Mark Scheme (Result)
October 2020
Pearson Edexcel GCE In A level Further
Mathematics
Paper 9FM0/3D

Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding body. We
provide a wide range of qualifications including academic, vocational, occupational and specific
programmes for employers. For further information visit our qualifications websites at
www.edexcel.com or www.btec.co.uk. Alternatively, you can get in touch with us using the details
on our contact us page at www.edexcel.com/contactus.

Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help everyone progress in their
lives through education. We believe in every kind of learning, for all kinds of people, wherever they are in
the world. We’ve been involved in education for over 150 years, and by working across 70 countries, in
100 languages, we have built an international reputation for our commitment to high standards and
raising achievement through innovation in education. Find out more about how we can help you and your
students at: www.pearson.com/uk

October 2020
Publications Code 9FM0_3D_2010_MS
All the material in this publication is copyright
© Pearson Education Ltd 2020

General Marking Guidance

•

All candidates must receive the same treatment. Examiners must
mark the first candidate in exactly the same way as they mark the
last.

•

Mark schemes should be applied positively. Candidates must be
rewarded for what they have shown they can do rather than
penalised for omissions.

•

Examiners should mark according to the mark scheme not
according to their perception of where the grade boundaries may
lie.

•

There is no ceiling on achievement. All marks on the mark scheme
should be used appropriately.

•

All the marks on the mark scheme are designed to be awarded.
Examiners should always award full marks if deserved, i.e. if the
answer matches the mark scheme. Examiners should also be
prepared to award zero marks if the candidate’s response is not
worthy of credit according to the mark scheme.

•

Where some judgement is required, mark schemes will provide the
principles by which marks will be awarded and exemplification may
be limited.

•

When examiners are in doubt regarding the application of the mark
scheme to a candidate’s response, the team leader must be
consulted.

•

Crossed out work should be marked UNLESS the candidate has
replaced it with an alternative response.

EDEXCEL GCE MATHEMATICS
General Instructions for Marking
1. The total number of marks for the paper is 75.
2. The Edexcel Mathematics mark schemes use the following types of
marks:
•
•
•
•

M marks: method marks are awarded for ‘knowing a method and
attempting to apply it’, unless otherwise indicated.
A marks: Accuracy marks can only be awarded if the relevant method
(M) marks have been earned.
B marks are unconditional accuracy marks (independent of M marks)
Marks should not be subdivided.

3. Abbreviations
These are some of the traditional marking abbreviations that will appear in
the mark schemes.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•

bod – benefit of doubt
ft – follow through
the symbol
will be used for correct ft
cao – correct answer only
cso - correct solution only. There must be no errors in this part of the
question to obtain this mark
isw – ignore subsequent working
awrt – answers which round to
SC: special case
oe – or equivalent (and appropriate)
dep – dependent
indep – independent
dp decimal places
sf significant figures
 The answer is printed on the paper
The second mark is dependent on gaining the first mark

4. All A marks are ‘correct answer only’ (cao.), unless shown, for example,
as A1 ft to indicate that previous wrong working is to be followed
through. After a misread however, the subsequent A marks affected are
treated as A ft, but manifestly absurd answers should never be awarded
A marks.

Questi
on

Scheme

Marks

AOs

M1

1.1b

A1

1.1b

1(a)

(2)
(b)

Kruskal’s algorithm: AD, AB, BC, CG, reject BD, EG, reject CE, reject
CD, reject AE, CF (reject EF, reject FG, reject DF)

M1
A1
A1

1.1b
1.1b
1.1b

(3)
(c)

Weight of MST: 162 (km)

B1

1.1b

(1)
(6 marks)
Notes for Question 1
(a)
M1: Either all arcs correct (ignore weights) or two arcs correct (including correct weights)
A1: CAO
(b)
M1: Kruskal’s algorithm – first three arcs correctly chosen and at least one rejection seen at some
point
A1: All six arcs selected correctly AD, AB, BC, CG, EG, CF only
A1: CSO – all selections and rejections correct (in correct order and at the correct time)
(c)
B1: CAO (condone lack of units)

Questi
on

2(a)

Scheme

The dummy at the end of activity B is required as F (and G) are
dependent on activity B only, but activity H is dependent on both
activities B and C
The dummy at the end of activity K is required as two activities cannot
start at the same event and finish at the same event

Marks

AOs

B1

2.4

B1

2.4

(2)
(b)

Activity

IPA

Activity

IPA

Activity

IPA

A

-

E

A

I

E, F

B

-

F

B

J

G, H

C

-

G

B

K

D, I

D

A

H

B, C

L

D, I

B1

1.1b

B1

1.1b

(2)

(c)(i)

M1
A1
M1
A1

1.1b
1.1b
1.1b
1.1b

(c)(ii)

Minimum completion time: 21 hours

A1ft

1.1b

(c)(iii)

Critical activities: A, E, I, L

A1

1.1b

(6)
(d)

e.g.
M1
A1
A1

(3)

1.1b
1.1b
1.1b

(e)

Currently five workers are required between time 7 and 10 and so one of
the non-critical activities D, F, G or H would have to be delayed and
start after time 10
e.g. Activity H could be delayed and start at time 10 (as it has sufficient
total float and can finish as late as time 15) and so the project can be
completed with fewer workers than the number indicated by the resource
histogram as J could be delayed too and start at time 15

M1

2.4

A1

2.2a

(2)
(15 marks)
Notes for Question 2
(a)
B1: Correct explanation for precedence dummy (must mention B, C, H and one of F or G)
B1: Correct explanation for uniqueness dummy
(b)
B1: Six correct rows (not including A, B and C)
B1: All rows correct (accept blanks for A, B and C)
(c)(i)
M1: All top boxes completed, number generally increasing L to R (condone one “rogue”)
A1: CAO - Top boxes
M1: All bottom boxes completed, numbers generally decreasing R to L (condone one “rogue”) –
condone lack of 0 or 21 for the M mark only
A1: CAO - Bottom boxes
(c)(ii)
A1ft: Correct follow through from their completed top boxes
(c)(iii)
A1: Correct critical activities (A, E, I and L only)
(d)
M1: Plausible histogram (correct up to time 6) with no holes or overhangs (must go to at least 20 on
the time axis)
A1: Histogram correct to time 10
A1: Histogram correct from time 10 to time 21
(e)
M1: Explanation involving the need to delay just one of the non-critical activities (must mention one
of D, F, G or H) to start after time 10 (oe) – follow through their histogram
A1: Dependent on a correct histogram and correct answer to (c)(i). Correct deduction that it is
possible to complete with fewer workers e.g. delay H to start at 10 therefore delay J to start at its late
time (or 15) – A0 if mention of delaying activity F

Questi
on

Scheme

3(a)
A
B
C
D
E

Time matrix
A B
C
D
8
4
7
8
3

4
3

7
1

6
1
 10

E

10
6
1
-

Route matrix
A B C D
A B C D
A B C D
A B C D
A B C D
A B C D

A
B
C
D
E

E
E
E
E
E
E

Marks

AOs

B1

1.1b

B1

1.1b

(2)

A
B
C
D
E

A
7
4
5
10

Time matrix
B
C
D
7
4
7
3
14
3
11
4
1
9
6
1

E
10
9
6
1
-

A
B
C
D
E

A
7
4
5
6

Time matrix
B
C
D
7
4
7
3
14
3
11
4
1
5
2
1

E
8
9
6
1
-

(b)

A
B
C
D
E

A
A
C
A
C
C

Route matrix
B
C
D
C
C
D
B
C
C
B
C
A
C
C
D
C
C
D

A
B
C
D
E

A
A
C
A
C
D

Route matrix
B
C
D
C
C
D
B
C
C
B
C
A
C
C
D
D
D
D

E
C
C
E
E
E

E
D
C
E
E
E

M1
A1
M1
A1

1.1b
1.1b
1.1b
1.1b

(4)
(c)(i)

NNA: A – C – B – E – D – A

B1

1.1b

(ii)

4 + 3 + 9 + 1 + 5 = 22 minutes

dB1

1.1b

(iii)

A–C–B–C–E–D–C–A

B1

3.2a

(3)
(9 marks)
Notes for Question 3
(a)
B1: Correct time matrix
B1: Correct route matrix

(b)
M1: No change in the third row and third column of both matrices with at least one value in the time
matrix reduced correctly and one value in the route matrix changed to C
A1: CAO
M1: No change in the fourth row and fourth column of both matrices with at least one value in the
time matrix reduced correctly (follow through their first iteration) and one value in the route matrix
changed to D
A1: CAO
(c)(i)
B1: CAO
(c)(ii)
dB1: CAO – not from A – C – D – E – B – A
(c)(iii)
B1: CAO

Questi
on

4(a)

Scheme

2 y  5 x , y  x + 1, 6 x + 5 y  30

Marks

B2,1,0

AOs

1.1b
2.5

(2)
(b)

 2 5   60 150   25 36 
 ,  ,  37 , 37  ,  11 , 11 
 

 3 3 

B1

1.1b

B1

1.1b

M1

2.1

A1

2.2a

11
 2 5
 , →P=
3
 3 3

330
 60 150 
 ,
→P=
37
 37 37 
111
 25 36 
 25 36 
so optimal vertex is  , 
 , →P=
11
 11 11 
 11 11 

(4)
(c)

Q = 3x + ay

 25  36a
 60  150a
3  +
 3  +
 11  11
 37  37

M1

3.1a

A1

2.2a

 25  36a
 2  5a
3  +
 3  +
 11  11
3 3

M1

1.1b

 a  −3

A1

2.2a

a

5
2

(4)
(10 marks)
Notes for Question 4
(a)
B1: Any two correct (accept strict inequalities) – accept equivalent inequalities
B1: CAO (accept equivalent inequalities but inequalities must not be strict)
(b)
B1: One correct vertex (must be exact)
B1: All three correct vertices (must be exact)
M1: Testing all three of their vertices in the correct objective function
A1: Correct three values of P and correct optimal vertex either stated or clearly indicated on the
graph

(c)
60 150 
M1: Their optimal point from (b) evaluated in Q compared to their  ,
 evaluated in Q (with
 37 37 
correct inequality)
5
A1: a 
2
2 5
M1: Their optimal point from (b) evaluated in Q compared to their  ,  evaluated in Q (with
 3 3
correct inequality)
A1: a  −3

Questi
on

5(a)

Scheme

Marks

AOs

B1

3.1a

x  21

B1

2.4

However, the number are all distinct and therefore 13  x  21

B1

2.2a

If x has been placed in Bin 2 then 10  x  31 - this is because Bin 1 at
this stage only contains 40 and before x had been placed in Bin 2 it only
contained 19
As the 18 has been placed in Bin 3 this implies that x  50 − (19 + 18 ) so

x  13
As the 10 has been placed in Bin 2 after the x then x  50 − (19 + 10 ) so

(3)
(b)

B1
B1

13  x  17

2.2a
2.2a

(2)
(c)

If x has been placed in Bin 3 then this implies that x  15

M1

2.4

So x is either 14 or 15 – but as Bin 2 is full  x = 14

A1

2.2a

(2)
(7 marks)
Notes for Question 5
(a)
B1: Correct reasoning of why x  13 accept x  50 − (19 + 18 )
B1: Correct explanation of why x  21 accept x  50 − (19 + 10 )
B1: Correct deduction that 13  x  21 must mention that the numbers are distinct (oe)
(b)
B1: Use first complete pass to deduce that x < 17
B1: Correct lower bound of x > 13
(c)
M1: Using first-fit decreasing in an attempt to derive new upper bound for x (so either for stating
both x could equal 14 or 15, x  15 or x < 15)
A1: Correct deduction that x = 14 (must clearly state or imply that Bin 2 is full)

Questi
on

6(a)

Scheme

The graph has exactly two odd nodes and so the graph is semi-Eulerian

Marks

AOs

B1
dB1

2.4
2.2a

(2)
(b)
M1

1.1b

A1

1.1b

A1

1.1b

A1

1.1b

Shortest path from A to F is 58 + x and shortest path from A to G is
60 + y

A1ft

2.2a

58 + x + 60 + y = 140

M1

2.1

The only odd nodes in the network are A and G

B1

2.2a

Route inspection algorithm: Shortest route between A and G is 60 + y
 320 + x + y + 60 + y = 409

M1

3.1b

x = 15 and y = 7

A1

2.2a

(9)
(11 marks)
Notes for Question 6
(a)
B1: Explanation which consists of the graph having two odd nodes or stating graph is semi-Eulerian
dB1: Exactly two odd nodes (or two odd nodes and five even nodes or the rest even) together with
the deduction that therefore the graph is semi-Eulerian
(b)
M1: For a larger number replaced by a smaller one in two working value boxes at C, D, G or F
A1: For all values correct (and in correct order) at A, B and C
A1: For all values correct (and in correct order) at E and D
A1: For all values correct (and in correct order) at G and F
A1ft: Length of shortest path from A to F or A to G stated (may be seen in an equation(s))
M1: (length of shortest path from A to F) + (length of shortest path from A to G) = 140 – linear
equation in x and y
B1: Correctly stating the two odd nodes (A and G) – could be implied by subsequent working
M1: For an equation based on the route from A to G (320 + x + y + final value at G (in y) = 409)
A1: CAO for x and y

Questi
on

7(a)

Scheme

Marks

AOs

Maximise ( P = ) 2 x + y + 3z

B1

3.4

x + 2 y + 3 z  45

B1

3.4

3x + 2 y  9

B1

3.4

−x + 4z  4

B1

1.1b

(4)
(b)

A = − ( a1 + a2 )  − ( 9 − 3x − 2 y + s2 + 4 + x − 4 z + s3 )
A − 2 x − 2 y − 4 z + s2 + s3 = −13 therefore bottom row of the table is

A

−2

−2

−4

0

1

1

0

0

−13

M1

2.1

A1

2.2a

(2)
(c)(i)

In the given tableau the value of the objective A is equal to zero
indicating that a basic feasible solution has been found

B1

2.4

(c)(ii)

7
147
x = 3, y = 0, z = , s1 =
, s2 = s3 = 0
4
4

B1
B1

3.4
1.1b

(3)
(d)

b.v

x

y

z

s1

s2

s3

Value

s2

0

10
7

0

12
7

1

9
7

63

x

1

8
7

0

4
7

0

3
7

24

z

0

2
7

1

1
7

0

P

0

15
7

0

11
7

0

−

1
7

3
7

7
69

Row Ops
R1 

7
12

R2 +

1
R1
3

R3 +

1
R1
12

R4 +

11
R1
12

M1
A1
M1
A1
A1

2.1
1.1b
1.1b
1.1b
1.1b

(5)
(e)(i)

Yes, an optimal solution has been found as there are no negative values
in the objective (P) row

(e)(ii)
(e)(iii)

B1

2.4

P = 69

B1ft

3.4

s2 = 63, x = 24, z = 7

B1ft

3.4

(3)
(17 marks)

Notes for Question 7
(a)
B1: CAO – including maximise (or max)
B1: CAO (oe)
B1: CAO (oe)
B1: CAO (oe)
(b)
M1: Setting up the new objective and substituting for a1 and a2
A1: Correct values substituted into Table 1
(c)
B1: CAO – mention that A = 0
B1: At least three values stated correctly
B1: All six values correct (ignore values stated for a1 , a2 and P)
(d)
M1: Correct pivot located, attempt to divide row
A1: Pivot row correct including change of b.v.
M1: All values in one of the non-pivot rows correct or one of the non zero and one columns (y,
s1 , s3 or value) correct following through their choice of pivot from column s2 or s3
A1: Row operations used correctly at least twice, i.e. two of the non zero and one columns (y, s1 , s3
or value) correct
A1: CAO all values and row operations correctly stated – allow if row operations given in terms of
old row 1 – ignore b.v. column for this mark
(e)(i)
15
11
3
B1: Correct reasoning of why solution is optimal or using P = 69 − y − s1 − s3 and
7
7
7
mentioning increasing y, s1 , s3 would decrease P (oe)
(e)(ii)
B1ft: their value of P – dependent on both M marks in (d)
(e)(iii)
B1ft: their values of the basic variables only – dependent on both M marks in (d)