Further Mathematics · June 2018 · Mark scheme · Paper 28
Edexcel AS Level Further Mathematics mark scheme for Paper 28, June 2018 — 8FM0/28, file 8fm0-28-rms-20180815.pdf.
Text of this paper
Mark Scheme (Results)
Summer 2018
Pearson Edexcel GCE Further Mathematics
AS Further Decision D2 Paper 8FM0_28
Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding body. We provide
a wide range of qualifications including academic, vocational, occupational and specific programmes for
employers. For further information visit our qualifications websites at www.edexcel.com or
www.btec.co.uk. Alternatively, you can get in touch with us using the details on our contact us page at
www.edexcel.com/contactus.
Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help everyone progress in
their lives through education. We believe in every kind of learning, for all kinds of people, wherever
they are in the world. We’ve been involved in education for over 150 years, and by working across 70
countries, in 100 languages, we have built an international reputation for our commitment to high
standards and raising achievement through innovation in education. Find out more about how we can
help you and your students at: www.pearson.com/uk
Summer 2018
Publications Code 8FM0_28_1806_MS
All the material in this publication is copyright
© Pearson Education Ltd 2018
General Marking Guidance
•
•
•
•
•
All candidates must receive the same treatment. Examiners must
mark the last candidate in exactly the same way as they mark the
first.
Mark schemes should be applied positively. Candidates must be
rewarded for what they have shown they can do rather than
penalised for omissions.
Examiners should mark according to the mark scheme not
according to their perception of where the grade boundaries may
lie.
All the marks on the mark scheme are designed to be awarded.
Examiners should always award full marks if deserved, i.e. if the
answer matches the mark scheme. Examiners should also
be prepared to award zero marks if the candidate’s response is not
worthy of credit according to the mark scheme.
Where some judgement is required, mark schemes will provide the
principles by which marks will be awarded and
exemplification/indicative content will not be exhaustive.
EDEXCEL GCE MATHEMATICS
General Instructions for Marking
1. The total number of marks for the paper is 40.
2. The Edexcel Mathematics mark schemes use the following types of marks:
•
•
•
•
M marks: method marks are awarded for ‘knowing a method and attempting to
apply it’, unless otherwise indicated.
A marks: Accuracy marks can only be awarded if the relevant method (M) marks
have been earned.
B marks are unconditional accuracy marks (independent of M marks)
Marks should not be subdivided.
3. Abbreviations
These are some of the traditional marking abbreviations that will appear in the mark
schemes.
• bod – benefit of doubt
• ft – follow through
• the symbol
will be used for correct ft
• cao – correct answer only
• cso - correct solution only. There must be no errors in this part of the question to
obtain this mark
• isw – ignore subsequent working
• awrt – answers which round to
• SC: special case
• oe – or equivalent (and appropriate)
• dep – dependent
• indep – independent
• dp decimal places
• sf significant figures
• The answer is printed on the paper
•
The second mark is dependent on gaining the first mark
4. For misreading which does not alter the character of a question or materially simplify
it, deduct two from any A or B marks gained, in that part of the question affected.
5. Where a candidate has made multiple responses and indicates which response they
wish to submit, examiners should mark this response.
If there are several attempts at a question which have not been crossed out, examiners
should mark the final answer which is the answer that is the most complete.
6. Ignore wrong working or incorrect statements following a correct answer.
7. Mark schemes will firstly show the solution judged to be the most common
response expected from candidates. Where appropriate, alternatives answers are
provided in the notes. If examiners are not sure if an answer is acceptable, they
will check the mark scheme to see if an alternative answer is given for the
method used.
Question
Scheme
Reducing rows
1
P Q
0
A 4
B 3
0
C 0.5 0
D 2.5 1.5
and
R S
4.5 6
5 5.5
0 4.5
0 0.5
Marks
AOs
M1
1.1b
A1
1.1b
M1
1.1b
A1ft
1.1b
A1ft
2.2a
columns
P Q
R S
A 3.5 0 4.5 5.5
B 2.5 0
5 5
0
0 4
C 0
D 2 1.5
0 0
augment by 2.5
A
B
C
D
P Q
R S
1 0
2 3
0 0 2.5 2.5
0 2.5
0 4
2 4
0 0
A – Q, B – P, C – R, D – S
(5 marks)
Notes
M1: simplifying the initial matrix by reducing rows and then columns
A1: cao
M1: develop an improved solution – need to see one double covered +e; one uncovered –e; and one
single covered unchanged. 3 lines to 4 lines needed
A1ft: allow follow through from one numerical slip only during row/column reduction
A1ft: dependent on all previous M marks and one A mark – to deduce the optimal allocation from
the location of the zeros in the table
Question
Scheme
Marks
AOs
2(a)
The gains (or losses) made by one player are exactly balanced by the
losses (or gains) made by the other player.
B1
1.2
(1)
(b)
3
B1
1.1b
(1)
(c)
e.g. if a member of team A gains x points then a member of team B
gains 10 – x points. Subtracting 5 from both gives A: x – 5 and
(10 – x) – 5 = 5 – x. The sum is (x – 5) + (5 – x) = 0
B1
2.4
(1)
(d)
(i) Row minima: –2, –4, –1 max is –1
Column maxima: 0, 1, 3 min is 0
Play safe for Team A is Olive and for Team B is Paul
M1
A1
A1
1.1b
1.1b
1.1b
(ii) Row maximin (–1) ≠ Col minimax (0) so not stable
B1
2.4
(4)
(e)
If B plays strategy 1, A’s gains are –1(1 – p) = p – 1
If B plays strategy 2, A’s gains are p + –4(1 – p) = 5p – 4
If B plays strategy 3, A’s gains are –2p + 2(1 – p) = 2 – 4p
2 – 4p = 5p – 4 ⇒ p =
2/3
Team A should play Mischa with probability 2/3 and Noel with
probability 1/3
M1
A1
1.1b
1.1b
M1
A1
1.1b
1.1b
A1
1.1b
A1ft
3.2a
(6)
(f)
(i) 13/3
B1
1.1b
(ii) 17/3
B1ft
2.2a
(2)
(15 marks)
Notes
(a)
B1: cao - indication that either the losses of one (player) are balanced by the gains of the other
(player) or that the total points scored by both (players) is zero
(b)
B1: cao (3)
(c)
B1: correct explanation – could explain their reasoning using a numerical example
(d)(i)
M1: finding row minimums and column maximums – condone one error
A1: max (row minima) and min (column maxima) correct – dependent on all correct values of row
minimums and column maximums
A1: correct play safes for both teams (Olive (O) and Paul (P))
(d)(ii)
B1: row maximin (–1) ≠ col minimax (0) (so not stable)
(e)
M1: setting up three expressions in terms of p with at least one correct
A1: all three expressions correct
M1: axes correct, at least one line correctly drawn for their expressions
A1: correct graph with consistent scaling (lines must not extend past p < 0 and p > 1)
A1: correct probability expressions leading to correct value of p
A1ft: interpret their value of p in the context of the question – must refer to play and the team
members
(f)(i)
B1: cao
(f)(ii)
B1ft: 10 – their answer to (f)(i)
SC for (d) and (e) for those candidates who do not consider the zero-sum game
For (d) M1 only for finding row minimums (3, 1, 4) and column maximums (5, 6, 8) – condone one
error. Then allow possibility of full marks in (e) – expressions should be p + 4, 5p + 1 and –4p + 7
and the graph should lead to 5p + 1 = –4p + 7
Question
3(a)
Scheme
(i) 170
(ii) 145
Marks
AOs
B1
B1
1.1b
1.1b
(2)
(b)
Deduces the maximum possible flow is ≤ 145 litres per minute
B1ft
2.2a
(1)
M1
2.2a
A1
1.1b
(c)
(2)
(d)
Cut through arcs BA, ED, ET, EF (twice), CF
B1
3.1a
Maximum flow = minimum cut
Flow = 120, Cut = 120 therefore flow of 120 is optimal
B1
2.1
(2)
(e)
0 < x ≤ 25,
flow is 120 + x
x > 25,
flow is 145
M1
A1
A1
3.1a
2.2a
2.3
(3)
(10 marks)
Notes
(a)
B1: cao
B1: cao
(b)
B1ft: deduced from their least value given in (a) - must include ‘less than or equal to’
(c)
M1: deduces that the flow out of SB must equal 120 and that the ‘flow in = flow out’ at all but one
node – one number only required on each arc (condone blank for arc FE)
A1: a correct valid flow through the network (check that flow in must equal flow out at each vertex)
(d)
B1: finds a correct cut through saturated arcs directed from S to T
B1: correct mathematical argument that the maximum flow is 120 - dependent on correct cut and
correct flow in (c) – must state ‘maximum flow = minimum cut’
(e)
M1: understanding that the flow through the system will be different depending on the possible
values of x (this could be shown by either of the flows being stated correctly or by consideration of
the critical value of x = 25)
A1: correct deduction of both possible flows: 120 + x and 145
A1: correct argument (in terms of the correct inequalities) for when the flow is valid for 120 + x and
145
SC in (e) – award M1A1 for one correct flow and interval
Question
4(a)
Scheme
r=2
N = 50
Marks
AOs
B1
B1
3.4
1.1b
(2)
(aux equation m − 1.02 =
0 ⇒) complementary function is A(1.02) n
B1
1.1b
50
Consider a trial solution of the form un = λ so λ − 1.02λ =
...
⇒λ =
M1
1.1b
=
General solution
is un A(1.02) n − 2500
A1
1.1b
n = 1, u1 = 560 ⇒ A= ...
M1
3.4
=
un 3000 (1.02 ) − 2500
A1
1.1b
(b)
n
(5)
(c)
3000 (1.02 ) − 2500 > 3000
n
(1.02 )
n
>
11
11
⇒ n log(1.02) > log
6
6
n > 30.6088... ⇒ n =
31
M1
1.1b
M1
1.1b
A1
1.1b
(3)
(10 marks)
Notes
(a)
B1: cao
B1: cao
(b)
B1: cao
M1: substituting their trial solution into the recurrence relation in an attempt to find their λ
A1: cao for the general solution
M1: using the conditions in the model to calculate A
A1: cao for the particular solution
Alternative approach for (b)
B1: (1.02 ) u0
n
50 (1 − 1.02n )
M1: attempt sum of GP with a = 50 and r = 1.02 un= ... +
1 − 1.02
un (1.02) n (u0 + 2500) − 2500 (or equivalent)
A1: general solution is =
M1: Uses u1 = 560 to find u0 (e.g. 560
... )
= 1.02u0 + 50 ⇒ u=
0
A1: un 3000 (1.02 ) − 2500
=
n
(c)
M1: sets their particular solution greater than 3000 (condone equals) – their particular solution must
(
=
un c (1.02 ) ± d
be of the correct form
n
)
M1: dependent on previous M mark – re-arranging and correctly applies the process of taking logs
for their particular solution
A1: cao (allow correct answer to 3 significant figures or 31)
Pearson Education Limited. Registered company number 872828
with its registered office at 80 Strand, London, WC2R 0RL, United Kingdom