(i)
Marking instructions
AO
Marks
Models the situation as that of
finding a spanning tree by listing
or drawing five labelled arcs
(PI).
(Condone E for Education etc)
3.3
M1
Uses the model and correctly
finds at least four arcs of the
minimum spanning tree.
3(a)(ii)
3(b)
3.4
M1
Typical solution
Education to Refuge Collection: 13
Education to Social Care: 16
Refuge Collection to Transport: 17
Payroll to Social Care: 20
Housing to Social Care: 22
88 m
Correctly finds the total
minimum length of cable
required (PI by £704).
1.1b
A1
Translates their total minimum
length of cable into the total
minimum cost.
Must include unit.
3.2a
A1F
Suggests a plausible reason in
the context of the question as to
why the total cost of installing
the network to the council will be
different from the installation
cost of the cable from part (a)(i).
2.4
E1
Explains correctly that the
Education Office is not directly
connected to the Transport
Office in their minimum
spanning tree.
2.4
M1
Deduces correctly that the cost
of installing the network does
not change.
Total
2.2a
A1
Total cost = 8 × 88
= £704
The cost is likely to be higher than
£704 as the council may also need
to buy telephones for the internal
network.
The Education Office is not directly
connected to the Transport Office
in the minimum spanning tree, so
the total minimum length of cable
required does not change.
Hence, the cost of installing the
cable does not change.
7
7
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3D – JUNE 2020
Q
4(a)
Marking instructions
AO
Marks
Typical solution
Finds the correct Hamiltonian
cycle starting at the depot using
the nearest neighbour algorithm
(Condone missing return to
Depot).
3.1a
M1
Depot–C–A–F–B–E–D–Depot
(15 + 20 + 21 + 14 + 16 + 34 + 16)
= 136
Correctly obtains the upper
bound on L.
4(b)
4(c)
1.1b
A1
Correctly determines a minimum
spanning tree connecting A, B,
C, D, E and F (PI by 95).
1.1b
B1
Correctly identifies the two arcs
with the lowest weights that are
connected to the depot (PI by 31
or by 15 & 16).
1.1a
M1
Correctly finds a lower bound for
L by finding the sum of their
spanning tree and the two
correct lowest weight arcs.
1.1b
A1F
Infers that Joe’s minimum total
distance is an upper bound
which might be possible to
improve upon
2.2b
or
B1F
Infers that Joe’s claim may be
correct but more information is
needed to prove or disprove the
claim.
Total
8
6
MST with the depot removed:
A – C: 20
A – F: 21
B – F: 14
B – E: 16
D – F: 24
= 95
Two arcs with lowest weight
connected to the depot are:
Depot – C: 15
Depot – D: 16
= 31
Hence, the lower bound for L is
126
Joe’s claim may be correct, but
without further study we can only
say that the upper bound for L is
134 miles.
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3D – JUNE 2020
Q
5(a)
Marking instructions
AO
Marks
Uses Euler’s formula for
connected planar graphs
P has 8 vertices and 13 edges.
or
1.1a
M1
Redraws the graph correctly
with no edges crossing (PI).
5(b)
Typical solution
f=7
Determines correctly that the
graph P has 7 faces.
1.1b
A1
Explains the condition that must
be met for a graph to be semiEulerian.
2.4
M1
Uses their explanation to assess
the validity of Akwasi’s claim
with direct reference to graph P,
concluding that his claim is
incorrect.
Total
Hence, v – e + f = 2
8 – 13 + f = 2
2.3
A1
Therefore, P has 7 faces.
For a graph to be semi-Eulerian it
must have exactly two vertices
which have an odd degree.
As P has six odd degree vertices,
therefore P is not semi-Eulerian
and Akwasi’s claim is incorrect.
4
9
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3D – JUNE 2020
Q
Marking instructions
AO
Marks
6(a)(i)
States the correct order of G.
1.1b
B1
6(a)(ii)
Multiplies qr with qr and uses
the given rule to rewrite either of
the qr
or
Typical solution
6
qr ▲ qr = qr ▲ r2q
= q▲ r ▲ r2▲ q
1.1a
M1
Multiplies qr with an unknown
element x and equates to e
= q▲ e ▲ q
=q▲q
=e
Uses the given rules
for r3 or q2
or
As qr ▲ qr = e, the inverse of qr is
qr
1.1b
A1
2.1
R1
Uses the given rules to obtain
xq = r2 or rx = q
Constructs a rigorous
mathematical proof, including
the explicit use of the identity
element of the group and its
properties, and provides a
concluding statement that the
inverse of qr is qr
(Condone not using ▲).
10
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3D – JUNE 2020
6(b)
Correctly finds at least two
missing entries in the Cayley
table.
1.1b
B1
Correctly finds at least six
missing entries in the Cayley
table.
1.1b
B1
Correctly finds all missing
entries in the Cayley table.
1.1b
B1
▲
e
r
r2
q
qr
qr2
e
e
r
r2
q
qr
qr2
r
r
r2
e
qr2
q
qr
r2
r2
e
r
qr
qr2
q
q
q
qr
qr2
e
r
r2
qr
qr
qr2
q
r2
e
r
qr2
qr2
q
qr
r
r2
e
.
6(c)
States the correct name of a
group which G is isomorphic to.
(Accept reflections and rotations
instead of symmetry)
(Accept dihedral group)
(Condone missing ‘equilateral’)
Total
2.5
B1
G is isomorphic to the symmetry
group of the equilateral triangle.
8
11
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3D – JUNE 2020
Q
7(a)
Marking instructions
Models the problem as a linear
programming problem by
introducing two variables,
defining at least one of them as
‘number of’.
AO
3.3
Marks
B1
Typical solution
x = number of brake kits made
y = number of clutch kits made
5x + 3y ≤ 2500
500x + 200y ≤ 200 000
Uses their model to write down
an inequality for the time taken
to make the kits or the cost to
the engineering company
(Condone equalities).
12
3.4
M1
x ≥ 100, y ≥ 100
P = 2000x + 1000y
P is maximised at (200, 500)
Uses their model to write down
two correct inequalities for the
time taken to make the kits and
the cost to the engineering
company.
1.1b
A1
Writes down two inequalities to
ensure their variables are each
greater than or equal to 100
(PI by graph)
3.1b
M1
Correctly plots the lines
x = 100 and y = 100
1.1b
A1
Correctly plots the lines
5x + 3y = 2500
and 5x + 2y = 2000
1.1b
B1
Deduces their feasible region
and shows it by labelling or
shading on the graph.
2.2a
B1
States an objective function or
draws an objective line and
clearly states the solution to the
problem in the context of the
question (CAO).
(Condone no reference to ‘each
month’)
3.2a
R1
To maximise profit, the engineering
company should make 200 brake
kits and 500 clutch kits each
month.
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3D – JUNE 2020
7(b)
7(c)
Recognises a limitation of the
model by giving a plausible
reason in the context of the
problem as to why the
engineering company may not
be able to make the optimal
number of each kit.
3.5b
E1
Explains that neither of the
conditions requiring at least 100
of each kit be made is active in
the solution in part (a).
2.4
M1
Deduces that removing these
conditions has no effect on the
maximum profit.
2.2a
A1
Total
The total time available to work on
making the kits may be less than
2500 hours as, for instance, some
workers may be ill on some days
and not available to work on
making the kits.
The optimal vertex does not occur
at (100, …) or (…, 100), so
removing this condition does not
change the maximum profit the
engineering company can make.
11
13
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3D – JUNE 2020
Q
8(a)(i)
8(a)(ii)
8(b)(i)
Marking instructions
AO
Marks
Finds four or more correct row
minima/col maxima.
3.1a
M1
row minima = (–1, 1)
col maxima = (3, 3, 4)
max(row minima) = 1
min(col maxima) = 3
Correctly finds all
row minima/col maxima and
states the max(row minima) and
min(col maxima).
1.1b
A1
Reasons correctly that as the
max(row minima) is not equal to
the min(col maxima) then a
stable solution does not exist.
3.2a
R1
States the correct interval for the
value of the game for Daryl
based on their max(row minima)
and min(col maxima).
(Condone weak inequalities)
3.2a
B1F
1<V<3
M1
When Clare plays strategy X, the
expected gain for Daryl is
Formulates an unsimplified
expected gain for Daryl when
Clare plays strategy X
Uses the identity
sin2θ + cos2θ ≡ 1 and all
necessary steps with no errors
or omissions to show 3 – 4sin2θ
14
Typical solution
3.1a
As max(row minima) = 1 ≠ 3 =
min(col maxima), then a stable
solution does not exist.
Gain = –1 × sin2θ + 3 × cos2θ
= –sin2θ + 3cos2θ
1.1b
A1
= –sin2θ + 3(1 – sin2θ)
= 3 – 4sin2θ
MARK SCHEME – A-LEVEL FURTHER MATHEMATICS – 7367/3D – JUNE 2020
8(b)(ii)
8(b)(iii)
8(c)
Finds the correct gain for Daryl,
2 + sin2θ, when Clare plays
strategy Y.
Finds the correct gain for Daryl,
1 + 3sin2θ, when Clare plays
strategy Z.
1.1b
B1
1.1b
B1
3.1a
M1
Identifies the correct optimal
point of intersection from the
graph.
1.1b
A1
Forms an equation in sin2θ using
using the correct expected gains
for X and Z.
1.1a
M1
When Clare plays strategy Y, the
expected gain for Daryl is
Gain = 3 × sin2θ + 2 × cos2θ
= 2 + sin2θ
When Clare plays strategy Z, the
expected gain for Daryl is
Gain = 4 × sin2θ + 1 × cos2θ
= 1 + 3sin2θ
Constructs a graph with at least
one vertical axis and plots two
expected gains correctly
or
Forms an equation in sin2θ using
using any two of the three
expected gains.
3 – 4sin2θ = 1 + 3sin2θ
2 = 7sin2θ
2
7
Obtains the correct value for θ
to 3 significant figures (CSO).
1.1b
A1
= sin2θ
2
𝜃𝜃 = sin–1 �� �
7
θ = 32.3o
Total
12
15