Further Mathematics · June 2022 · Mark scheme · Paper 3D
Edexcel A Level Further Mathematics mark scheme for Paper 3D, June 2022 — 9FM0/3D, file 9fm0-3d-rms-20220818.pdf.
Text of this paper
Mark Scheme (Results)
Summer 2022
Pearson Edexcel GCE
AL Further Mathematics (9FM0)
Paper 3D Decision Mathematics 1
Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding body. We provide a
wide range of qualifications including academic, vocational, occupational and specific programmes for
employers. For further information visit our qualifications websites at www.edexcel.com or
www.btec.co.uk. Alternatively, you can get in touch with us using the details on our contact us page at
www.edexcel.com/contactus.
Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help everyone progress in their
lives through education. We believe in every kind of learning, for all kinds of people, wherever they are in
the world. We’ve been involved in education for over 150 years, and by working across 70 countries, in
100 languages, we have built an international reputation for our commitment to high standards and
raising achievement through innovation in education. Find out more about how we can help you and your
students at: www.pearson.com/uk
June 2022
Publications Code 9FM0_3D_2206_MS
All the material in this publication is copyright
© Pearson Education Ltd 2022
General Marking Guidance
• All candidates must receive the same treatment. Examiners must mark the first candidate
in exactly the same way as they mark the last.
• Mark schemes should be applied positively. Candidates must be rewarded for what they
have shown they can do rather than penalised for omissions.
• Examiners should mark according to the mark scheme not according to their perception of
where the grade boundaries may lie.
• There is no ceiling on achievement. All marks on the mark scheme should be used
appropriately.
• All the marks on the mark scheme are designed to be awarded. Examiners should always
award full marks if deserved, i.e. if the answer matches the mark scheme. Examiners should
also be prepared to award zero marks if the candidate’s response is not worthy of credit
according to the mark scheme.
• Where some judgement is required, mark schemes will provide the principles by which
marks will be awarded and exemplification may be limited.
• When examiners are in doubt regarding the application of the mark scheme to a
candidate’s response, the team leader must be consulted.
• Crossed out work should be marked UNLESS the candidate has replaced it with an
alternative response.
PEARSON EDEXCEL GCE MATHEMATICS
General Instructions for Marking
1. The total number of marks for the paper is 75.
2. These mark schemes use the following types of marks:
•
•
•
M marks: Method marks are awarded for ‘knowing a method and attempting to
apply it’, unless otherwise indicated.
A marks: Accuracy marks can only be awarded if the relevant method (M) marks have
been earned.
B marks are unconditional accuracy marks (independent of M marks)
Marks should not be subdivided.
3. Abbreviations
These are some of the traditional marking abbreviations that will appear in the mark
schemes.
•
bod – benefit of doubt
•
ft – follow through
•
the symbol
•
cao – correct answer only
•
cso - correct solution only. There must be no errors in this part of the question to
obtain this mark
•
isw – ignore subsequent working
•
awrt – answers which round to
•
SC: special case
•
o.e. – or equivalent (and appropriate)
•
d or dep – dependent
•
indep – independent
•
dp decimal places
•
sf significant figures
•
The answer is printed on the paper or ag- answer given
will be used for correct ft
4. All M marks are follow through.
A marks are ‘correct answer only’ (cao.), unless shown, for example, as A1 ft to indicate
that previous wrong working is to be followed through. After a misread however, the
subsequent A marks affected are treated as A ft, but answers that don’t logically make sense e.g.
if an answer given for a probability is >1 or <0, should never be awarded A marks.
be awarded A marks.
5. For misreading which does not alter the character of a question or materially simplify it,
deduct
two from any A or B marks gained, in that part of the question affected.
6. Where a candidate has made multiple responses and indicates which response they wish to
submit, examiners should mark this response. If there are several attempts at a question which
have not been crossed out, examiners should mark the final answer which is the answer that is
the most complete.
7. Ignore wrong working or incorrect statements following a correct answer.
8. Mark schemes will firstly show the solution judged to be the most common response
expected
from candidates. Where appropriate, alternatives answers are provided in the notes. If examiners
are not sure if an answer is acceptable, they will check the mark scheme to see if an alternative
answer is given for the method used. If no such alternative answer is provided but the response is
deemed to be valid, examiners must escalate the response for a senior examiner to review.
Question
1(a)
Scheme
4.3 + 6.1 + ... + 1.3 37.5
=
= 3.75
10
10
so lower bound is four (balls of string)
Marks
AOs
M1
A1
1.1b
2.2a
(2)
(b)
Bin 1:
Bin 2:
Bin 3:
Bin 4:
4.3
6.1
4.7
5.9
5.1 0.4
2.5 1.3
3.4 1.7
2.1
M1
A1
A1
1.1b
1.1b
1.1b
(3)
(5 marks)
Notes for Question 1
a1M1: Attempt to find the lower bound ( 37.5 6.1) /10 (a value of 3.75 seen with no working can
imply this mark)
a1A1: cso – a lower bound of 4 with either a correct calculation seen or 3.75 or ‘total is 37.5 and if
each ball contains 10 this gives a lower bound of 4’. An answer of 4 with no working (or from part
(b)) scores M0A0. Any incorrect working loses this mark e.g. a correct calculation followed by an
incorrect value followed by 4 is A0
b1M1: First four items placed correctly and at least eight items placed in bins – condone cumulative
totals for M1 only (the boxed values)
b1A1: First eight items placed correctly (the boxed and bold values), and all eleven correct values
only placed in bins (so no additional/repeated values)
b2A1: cso (no additional/repeated values)
Condone working in cm provided consistent
No MR in this question – mark according to the scheme
Question
Scheme
Marks
AOs
M1
1.1b
A1
1.1b
A1
1.1b
A1ft
1.1b
A1
A1ft
2.2a
2.2a
2(a)
(i)
(ii)
(iii)
Path from A to K: ABEHGK
Length of shortest path from A to K is 59 (km)
(6)
(b)(i)
Repeated edges: AB, BE, EH
(b)(ii)
Length of route = 299 + 28 = 327 (km)
B1
2.2a
B1ft
2.2a
(2)
(c)
Route must start at A and finish at K therefore need to consider
pairings of the nodes D, E, H and K
M1
3.1b
D(AB)E + H(G)K = 26 + 31 = 57
D(FG)H + E(HG)K = 30 + 47 = 77
D(FG)K + EH = 49 + 16 = 65
A1
A1
A1
1.1b
1.1b
1.1b
Length of new route = 299 + 57 = 356 (km)
A1
2.2a
(5)
(13 marks)
Notes for Question 2
In (a) it is important that all values at each node are checked very carefully – the order of the
working values must be correct for the corresponding A mark to be awarded, for example at F
the working values must be 29 28 25 in that order (so 29 25 28 is incorrect)
It is also important that the order of labelling is checked carefully – some candidates start with
a 0 label at A (rather than 1) – which is fine. Also the order of labelling must be a strictly
increasing sequence – so 1, 2, 3, 3, 4,… will be penalised once (see notes below) but 1, 2, 3, 5,
6,… is fine. Errors in the final values and working values are penalised before errors in the
order of labelling. Condone crossed out working values if they are still legible
a1M1: A larger value replaced by a smaller value in at least two different Working Value boxes at
either C or F or G or H or J or K
a1A1: All values at A, B, E, D and C correct. Condone lack of 0 in A’s working value
a2A1: All values at F, H and G correct and the working values in the correct order. Penalise order of
labelling only once per question (F, H and G must be labelled in that order and F must be labelled
after A, B, E, D and C)
a3A1ft: All values in J and K correct on the follow through and the working values in the correct
order. To follow through J check that the working values at J follow from the candidate’s final
values for the nodes that are directly attached to J (which are G and H). For example, if correct then
the order of labelling of nodes G and H are 8 and 7 respectively so the working values at J should
come from H and G in that order. The first working value at J should be their 28 (the Final value at
H) + 23 (the weight of the arc HJ), the second working value at J should be their 34 (the Final value
at G) + 10 (the weight of the arc GJ). Repeat the process for K (which will have working values
from G and H with the order of these nodes determined by the candidate’s order of labelling at G
and H)
a4A1: cao (correct path from A to K – ABEHGK). Do not accept KGHEBA. Condone the length of
the shortest path and the path interchanged on the answer lines in the answer book. Allow the paths
written in terms of arcs, e.g. AB, BE, EH, HG, GK
a5A1ft: ft their final value at K only (if 59 stated and 59 is not the final value at K then A0)
bi1B1: cao (AB, BE, EH only but in any order) – must be stated as edges so B0 for ABEH
bii1B1ft: 327 or follow through their final value at H from (a) + 299
c1M1: The correct three pairings of the correct four nodes (D, E, H and K)
c1A1: One row correct including pairing and total
c2A1: Two rows correct including pairings and totals
c3A1: All three rows correct including pairings and totals
c4A1: cao (356) – dependent on all previous marks in this part
Condone lack of units throughout
Question
Scheme
Marks
AOs
M1
1.1b
A1
1.1b
3(a)
(2)
(b)
Third iteration:
A
B
C
D
E
F
A
12
29
24
41
11
B
12
17
21
29
23
C
29
17
4
12
40
D
20
8
4
16
13
E
29
29
12
16
12
F
11
23
40
13
12
-
A
12
28
24
40
11
B
12
17
21
29
23
C
24
12
4
12
17
D
20
8
4
16
13
E
29
24
12
16
12
F
11
21
17
13
12
-
M1
1.1b
A1
1.1b
M1
1.1b
A1
1.1b
Fourth iteration:
A
B
C
D
E
F
(4)
(c)
Nearest neighbour routes:
E–C–D–F–A–B–E
Length = 76
E–F–A–B–D–C–E
Length = 59
The cycle that begins E – F –… is the better upper bound as the value
is the smaller of the two
M1
A1
A1
A1
3.4
1.1b
1.1b
2.4
(4)
(10 marks)
Notes for Question 3
a1M1: Correct five arcs from A
a1A1: cao no additional arcs or arrows, correct weights and arc AE directed from A to E
In the distance matrix for part (b) ignore whatever is written in the lead diagonal (top left to bottom
right) and just consider the values (ignore shading etc.) – check bottom of page 9 for replaced
matrices
b1M1: No change in the third row and third column with at least two values reduced correctly (no
blank entries – apart from the lead diagonal)
b1A1: cao for the third iteration
b2M1: No change in their fourth row and fourth column (following their third iteration) with at least
two values correctly reduced follow through from their previous iteration (no blank entries – apart
from the lead diagonal)
b2A1: cso for both iterations (no follow through from an incorrect third iteration even if the fourth
iteration is ‘correct’ so M1A0M1A1 is not possible in this part)
c1M1: Either cycle correct (must include returning to E) – nodes must be in the correct order and
therefore not reversed but allow if stated in terms of arcs. If only one cycle correct then M1 only
c1A1: Both cycles correct – nodes must be in the correct order but allow if stated in terms of arcs
c2A1: Both cycles and corresponding lengths correct
c3A1: Correct reasoning that the smallest (oe) value is the better upper bound – dependent on all
previous marks in this part (cso)
Question
4(a)
Scheme
Constraints:
2 x + 3 y + 4 z „ 13
x − 2 y + 2 z …8
3x − 4 z …12
Marks
AOs
B1
B1
3.4
2.5
M1
A1
3.1a
2.2a
( x, y, z …0 )
Objective functions:
Maximise −2 x + 3 y + z
Minimise 2 x − 3 y − z
(4)
(b)
(Because M is big) the only negative in the objective row is the
2 − 4M so the pivot is from the x-column
The 3 in the a2 row is the pivot as
12
13
8
is less than both and
1
2
3
B1
2.4
B1
2.2a
(2)
(6 marks)
Notes for Question 4
a1B1: One correct non-trivial inequality (allow strict inequality provided direction of inequality sign
is correct) – equations with slack variables etc. scores no marks unless replaced with correct
inequalities
a2B1: All three non-trivial inequalities correct
a1M1: Either expression stated correctly (allow equal to (or an inequality with) any letter e.g.
P = −2 x + 3 y + z but not equal to a value e.g. = 0) – ignore any mention of maximum/minimum for
this mark
a1A1: Both expressions correct including max/min correctly matched with each expression (allow
equal to any letter only) – do not isw if they continue and place their expression(s) equal to a
value(s)
b1B1: Correct reasoning that the pivot is a value from the x-column – as a minimum must state that
the 2 – 4M is the only negative (condone most negative) in the objective row (allow profit row or
P row, condone ‘bottom row’)
b2B1: Correct justification of why the 3 in the a2 row or the 3 in the x column is the pivot – so must
state the correct pivot in a clear unambiguous way (so just saying the pivot is ‘the 3’ is B0) and
12
13
8
comparing or stating that
or 4 is less than/least positive for both or 8 and
or 6.5 – must see
1
2
3
all three values so do check the table for possibly stating the values there. However, just stating
that the 3 is the pivot because it is the smallest value (without seeing anywhere these values) is
B0
Question
Scheme
Activity
A
B
C
D
E
5(a)
IPA
A
C
Activity
F
G
H
J
K
IPA
C
A, B, E
A, B, E
D, G
D, F, G, H
Marks
AOs
B1
1.1b
B1
1.1b
(2)
(b)
(m =) 9
B1
2.2a
(1)
(i)
(c)
(ii) C, E, H and K must be critical
M1
1.1b
A1
1.1b
B1
2.2a
(3)
(d)
Total float for activity G is 15 – 11 – 3 = 1
B1
(1)
2.2a
Activity
A
B
C
D
E
(e)
Workers
3
2
1
2
2
Activity
F
G
H
J
K
Workers
1
2
2
1
3
B1
1.1b
B1
1.1b
(2)
(f)
x=6
B1
3.1b
M1
2.1
A1
1.1b
A1
1.1b
A1
1.1b
(5)
(14 marks)
Notes for Question 5
a1B1: Four correct rows (not including the rows for A, B and C)
a2B1: All rows correct (accept blanks or dashes (etc.) for A, B and C but any letters placed in these
three rows scores B0)
b1B1: cao for the value of m – allow 4 < x „ 9 or x „ 9 but not x = 9 or m „ 9 unless stating the
correct value too
ci1M1: Any four of the bottom boxes completed correctly
ci1A1: cao – all bottom boxes completed correctly. The 15 – x must be seen to award this mark (but
may be crossed out). Condone this correct expression being replaced with their value of 15 – x
ONLY if their value of x is explicitly stated either here or later in their solution
cii1B1: cao (C, E, H and K only)
d1B1: cao – a correct answer with no working (or no incorrect working) can imply this mark
e1B1: Any six values correct
e2B1: cao
f1B1: cao for the value of x (seen or implied, e.g., duration of D and F both correct so therefore
must be consistent)
f1M1: Cascade chart with at least 8 activities labelled and at least four activities having non-zero
float. A scheduling diagram (so a diagram in which no floats are evident) scores M0
f1A1: Critical activities (C, E, H and K) correct
f2A1: Activities B, G and J correct
f3A1: Activities A, D and F correct
For (f) the following may be useful in checking their cascade chart provided the float is shown after
the corresponding activity:
Activity
A
B
C
D
Duration +
Float
0 to 4
F: 4 to 9
0 to 5
F: 5 to 11
0 to 7
Critical
4 to 10
F: 10 to 15
Activity
E
F
G
H
Duration +
Float
7 to 11
Critical
7 to 13
F: 13 to 16
11 to 14
F: 14 to 15
11 to 16
Critical
Activity
J
K
Duration +
Float
14 to 21
F: 21 to 22
16 to 22
Critical
Qu
Scheme
n
a
b
c
5
1
3
3
2
2
8
3
1
13
4
0
16
6(a)
Output: 16
Marks
AOs
M1
1.1b
A1
1.1b
A1
2.2a
(3)
17
21
24
14
23
13
15
19
28
20
(i)
17
17
14
14
13
13
21
14
17
13
14
14
14
21
13
15
15
15
23
13
15
17
17
17
13
15
19
19
19
19
15
19
21
20
20
20
19
23
20
21
21
21
24
20
23
23
23
23
20
24
24
24
24
24
28
28
28
28
28
28
(b)
Total number of comparisons: 9 + 8 + 7 + 6 + 5 + 4 = 39
(b)
M1
A1
A1ft
A1
1.1b
1.1b
1.1b
1.1b
B1
2.2a
(ii)
(5)
(c)
45
B1
2.2a
(1)
(d)
e.g. when n = 3 the total number of comparisons is 3
therefore (3)(3 - 1)(3 + 1)(3 - 2) = 3
e.g. when n = 5 the total number of comparisons is 45 (from (c))
therefore (5)(5 - 1)(5 + 1)(5 - 2) = 45
For K50 total number of comparisons is ' '(50)(50 - 1)(50 + 1)(50 - 2)
749 700
M1
3.1a
dM1
3.4
A1
2.2a
(3)
(12 marks)
Notes for Question 6
a1M1: At least three rows of cells completed with a correct first row – condone repeated values in
all columns or a single value in each row
a1A1: cao – the values in the second and third rows correct
a2A1: cao – correct output following a correct fourth row (with no extra rows) – the output must
either be stated on the given answer line or ‘output 16’ must be clearly written somewhere near the
table (do not bod the 16 circled, underlined, written twice, etc.)
bi1M1: Bubble sort. Consistent direction, end number (28) in place, the list containing ten numbers
with the list beginning with the correct first five numbers (17 21 14 23 13). Do check these
carefully as some candidates show the result of each comparison and swap in their first pass.
Consider the placement of the candidate’s numbers, rather than what the candidate labels each line
of their pass. For example, assume that the first time that the 28 appears at the end of the list is the
end of their first pass
bi1A1: Second and third passes correct – so end three numbers in place
bi2A1ft: Fourth and fifth passes correct following through from the candidate’s third pass – so end
five numbers in place. After their third pass their list must contain the correct 10 numbers
bi3A1: cso (correct solution only – so previous three marks must have been awarded in this part).
Must show a 6th pass showing no swaps/changes (give bod if the passes are not labelled but do not
award this mark if it is clear that after the 5th pass the list is simply being written out again (rather
than a genuine 6th pass taking place)). Condone if the sort continues until a 9th pass has been
completed (but there must be no changes in the 6th to 9th passes)
bii1B1: cao (for total number of comparisons)
In (b) starting at the right-hand end of the list is M0. Quick sort (or any other sorting algorithm e.g.
shuttle) is M0. No misreads in this part – mark exactly to the scheme.
If sorting into descending order, then award M1 for 21 24 17 23 14 15 19 28 20 13 and the
first A1 for both 24 21 23 17 15 19 28 20 14 13 and 24 23 21 17 19 28 20 15 14 13
ONLY (so two out of the first four marks) even if the list is re-ordered after the sort is complete
c1B1: cao (45)
d1M1: Considering the total number of comparisons for any positive integer value of n (greater
1
than 2) and substitute into the given expression (if correct = ). The correct value of implies
8
this mark. If using n = 5 then follow through their value from (c). If any other value of n used, then
the maximum number of comparisons must be correct e.g.
n
3
4
5
6
7
8
9
10
Comparisons
3
15
45
105
210
378
630
990
d2dM1: Using their and n = 50 to calculate the maximum total number of comparisons
1
(dependent on the previous M mark). Writing (50)(50 − 1)(50 + 1)(50 − 2) implies the first two M
8
marks
d1A1: cao (749 700) – no marks for the correct answer with no working
Alternative solution to (d) for those who are clearly using an algebraic method to derive the
quartic expression for the maximum total number of comparisons:
If there are N values then
1st pass of bubble sort requires N – 1 comparisons
2nd pass of bubble sort requires N – 2 comparisons
3rd pass of bubble sort requires N – 3 comparisons and so on
N −1
Therefore, the total number of comparisons is
1
r = 2 ( N − 1) N
M1
r =1
Maximum number of comparisons in Kn is therefore
11
1
n ( n − 1) − 1 n ( n − 1)
22
2
1
= n ( n − 1) n ( n − 1) − 2
8
1
1
1
= n ( n − 1) ( n 2 − n − 2 ) = n ( n − 1)( n − 2 )( n + 1) so k =
8
8
8
Therefore, maximum number of comparisons for K50 is 749 700
dM1
A1
M1: Considering the total number of comparisons that are required to sort a list containing N values
1
(possibly will see 1 + 2 + 3 +…+ (n – 1)) and using the standard series result that r = n(n + 1) to
2
get the correct quadratic expression for the total number of comparisons when sorting N values
(allow any letter)
dM1: Dependent on previous M mark – substituting the correct quadratic expression into the correct
1
quadratic expression with correct algebraic working leading to n ( n − 1)( n − 2 )( n + 1)
8
A1: Correct answer of 749 700
Qu
7
(a)
Scheme
Marks
AOs
M1
A1
3.4
1.1b
B1
1.1b
M1
3.3
A1
2.2a
x + y „ 8 x + y + s1 = 8
x + 2 y „ 12 x + 2 y + s2 = 12
7 x + 2 y „ 46 7 x + 2 y + s3 = 46
y „ 2 x + 1 −2 x + y + s4 = 1
P = x + ky P − x − ky = 0
e.g.
b.v.
x
y
s1
s2
s3
s4
Value
s1
1
1
1
0
0
0
8
s2
1
2
0
1
0
0
12
s3
7
2
0
0
1
0
46
s4
−2
1
0
0
0
1
1
P
−1
−k
0
0
0
0
0
(5)
(b)
x = 2, y = 5, s1 = 1, s2 = 0, s3 = 22, s4 = 0 (P = 5k + 2)
B1
3.4
(1)
B1
1.1b
M1
2.1
A1
1.1b
A1
1.1b
B1
2.4
Optimal value of P is 4k + 4 (at x = y = 4)
M1
3.4
2 1
Second iteration not optimal − + k 0 k 2
5 5
B1
3.1a
dM1
3.4
A1
2.2a
(c)
b.v.
x
y
s1
s2
s3
s4
Value
Row Ops
s4
0
0
5
−3
0
1
5
5r1
x
1
0
2
−1
0
0
4
r2 + 0.4R1
s3
0
0
−12
5
1
0
10
r3 – 2.4R1
y
0
1
−1
1
0
0
4
r4 – 0.2R1
P
0
0
2−k
k −1
0
0
4k + 4
r5 − ( 0.2k − 0.4 ) R1
Third iteration optimal 2 − k …0 and k − 1 …0 ( k …1)
1 „ k 2 8 „ P 12
(9)
(15 marks)
Notes for Question 7
a1M1: Correctly re-writing any two inequalities as equations with slack variables (can be implied by
two correct rows in the Simplex tableau ignoring b.v. column). Or correctly stating all four
constraints as inequalities
a1A1: Correctly re-writing all inequalities as equations with slack variables (can be implied by the
four correct constraint rows in the Simplex tableau ignoring b.v. column)
a1B1: Correctly re-writes objective function (can be implied by correct row in tableau)
a2M1: Any two rows correct including consistent b.v. column entries or any three rows correct
(ignoring b.v. column)
a2A1: cao (including consistent b.v. column) – note that the candidate’s order in which the rows
appear in the tableau (and choice of letter to represent the slack variable) may be different. A
correct tableau implies full marks in this part
b1B1: cao for x, y, s1 , s2 , s3 and s4 only (ignore any mention of P)
c1B1: Pivot row completely correct including change of b.v.
c1M1: All values in one of the non-pivot rows correct (so ignore b.v. column and ‘Row Ops’
column) or one of the ‘non zero and one’ columns (which are s1 , s2 or Value) correct (must have
pivoted on the correct value)
c1A1: Row operations used correctly at least twice, i.e. two of the ‘non zero and one’ columns
( s1 , s2 or Value) correct
c2A1: cao all values including b.v. column – ignore ‘Row Ops’ column for this mark
c2B1: Correct row operations stated
(alternatives row operations are 5r1; r2 + 2r1; r3 – 12r1; r4 – r1; r5 – (k – 2)r1)
c2M1: Their optimal value (as a linear expression in k) stated correctly following their third iteration
(must have pivoted on a positive value from the s4 column and completed the bottom row of the
tableau). Condone this expression (4k + 4 if correct) being stated as part of an equation/inequality
(or as part of their final answer) – sight of this expression (but must be seen outside of the tableau)
scores this mark
2 1
c3B1: Correctly inferring that k < 2 either from − + k 0 or from 4k + 4 > 5k + 2 – just stating
5 5
k < 2 without it being clear where this comes from is B0
c3dM1: Considering (at least) two of their linear expressions in k from their objective row (not
including the Value column) after the third iteration …0 (dependent on the previous M mark) –
note that working may be minimal here so please follow through their expressions in k from their
objective row (so if correct, stating k „ 2 and k …1 implies this mark)
c3A1: cao for the range of values for P - this mark is dependent on a correct objective row in the
tableau and the previous three marks in this part