Further Mathematics · June 2023 · Mark scheme · Paper 3B
Edexcel A Level Further Mathematics mark scheme for Paper 3B, June 2023 — 9FM0/3B, file 9fm0-3b-rms-20230817.pdf.
Text of this paper
Mark Scheme
Summer 2023
Pearson Edexcel GCE
In A Level Further Mathematics (9FM0)
Paper 3B Further Statistics 1
Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding body. We provide a wide
range of qualifications including academic, vocational, occupational and specific programmes for
employers. For further information visit our qualifications websites at www.edexcel.com or www.btec.co.uk.
Alternatively, you can get in touch with us using the details on our contact us page at
www.edexcel.com/contactus.
Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help everyone progress in their
lives through education. We believe in every kind of learning, for all kinds of people, wherever they are in
the world. We’ve been involved in education for over 150 years, and by working across 70 countries, in 100
languages, we have built an international reputation for our commitment to high standards and raising
achievement through innovation in education. Find out more about how we can help you and your students
at: www.pearson.com/uk
Summer 2023
Publications Code 9FM0_3B_2306_MS*
All the material in this publication is copyright
© Pearson Education Ltd 2023
General Marking Guidance
All candidates must receive the same treatment. Examiners
must mark the first candidate in exactly the same way as they
mark the last.
Mark schemes should be applied positively. Candidates must be
rewarded for what they have shown they can do rather than
penalised for omissions.
Examiners should mark according to the mark scheme not
according to their perception of where the grade boundaries
may lie.
There is no ceiling on achievement. All marks on the mark
scheme should be used appropriately.
All the marks on the mark scheme are designed to be awarded.
Examiners should always award full marks if deserved, i.e. if the
answer matches the mark scheme. Examiners should also be
prepared to award zero marks if the candidate’s response is not
worthy of credit according to the mark scheme.
Where some judgement is required, mark schemes will provide
the principles
by
which
marks
will be
awarded
and
exemplification may be limited.
When examiners are in doubt regarding the application of the
mark scheme to a candidate’s response, the team leader must
be consulted.
Crossed out work should be marked UNLESS the candidate has
replaced it with an alternative response.
EDEXCEL GCE MATHEMATICS
General Instructions for Marking
1. The total number of marks for the paper is 75.
2. The Edexcel Mathematics mark schemes use the following types of marks:
M marks: method marks are awarded for ‘knowing a method and attempting to apply
it’, unless otherwise indicated.
A marks: Accuracy marks can only be awarded if the relevant method (M) marks have
been earned.
B marks are unconditional accuracy marks (independent of M marks)
Marks should not be subdivided.
3. Abbreviations
These are some of the traditional marking abbreviations that will appear in the mark schemes.
bod – benefit of doubt
ft – follow through
the symbol will be used for correct ft
cao – correct answer only
cso - correct solution only. There must be no errors in this part of the question to
obtain this mark
isw – ignore subsequent working
awrt – answers which round to
SC: special case
oe – or equivalent (and appropriate)
dep – dependent
indep – independent
dp decimal places
sf significant figures
The answer is printed on the paper
The second mark is dependent on gaining the first mark
4. For misreading which does not alter the character of a question or materially simplify it,
deduct two from any A or B marks gained, in that part of the question affected.
5. Where a candidate has made multiple responses and indicates which response they wish
to submit, examiners should mark this response.
If there are several attempts at a question which have not been crossed out, examiners
should mark the final answer which is the answer that is the most complete.
6. Ignore wrong working or incorrect statements following a correct answer.
7. Mark schemes will firstly show the solution judged to be the most common
response expected from candidates. Where appropriate, alternatives answers are
provided in the notes. If examiners are not sure if an answer is acceptable, they will
check the mark scheme to see if an alternative answer is given for the method used.
Qu 1
Scheme
(a) [E(X) = ] 2 0.25 1 a 0 b 1 a 3 0.3
= 0.4
(b)
E( X 2 ) (2) 2 0.25 (1) 2 a 0 12 a 32 0.3 (= 2a + 3.7)
[Var(X) =] 3.9 = 2a 3.7 "0.4 2 "
a = 0.18
[Use of sum of probs = 1 implies 2a + b = 0.45]
b = 0.09
(c)
X 1 X 2 3 when X 1 3, X 2 1
[P X 1 X 2 3 =]
X 1 1, X 2 3
X 1 3, X 2 3
"0.18" 0.3 0.3 "0.18" 0.3 0.3 or 2 0.3 (0.3 "0.18") 0.32
= 0.198
Marks
M1
A1
(2)
M1
dM1
A1
A1ft
(4)
M1
AO
1.1b
1.1b
M1
1.1b
A1
2.1
1.1b
1.1b
1.1b
3.4
1.1b
(3)
(9 marks)
Notes
(a) M1 for a correct attempt (at least 3 correct non-zero terms or products and addition)
division by k (k ≠ 1) is M0
A1 for 0.4 o.e. (correct answer only scores 2 out of 2)
(b) 1st M1
for a correct attempt at E(X2) (at least 3 correct non-zero products and addition)
Missing brackets around –2 and –1 is M0 unless recovered
2
nd
2 dM1 (dep on 1st M1) for use of 3.9 = their E( X 2 ) E( X )
ft their E(X) = 0.4
1st A1 for a = 0.18 o.e.
2nd A1 (dep on 1st M1 only) for b = 0.09 o.e. or their b = 0.45 2 " a " (provided both a
and b are probabilities)
(c) 1st M1 for identifying at least 2 cases e.g. X 1 3, X 2 1 counts as 2 cases
(ignore extras including any incorrect pairs identified)
implied by at least two correct products of probs. or correct ft products of probs.
2nd M1 for a correct numerical expression for the probability
ft their “0.18”
A1
for 0.198 o.e.
Qu 2
(a)
Scheme
H 0 : 1.7
H1 : 1.7
[X = no. of calls in 10 mins ] X ~ Po(17)
[ P X 25 1 P X 24 ] = 0.0406463… or CR: X 27
[ 0.04..> 0.025/ 25 is not in CR so not significant]
insufficient evidence of a change in rate of calls
Marks
B1
M1
A1
AO
2.5
3.3
3.4
A1
2.2b
(4)
(b) [T = no. of calls longer than 8 minutes] T ~ B(70, 0.012)
[P(T > 2) =] P(T 3) = 1 P T 2 = 1 – 0.947725…
= awrt 0.0523
M1
M1
A1
3.3
3.4
1.1b
(3)
(c) [C = no. of calls out of 900 longer than 30 mins]
[C~ B(900, p)] C ~ Po(900p)
900 p
P(C = 0) e
0.05
900p = – ln(0.05) [= 2.9957…]
p = 0.003328… awrt 0.00333
M1
3.3
M1
M1
A1
3.4
1.1b
1.1b
(4)
(11 marks)
Notes
(a) B1 for both hypotheses correct which must be attached to H 0 and H1
must be in terms of or
allow either 1.7 or 17
M1 for stating or using the correct Poisson model.
may be implied by sight of awrt 0.0406/7 or awrt 0.959 or 0.9747… or better
1st A1 for correct prob of awrt 0.04
or for correct CR found X 27 (X > 26) (ignore lower tail CR if found) allow CV X = 27
nd
2 A1 (dep on M1A1) for a correct conclusion in context mentioning “rate of calls” o.e.
Allow e.g. ‘The rate of calls is 1.7 per minute/17 per 10 minutes’
Must be rate o.e. not “number”
A0 if inconsistent comments are seen e.g. “reject H 0 , no change in rate of calls”
(b) 1st M1 for sight or use of the correct binomial model.
may be implied by sight of awrt: 0.0523 or 0.948 or 0.795 or 0.205
2nd M1 for correct interpretation of more than 2 (allow 1 – 0.95 or better)
A1
for awrt 0.0523 (correct answer only scores 3 out of 3)
SC: Use of Po(70 ×0.012) leading to an answer of 0.0533(45…) and scores M1M1A0
(c) 1st M1 for sight or use of Po(900p) (as a suitable approx. to B(900, p) )
(may be implied by correct answer awrt 0.00333)
nd
2 M1 for a correct equation in p or correct use of P(C = 0) from Po e.g. e 0.05
3rd M1 for a correct method to solve for p (allow p = + ln(0.05)/900)
or to solve for , i.e. awrt 3(.00)
1
A1
for p = awrt 0.00333 Must see Po used condone
o.e.
300
Allow standard form (awrt 3.33 × 10-3) or percentage (awrt 0.333%)
SC: Use of Binomial gives 0.003323… awrt 0.00332 scores M0M0M0A1
Qu 3
Scheme
(a) [X ~B(5, 0.5)] P(X = 0) = P(X = 5) = 0.03125
or P(X = 2) or P(X = 3) = 0.3125
[multiply by 170 to get] r = 5.31(25) ; s = 53.1(25)
(b)
Mark
M1
Oi 2
Ei
(3'5.31')2
'5.31'
(10 26.56)2
26.56
(45 '53.1') 2
'53.1'
(62 '53.1')2
'53.1'
(38 26.56)2
26.56
(12 '5.31')2
'5.31'
1.00...
10.3...
1.23...
1.48...
4.92...
8.41...
32
'5.31'
102
26.56
452
'53.1'
622
'53.1'
382
26.56
122
'5.31'
3.76...
38.1...
72.3...
54.3...
27.1...
1.69...
Oi Ei
M1
1.1b
A1
1.1b
2
Oi 2
E
E 170 27.4 … awrt 27.4 or awrt 27.5
i
i
Degrees of freedom is 6 – 1 = 5 , and critical value is 11.07(0)
[Significant result] Marcus’ model/B(5, 0.5) is not a good fit. (o.e.)
(c)
1.1b
1.1b(x2)
A1;A1
(3)
B1
2.5
H 0 :B(5, 0.5) is a suitable model H1 : B(5, 0.5) is NOT a …
( Oi Ei ) 2
Ei
AO
or
0 3 110 ... 5 12
pˆ
= 0.58588… awrt 0.586
170 5
B1ft B1ft 1.1b(x2)
A1
2.2b
(6)
B1
1.1b
(1)
(d)(i) Need to pool (first 2) cells (0 and 1 since E(0) < 5) and use of p̂
Degrees of freedom: 5 groups – 2 constraints = 3
(ii) Critical value is 7.815
M1
A1
B1ft
2.4
1.1b
1.1b
(3)
(e)(i) Nima’s model is a good fit (since 1.62 < ‘7.815’)/Marcus’ is not
and this suggests coin is biased/probability of head approx. 0.6
(ii) Nima’s test suggests binomial is a good model and therefore
independence of spins is a reasonable assumption
B1
2.4
B1
2.2b
(2) (15 marks)
Notes
(a) M1 for 1 correct probability which may be embedded (0.03125 or 0.3125 or 0.55 or 5C2 0.52 × 0.53)
85
1st A1 for r = awrt 5.31 (condone 16
)
2nd A1 for s = awrt 53.1 (condone 425
8 )
st
(b) 1 B1 for both hypotheses mentioning B(5, 0.5) or Marcus’ distribution at least once
M1 for at least one correct (ft) term or expression of the test statistic (accept 2sf)
1st A1 for awrt 27.4 or awrt 27.5 (correct value here scores M1A1)
2nd B1 for 5 or ft if ‘their r’ < 5, then df (= 4 – 1) = 3
3rd B1 for 11.07(0) (or better) for ft df = 4 9.488 or df = 3 7.815
A1
dep on 1st M1 for a suitable conclusion in context rejecting B(5, 0.5)/Marcus’ model
Must be compatible with their test statistic and their CV. Just ‘Bin is not a good fit’ is A0
A0 if inconsistent comments are seen e.g. “do not reject H 0 , B(5, 0.5) is not a good fit”
(c) B1
(d)(i) M1
498
for awrt 0.586 allow 850
o.e.
for both reasons, must mention pooling or show pooling or mention exp. value < 5 and
use of estimated parameter
A1 for df = 3 (must have scored the M1 for this mark)
(ii) B1 for 7.815 (or better) allow this independent of the M1 only allow ft on df=4 9.488
(e)(i) 1st B1 for stating Nima’s (binomial) model is a good fit/do not reject H0 for Nima’s model/Marcus’
model is not a good fit and suggest that coin is probably biased/ p > 0.5 (p closer to ‘their (c)’)
Only comparing 1.62 with ‘27.4’ to reach p > 0.5 is incorrect and scores B0
(ii) 2nd B1 for mention of Nima’s test suggests Binomial distribution is suitable and that spins are
independent (ignore reference to Marcus’ test for 2nd B1)
Qu 4
Scheme
[X = no. of rolls to 4 sixes] X~NegBin(4,
r
24 ,
p
1
6
)
r (1 p) 4 56
1 = 120
p 2
36
2
2
"120"
[ X ~]N "24",
32
P( X < 27.2) = 0.95078… awrt 0.951
Mark
M1
AO
3.3
A1, A1
1.1b(x2)
M1 M1
2.1,3.4
A1
1.1b
(6 marks)
Notes
1st M1 for selecting the correct negative binomial model. May be implied by correct mean
or variance
NegBin on its own is M0
1st A1 for mean = 24
2nd A1 for variance = 120
120 is A0 unless recovered
2nd M1 for writing or using of normal with mean 24 (may be implied by correct answer)
ft their mean which may come from any distribution
120
3rd M1 for writing or using normal with standard deviation
3.75
32
their
where may come from any distribution
32
(may be implied by correct answer)
ft
2nd A1 for awrt 0.951 (correct answer scores 6 out of 6)
Qu 5
(a)
H 0 : 330
Scheme
H1 : 330
2
8
[ X ~]N 330,
25
P X C 0.05
C 330
8
1.6449
Marks
B1
AO
2.5
M1
3.3
M1
3.4
A1
1.1b
25
So C = 327.368… and critical region is: X < awrt 327
(4)
(b)
8
Y ~ N 330,
and require 2 P Y 328 (o.e.)
55
= 0.063732… awrt 0.0637
2
M1
3.3
A1
1.1b
(2)
(c) P( X > “327.368…”| = 325) or 1 – P( X < “327.368…”| = 325) M1
= 0.0694233… awrt 0.0694
A1
3.4
1.1b
(2)
(8 marks)
Notes
(a) B1
for both hypotheses in terms of
1st M1 for stating or using the correct model – may be implied by use in later line.
Condone X or any letter for X
2nd M1 for a correct equation for C Allow any z value that satisfies 1.6 < |z| < 1.7
If standardisation equation not seen, this mark may be implied by CV = awrt 327 or
CR: <awrt 327
A1
for a correct CR allow just “< awrt 327” Condone e.g. X < 327 rather than X < 327
Condone
(b) M1
for sight of correct model and attempt at P Y 328 (o.e.) Condone missing 2
A1
(c) M1
for awrt 0.0637 (correct answer scores 2 out of 2)
for a correct (ft) statement may be implied by sight of e.g. Z > "327.36..." 325 = 1.48..
8
5
For = 325 allow X ~N(325, ….)
Allow ft from a 2-tailed test in part (a)
A1
for awrt 0.0694
(correct answer scores 2 out of 2)
SC Sight of P(328 < X < 332| = 325) or 1 – P( X < 328 X > 332| = 325)
scores M1A0
Qu6
(a)
Scheme
Marks
AO
r
pt
NegBin(r, p) has pgf
and identify the connection
1 (1 p )t
NegBin(2, 13 )
M1
2.1
A1
2.2a
(2)
(b) e.g. no. of rolls to achieve 5 or 6 (so that p = 13 ) twice (oe)
B1ft
3.3
(1)
(c)(i)
(ii)
GX (t )
2t (3 2t ) ( 2) 2(3 2t )t
(3 2t )4
GX (t )
6(3 2t ) ( 2) 3(3 2t ) 6t
18 24t
or
6
(3 2t )
(3 2t ) 4
2
3
2
or
6t
(3 2t )3
E(X) = GX (1) = 6
M1
A1
2.1
1.1b
A1
1.1b
M1
2.1
A1
M1
A1
1.1b
1.1b
1.1b
2
GX (1) = 42
Var(X) = “42” + “6” "6"
2
= 12
(7)
(d)
1 2
GY (t ) t 10 1 t 3
9 3
2
t 10
(2)(3)(4) 2 9
1 ...
3 t ...
9
3!
3
P(Y = 19) =
32
243
M1 A1
2.1
1.1b
A1
1.1b
(3)
ALT Identify that Y = 3X + 4
M1
3
4 1 2 1
(Y = 19 requires X = 5 so ) P(X = 5) =
1 3 3 3
A1
(13 marks)
Notes
(a) M1 for identifying the NegBin distribution (allow NB for NegBin)
A1 for r = 2 and p = 13
(b) B1ft for identifying a suitable definition for X using a (fair) die, with p = 13 and the second
occurrence of the event, only ft their NegBin distribution in (a). A finite number of rolls is B0
(c)(i) 1st M1 for attempt to differentiate quotient or product. At least one uv style term correct.
1st A1 for a fully correct first derivative (needn’t be simplified)
2nd A1 for E(X) = 6 NB this A1 depends on M1 only but M1A0A1 is possible
(ii) 2nd M1 for attempt to diff’ quotient or product again. At least one uv style term correct.
3rd A1 for 42 (may be given for incorrect G provided their G (1) gives 42 and M1 scored)
Note all powers of (3 – 2t) equal 1 when t = 1 is substituted so can be used as a check
3rd M1 for correct use of pgf to find Var(X)
4th A1 dep on M3 for 12
(d) M1
for writing pgf in suitable form to carry out binomial expansion
st
1 A1 for a correct expression for coefficient of t19
32
2nd A1 for 243
or exact equivalent
ALT M1
for identifying connection Y = 3X + 4
st
1 A1
for a correct numerical probability expression for P(X = 5)
Qu7
Scheme
(a)(i) X~Geo(0.2) or P(X = 4) = 0.83 0.2
= 0.1024
(ii)
T~NegBin(3,0.2)
7
or P(T = 8) = 0.22 0.85 0.2
2
= 0.05505… awrt 0.0551
Marks
M1
A1
(2)
AO
3.3
1.1b
M1
3.3
A1
1.1b
(2)
(iii)
F~B(10, 0.2)
or
10
P(F = 4) = 0.24 0.86
4
P(F = 4) = 0.088080… awrt 0.0881
(b) P(R) = P(X 4) and X~Geo(0.2)
= 1 – P(X > 4) = 1 0.84
P(X 1) , X ~ B(4, 0.2)
= 1 – P(Y = 0) = 1 0.84
= 0.59(04)
P(Y) = P(N 7) and N ~NegBin(3, 0.4)
3
0.43 0.430.61
2
4 3 2 5 3 3
7 2 5 7 1 6 7 7
0.4 0.6 0.4 0.6
1
0.4 0.6 0.4 0.6 0.6
2
2
1
0
2
6
3 4
0.4 0.6
2
P(Y) = P(W > 2) where W~B(7, 0.4)
ALT
= 1 – P(W 2) [ = 1 – 0.419904]
= 0.58(0096 )
R (has the greater probability)
M1
3.3
A1
1.1b
(2)
M1
M1
A1
M1
3.1b
3.4
1.1b
3.1b
M1
3.4
M1
M1
A1
A1
1.1b
3.2b
(7)
(13 marks)
Notes
(a)(i) M1 for selecting the correct model. Stated or used which may be implied by ans.
64
A1 for 0.1024 or 625
(accept 0.102) (correct answer scores 2 out of 2)
(ii) M1 for selecting the correct model. Stated or used which may be implied by ans.
Allow 0.2 × P(V = 2) from V ~B(7, 0.2)
A1 for awrt 0.0551
(correct answer scores 2 out of 2)
(iii) M1 for selecting the correct model. Stated or used may be implied by ans of 0.967(2)
A1 for awrt 0.0881 (correct answer scores 2 out of 2)
(b) 1st M1 for a correct distribution and prob. expression for P(R) (may be implied by 2nd M1)
2nd M1 for a correct numerical expression for P(R) (allow any equivalent expression)
1st A1 for awrt 0.590 or 369
625 (accept 0.59 or better) awrt 0.590 implies M1M1A1
rd
3 M1 for a correct distribution and prob. expression for P(Y) (may be implied by 4th M1)
4th M1 for a correct numerical expression for P(Y) (allow any equivalent expression)
2nd A1 for awrt 0.580 or (accept 0.58 or better)
awrt 0.580 implies M1M1A1
3rd A1 dep on all other marks for R or correct description in words
Condone P(R) > P(Y)
Pearson Education Limited. Registered company number 872828
with its registered office at 80 Strand, London, WC2R 0RL, United Kingdom