Mathematics · June 2025 · Mark scheme · Paper 21
Edexcel AS Level Mathematics mark scheme for Paper 21, June 2025 — 8MA0/21, file 8ma0-21-rms-20250814.pdf.
Text of this paper
Mark Scheme (Results)
Summer 2025
Pearson Edexcel GCE
AS Mathematics (8MA0)
Paper 21 Statistics
Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding body. We
provide a wide range of qualifications including academic, vocational, occupational and specific
programmes for employers. For further information visit our qualifications websites at
www.edexcel.com or www.btec.co.uk. Alternatively, you can get in touch with us using the
details on our contact us page at www.edexcel.com/contactus.
Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help everyone
progress in their lives through education. We believe in every kind of learning, for all kinds of
people, wherever they are in the world. We’ve been involved in education for over 150 years,
and by working across 70 countries, in 100 languages, we have built an international reputation
for our commitment to high standards and raising achievement through innovation in
education. Find out more about how we can help you and your students at:
www.pearson.com/uk
Summer 2025
Question Paper Log Number P76377A
Publications Code 8MA0_21_2506_MS
All the material in this publication is copyright
© Pearson Education Ltd 2025
General Marking Guidance
•
All candidates must receive the same treatment. Examiners
must mark the first candidate in exactly the same way as
they mark the last.
•
Mark schemes should be applied positively. Candidates must
be rewarded for what they have shown they can do rather
than penalised for omissions.
•
Examiners should mark according to the mark scheme not
according to their perception of where the grade boundaries
may lie.
•
There is no ceiling on achievement. All marks on the mark
scheme should be used appropriately.
•
All the marks on the mark scheme are designed to be
awarded. Examiners should always award full marks if
deserved,
i.e.
if
the
answer
matches
the
mark
scheme. Examiners should also be prepared to award zero
marks if the candidate’s response is not worthy of credit
according to the mark scheme.
•
Where some judgement is required, mark schemes will
provide the principles by which marks will be awarded and
exemplification may be limited.
•
When examiners are in doubt regarding the application of
the mark scheme to a candidate’s response, the team leader
must be consulted.
•
Crossed out work should be marked UNLESS the candidate
has replaced it with an alternative response.
EDEXCEL GCE MATHEMATICS
General Instructions for Marking
1. The total number of marks for the paper is 30.
2. The Edexcel Mathematics mark schemes use the following types of marks:
•
•
•
•
M marks: method marks are awarded for ‘knowing a method and attempting
to apply it’, unless otherwise indicated.
A marks: Accuracy marks can only be awarded if the relevant method (M)
marks have been earned.
B marks are unconditional accuracy marks (independent of M marks)
Marks should not be subdivided.
3. Abbreviations
These are some of the traditional marking abbreviations that will appear in the mark
schemes.
• bod – benefit of doubt
• ft – follow through
• the symbol will be used for correct ft
• cao – correct answer only
• cso - correct solution only. There must be no errors in this part of the
question to obtain this mark
• isw – ignore subsequent working
• awrt – answers which round to
• SC: special case
• oe – or equivalent (and appropriate)
• dep – dependent
• indep – independent
• dp decimal places
• sf significant figures
• The answer is printed on the paper
•
The second mark is dependent on gaining the first mark
4. For misreading which does not alter the character of a question or materially
simplify it, deduct two from any A or B marks gained, in that part of the
question affected.
5. Where a candidate has made multiple responses and indicates which
response they wish to submit, examiners should mark this response.
If there are several attempts at a question which have not been crossed out,
examiners should mark the final answer which is the answer that is the most
complete.
6. Ignore wrong working or incorrect statements following a correct answer.
7. Mark schemes will firstly show the solution judged to be the most common
response expected from candidates. Where appropriate, alternatives
answers are provided in the notes. If examiners are not sure if an answer
is acceptable, they will check the mark scheme to see if an alternative
answer is given for the method used.
Question
Scheme
1(a)
awrt 0.173
(b)
awrt 0.191
(c)
awrt 0.191
Marks
AOs
B1
(1)
B1
(1)
B1ft
(1)
1.1b
1.1b
2.2a
(3 marks)
Notes
(a)
B1:
(b)
B1:
(c)
B1ft:
SC:
calc gives 0.172968…
calc gives 0.191004… do not isw if e.g. 1 – 0.191 = 0.809 is then found
ft their answer to (b) to 3sf or better only ft 0 < “their (b)” < 1
For all correct answers given to 2sf i.e. (a) 0.17 (b) 0.19 (c) 0.19 score B0B0B1ft
Question
2(a)
(b)(i)
(b)(ii)
Scheme
Marks
AOs
Census
B1
(1)
1.2
1018 – (1025 – 1018) × 1.5 ( = 1007.5)
M1
2.1
(1007 < 1007.5 ) There is one outlier/1007 is an outlier
A1
1.1b
Lower whisker drawn to 1009 and a single outlier at 1007
(2)
B1ft
2.2a
Allow lower whisker to end at 1007.5 or 1009
(c)
184 – 161 = 23 days with “Moderate” Windspeed
23 × 0.25 = 5.75, so 6 days.
(1)
M1
A1
(2)
2.4
2.2b
LDS
(6 marks)
Notes
(a)
B1:
(b)(i)
M1:
A1:
(b)(ii)
B1ft:
(c)
M1:
A1:
cao
finding the correct IQR for “light days” and using it to calculate the lower outlier
limit (implied by a correct lower limit 1007.5)
correct outlier limit with correct conclusion
Note: 1007 on its own with no supporting working is M0A0.
correct lower whisker drawn to 1009 and single outlier marked at 1007
or correct ft their conclusion to part (b)(i) i.e. if they state there are no outliers, then
the lower whisker must be drawn to 1007
using knowledge of LDS to find the number of days with “Moderate” Windspeed.
Allow use of 180 to 185.
Implied by an answer of 5.75 or 19 to 24 from correct knowledge of LDS
allow 5 or 6 days
Correct answer only M1A1.
Question
3(a)
(b)(i)
(ii)
Notes
(a)
M1:
M1:
A1:
Scheme
Marks
AOs
M1
M1
A1
(3)
1.1b
3.3
1.1b
B1
2.5
[X ~] B(40, 0.2)
M1
3.3
[P(X ⩾11) = 1 – 0.8392…] = 0.1607...
awrt 0.16
[Do not reject H0/not significant…]
There is insufficient evidence to support Jayda’s belief.
A1
3.4
A1
2.2b
p + 0.2 + 4p = 1
B(inomial)
n = 40 p = 0.16
H0 : p = 0.2
H1 : p > 0.2
Require P(X ⩽ k) > 0.95 so
[P(X ⩽11) =] 0.9125 or [P(X ⩽12) =] 0.9568
[0 ⩽] X ⩽12
(4)
M1
3.4
A1
(2)
1.1b
(9 marks)
use of sum of probabilities = 1 (may be implied by p = 0.16)
identifying the B(inomial) distribution to model this situation (must be seen in part
(a))
both correct parameters n = 40 and p = 0.16
Answer only B(40, 0.16) scores M1M1A1.
Mark (b)(i) and (b)(ii) together
(b)(i)
B1:
both hypotheses correct in terms of p or π
M1:
writing or using Binomial (40, 0.2) (implied by awrt 0.16 or awrt 0.073)
A1:
awrt 0.16
If P(X ⩾11) = awrt 0.16 is seen, isw if a different p–value is stated.
Watch out [P(X = 8) =] 0.156 and is A0
A1:
dep on M1A1 (but independent of hypotheses)
for suitable conclusion in context that suggests Jayda’s belief is not supported or
states that there is not enough evidence that the proportion/probability of green
counters in the bag is greater than 0.2
with bold words oe Do not allow number for proportion/probability
Allow not increased/not changed/is 0.2 for not greater than 0.2
A0 for contradictory statements e.g. Reject H0 ∴ Jayda’s belief is not supported.
SC:
Use of critical region without stating p-value can score max B1M1A0A1
The final A1 is for the correct contextual conclusion and a correct CR X ⩾13 seen
(allow any letter) or equivalent.
(b)(ii)
M1:
A1:
SC:
Use of B(40, 0,2) to find a relevant acceptance region probability
i.e. awrt 0.91 or awrt 0.96 or awrt 0.088 or awrt 0.043
Allow if these are seen in part (b)(i) as part of a critical region approach
correct acceptance region or equivalent, e.g. X < 13. Allow any letter. May be stated
in words. Correct acceptance region on its own scores M1A1.
Do not allow probability statements for acceptance region e.g. P(X < 13)
Use of a two-tailed test in (b)(i) leading to an acceptance region of 3 ⩽ X ⩽13
scores M1A0
Question
4(a)
(b)(i)
Scheme
Scc
=
σ =
n
b=
−3.5
500
394
=
3.9698...
25
awrt 3.97
AOs
B1
1.1b
(1)
or
16.5 = a + 2200b
= –0.007
(b)(ii)
Marks
20 = a + “–0.007”(1700) or
20 = a + 1700b
= 31.9
M1
2.2a
A1
1.1b
(2)
M1
A1
(2)
2.2a
1.1b
(5 marks)
Notes
(a)
B1:
awrt 3.97
(allow s = awrt 4.05)
Mark (b)(i) and (b)(ii) together
(b)(i)(ii)
M1:
deducing that the first bullet point can be used to :
Either set up a correct numerical expression for b (allow ±)
3.5
implied by ±0.007 or ±
500
or write a correct equation from the first bullet point e.g. 16.5 = a + 2200b
Allow equivalent use of the first bullet point e.g. (20 – 3.5k) =a + (1700 + 500k)b
NB: (±)3.5 = a + 500b is M0
A1:
M1:
–0.007 oe (allow standard form) correct answer scores M1A1.
using the second bullet point with their value of b to find a
Either substituting “their b” into 20 = a + 1700b oe e.g. 20 – “their b” × 1700
or writing the correct equation 20 = a + 1700b oe
A1:
31.9 oe correct answer scores M1A1.
Questi
5(a)
Scheme
[u =] 0.23
(b)
p + q + s + t = 0.55 and r + 0.55 + u = 1
[r =] 0.22
(c)
q + s = 0.18
Marks
AOs
B1
1.1b
(1)
M1
A1
(2)
M1
3.1a
1.1b
2.2a
P(B) = “0.22” + 0.18
P(A) = “0.22” + 0.18 – 0.1 and
P(A and B) = 0.3 × 0.4 = 0.12
M1
2.1
q = 0.12 and s = 0.06
p = 0.18 and t = 0.19
A1
A1
(4)
1.1b
1.1b
(7 marks)
Notes
Mark parts (a), (b) and (c) together
(a)
B1:
0.23 oe
(b)
M1:
For realising P(A) + P(C) = p + q + s + t = 0.55 and r + 0.55 + “their u” = 1
i0.22lioed b “ h i ” “ h i ” 0 45
A1:
(c)
M1:
Writing or using q + s = 0.18 (implied by “their q” + “their s” = 0.18)
implied by P(B) = 0.4
M1:
Use of 4th and 5th bullet points:
For 4th bullet point accept:
• P(A) × P(B) = P(A and B)
• P(A) × P(B) = q (may see substitution of their values)
• (p + q) × (q + r + s) = q (may see substitution of their values)
For 5th bullet point accept:
• P(A) = 0.3 and P(B) = 0.4
• (q + r + s) = (p + q) + 0.1 (may see substitution of their values)
• P(B) = “their r” + 0.18 and P(A) = “their r” + 0.08
Correct values for q and s imply M1M1
A1:
A1:
q = 0.12 oe and s = 0.06 oe
p = 0.18 oe and t = 0.19 oe
Pearson Education Limited. Registered company number 872828
with its registered office at 80 Strand, London, WC2R 0RL, United Kingdom