Further Mathematics · June 2019 · Mark scheme · Paper 27
Edexcel AS Level Further Mathematics mark scheme for Paper 27, June 2019 — 8FM0/27, file 8FM0_27_rms_20190815.pdf.
Text of this paper
Mark Scheme (Results)
Summer 2019
Pearson Edexcel GCE Further Mathematics
AS Further Decision 1 Paper 8FM0_27
Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding body. We provide
a wide range of qualifications including academic, vocational, occupational and specific programmes
for employers. For further information visit our qualifications websites at www.edexcel.com or
www.btec.co.uk. Alternatively, you can get in touch with us using the details on our contact us page at
www.edexcel.com/contactus.
Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help everyone progress in their lives
through education. We believe in every kind of learning, for all kinds of people, wherever they are in the world.
We’ve been involved in education for over 150 years, and by working across 70 countries, in 100 languages, we
have built an international reputation for our commitment to high standards and raising achievement through
innovation in education. Find out more about how we can help you and your students at: www.pearson.com/uk
Summer 2019
Publications Code 8FM0_27_1906_MS
All the material in this publication is copyright
© Pearson Education Ltd 2019
General Marking Guidance
•
All candidates must receive the same treatment. Examiners must mark
the first candidate in exactly the same way as they mark the last.
•
Mark schemes should be applied positively. Candidates must be rewarded
for what they have shown they can do rather than penalised for omissions.
•
Examiners should mark according to the mark scheme not according to
their perception of where the grade boundaries may lie.
•
There is no ceiling on achievement. All marks on the mark scheme should
be used appropriately.
•
All the marks on the mark scheme are designed to be awarded. Examiners
should always award full marks if deserved, i.e. if the answer matches the
mark scheme. Examiners should also be prepared to award zero marks if
the candidate’s response is not worthy of credit according to the mark
scheme.
•
Where some judgement is required, mark schemes will provide the
principles by which marks will be awarded and exemplification may be
limited.
•
When examiners are in doubt regarding the application of the mark
scheme to a candidate’s response, the team leader must be consulted.
•
Crossed out work should be marked UNLESS the candidate has replaced
it with an alternative response.
EDEXCEL GCE MATHEMATICS
General Instructions for Marking
1. The total number of marks for the paper is 40.
2. The Edexcel Mathematics mark schemes use the following types of marks:
•
•
•
•
M marks: method marks are awarded for ‘knowing a method and attempting to
apply it’, unless otherwise indicated.
A marks: Accuracy marks can only be awarded if the relevant method (M) marks
have been earned.
B marks are unconditional accuracy marks (independent of M marks)
Marks should not be subdivided.
3. Abbreviations
These are some of the traditional marking abbreviations that will appear in the mark
schemes.
• bod – benefit of doubt
• ft – follow through
• the symbol will be used for correct ft
• cao – correct answer only
• cso - correct solution only. There must be no errors in this part of the question to
obtain this mark
• isw – ignore subsequent working
• awrt – answers which round to
• SC: special case
• oe – or equivalent (and appropriate)
• dep – dependent
• indep – independent
• dp decimal places
• sf significant figures
• The answer is printed on the paper
•
The second mark is dependent on gaining the first mark
4. For misreading which does not alter the character of a question or materially simplify
it, deduct two from any A or B marks gained, in that part of the question affected.
5. Where a candidate has made multiple responses and indicates which response they
wish to submit, examiners should mark this response.
If there are several attempts at a question which have not been crossed out,
examiners should mark the final answer which is the answer that is the most
complete.
6. Ignore wrong working or incorrect statements following a correct answer.
7. Mark schemes will firstly show the solution judged to be the most common
response expected from candidates. Where appropriate, alternatives answers
are provided in the notes. If examiners are not sure if an answer is acceptable,
they will check the mark scheme to see if an alternative answer is given for the
method used.
Question
Scheme
1(a)
Marks
AOs
B1
1.2
(1)
(b)(i)
(b)(ii)
A semi-Eulerian graph contains exactly two nodes of odd order (and
any number of nodes of even order)
e.g. (two semiEulerian subgraphs of
K5 with a different
number of edges)
B1
2.5
B1
B1
1.1b
1.1b
(3)
(c)
1+ 2 + 2 + 3 + 4
= 6 arcs but a
2
tree on five nodes would contain only 4 arcs
e.g. The graph with five vertices has
B1
B1dep
2.2a
2.4
(2)
(6 marks)
Notes
(a)
B1: CAO (give bod for position of nodes)
(b)(i)
B1: CAO (accept ‘there are exactly two odd nodes’ but must contain exact oe (e.g. ‘only two odd
nodes’ or ‘all but 2 nodes have an even order’ but not ‘the graph has two odd nodes’))
(b)(ii)
B1: One correct semi-Eulerian subgraph of K5 with five nodes
B1: Two correct semi-Eulerian subgraphs of K5 with five nodes – note that the graphs must have a
different number of edges
(c)
B1: Deducing that the graph has 6 arcs or a tree on five nodes has 4 arcs or the node of order 4 must
be connected to the other 4 nodes or an argument based on the sum of the orders of both the graph
and the tree (but must relate the orders to the number of arcs and not the number of nodes) or the
node with order 4 and one of the nodes of orders 2 or 3 would create a cycle or a tree must have two
nodes of order 1
B1dep: Complete argument – graph has 6 arcs and the tree would only have 4 arcs or the sum of the
orders is 12 compared to 8 for the tree or the node of order 4 must be connected to the other 4 nodes
therefore all the other vertices would have to have order 1 or the graph has 6 arcs and therefore with
5 vertices there would have to be cycles or the node of order 4 is connected to the other 4 nodes and
so together with the node of order 3 (or 2) a cycle would be formed or a tree must have at least two
nodes of order 1 as otherwise a cycle would be formed
Note: no marks in (c) for attempts based only on examples of graphs drawn with the vertex orders as
stated
Question
Scheme
Marks
AOs
M1
1.1b
A1
1.1b
A1
1.1b
A1
1.1b
(i)
A
B
N
H
C
D
1
3
4
0.5
0.25
0
82
E
F
1
1.5
2(a)
92.125
2
124.125
2.5
202.25
3
(ii) Final output = 50.5625
50.5625
(4)
(b)
∫
3
x 4dx = 48.4
B1
1.1b
50.5625 − 48.4
×100
48.4
M1
1.1a
4.47%
A1ft
3.2b
1
(3)
(7 marks)
Notes
(a)(i)
M1: At least three rows of cells completed (so at least two values of D and E given) with either a
correct first row or 82 found for D – condone repeated values in all columns or a single value in each
row
A1: CAO – the values in the second, third and fourth rows correct (so up to the 92.125 in column D
and the 2 in column E) – accept exact equivalent fractions
A1: CAO – all values correct in columns A to E – accept exact equivalent fractions
(ii)
9
A1: CAO (output = 50.5625) (or equivalent e.g. 50 ) – allow if stated only in column F
16
(b)
B1: CAO (48.4)
M1: Correct method (including multiplying by 100) using candidate’s final output from (a)(ii) and
their value for I
A1ft: Follow through their final output from (a)(ii) (for reference: 4.4679752…) must be using 48.4
- dependent on M mark in (a) and percentage error being < 10% (answer must be given to 3
significant figures)
Question
Scheme
Marks
AOs
M1
1.1b
A1
1.1b
A1
1.1b
A1
1.1b
A1
1.1b
3(a)
(5)
(b)
Activity F (and/or G) requires activity B and the two activities A and
C to be completed before F (and/or G) can begin. The time to
complete A and C is double that of B and so B can be delayed
waiting for A and C to be completed and so B is therefore not critical.
B1
2.4
(1)
(c)
Activities D, E and H
B1
2.2a
(1)
(7 marks)
Notes
In (a) condone lack of, or incorrect, numbered events throughout. ‘Dealt with correctly’ means that
the activity starts from the correct event but need not necessarily finishes at the correct event, e.g. ‘G
dealt with correctly’ requires the correct precedences for this activity, i.e. B and C labelled correctly
and leading into the same node and G starting from that node but do not consider the end node for G.
Activity on node is M0
If an arc is not labelled, for example, if the arc for activity G is not labelled (but the arc is present)
then this will lose the first A mark and the final (CSO) A mark – they can still earn the second A
mark on the bod. If two or more arcs are not labelled then mark according to the scheme. Assume
that a solid line is an activity which has not been labelled rather than a dummy (even if in the corrct
place for where a dummy should be)
(a)
M1: At least eight activities (labelled on arc), one start, and at least two dummies placed
A1: Activities A – G dealt with correctly (bod if no arrow on activity C)
A1: First two required dummies + arrows dealt with correctly
A1: Activities H – K dealt with correctly (A0 if no arrows on preceding dummies (oe))
A1: CSO – Final required dummy + all arrows present and correctly placed with one finish and no
additional dummies. Note that the arrow for the final dummy could be reversed. Note that there are
several correct viable positions for the final dummy
Note that additional (but unecessary) ‘correct’ dummies that still maintain precedence for the
network should only be penalised with the final A mark if earned
(b)
B1: CAO - some mention of the time required to complete A + C compared with B (for the next
activity to begin (either F and/or G)) oe e.g. paths through B have a maximum length of 3 (nondummy) activities and there is at least one path of length 4 which does not include B so B cannot be
critical OR the late time for B must be the same as the late time for A + C which is twice the
duration of B and therefore B is not critical. Give bod to responses that imply that B and C meet at
the same event, but C is also dependent on A (the key point for awarding this mark is that activities
A and C imply that B is not critical)
(c)
B1: All three correct with no extras (ignore any mention of activity B)
Question
Scheme
Marks
AOs
M1
1.1b
A1
1.1b
A1ft
1.1b
A1
1.1b
M1dep
A1
A1
3.1a
2.1
2.2a
4(a)
Attempt to form a pair of simultaneous equations using their three
working values from H
e.g. 3 x + y =
15 or x + y =
9
=
x 3,=
y 6
(7)
(b)
Arcs BC and CD need to be traversed twice
B1
1.1b
(1)
(c)
Vertex C would appear 4 times
B1
2.2a
(1)
(d)
135 + 4(3) + 2(6) + 12 = 171
B1ft
1.1b
(1)
(10 marks)
Notes
(a)
M1: For a larger number replaced by a smaller one in the working value boxes at C, F or G
A1: For all values correct (and in correct order) at A, D, B and C (condone order of labelling starting
at A with 0)
A1ft: For all values correct (and in correct order) at G and F following through from A, D, B and C
A1: For all working values correct at E and H (order of working values must be correct at E but
condone any order of working values at H) however, at H if only one working value is seen e.g. 18
+ 3x + y then both 33 and 24 + x + y must be seen (or clearly implied) in later working for this
mark to be awarded (e.g. 3x + y = 15 and x + y = 9 would imply this). Similarly, if only two
working values seen (e.g. 18 + 3x + y and 33) at H then the third (24 + x + y) must be implied
by later working. Any incorrect working values seen at H though will score A0
M1dep: Forming two equations from the candidate’s three working values at H
(so two of their 18 + 3 x + y = 24 + x + y , 18 + 3 x + y =
33 and 24 + x + y =
33 ) – allow all three
working values stated anywhere in their solution – dependent on previous M mark. Must be a
complete method – so for those finding x from 18 + 3 x + y = 24 + x + y they must also either state or
use one of the other two equations (so candidates must be interacting with all three paths from A to
H)
A1: Two correct equations formed (dependent on correct working values either seen at H or in their
subsequent working) – can be unsimplified but must come from correct working
A1: CAO for x and y (x = 3 and y = 6) – must come from correct working
If all three correct working values at H are seen (either at H or subsequent working) together with
both correct answers (with no other working) then award M1A1A1.
(b)
B1: CAO (arcs BC and CD)
(c)
B1: CAO (4 times)
(d)
B1ft: Follow through only for 135 + 12 + 4x + 2y (for their x and y values provided 7 < x + y < 20
and x and y are positive constants)
Question
5(a)
Scheme
Marks
AOs
B1
3.3
B1
3.3
3y ≥ 2z
B1
3.3
x+ y+z =
1000
B1
3.3
=
z 1000 − x − y substituted into objective and constraints gives
M1
3.1a
A1
A1
1.1b
1.1b
Minimise ( P =) x + 5 y + 4 z
Subject to x ≥
3
( x + y + z )( ⇒ 2 x ≥ 3 y + 3z )
5
Minimise ( P =) y − 3 x ( + 4000 ) subject to
x ≥ 600 and 2 x + 5 y ≥ 2000
(7)
(b)
(i) Using least value of x to find y and z
600 roses, 160 hydrangeas and 240 peonies
(ii) £2360
M1
A1
A1
3.4
3.2a
1.1b
(3)
(10 marks)
Notes
(a)
B1: CAO (for objective) – must contain ‘minimise’ or ‘min’ only (so not ‘minimum’) either when
stated in terms of x, y and z or x and y only
3
3
B1: x ≥ ( x + y + z ) oe – need not be simplified for this mark, accept x ≥ (1000 )
5
5
B1: 3 y ≥ 2 z or any equivalent form (need not be simplified nor integer coefficients for this mark)
B1: x + y + z =
1000 (could be implied by earlier/later working)
M1: Eliminating z from either the objective or both constraints using the constraint x + y + z =
1000
A1: Correct objective in terms of x and y only – condone lack of ‘minimise’
A1: Both constraints correct ( x ≥ 600 and 2 x + 5 y ≥ 2000 - must be integer coefficients for this
mark)
(b)(i)
M1: Using their least value of x to find both y and z (with both y and z being positive integers) –
note that all values must satisfy the constraint x + y + z =
1000 (and must all be integers)
A1: All three types of flowers correct (in context – so not just in terms of x, y and z) – must come
from correct constraints in (a)
(ii)
A1: CAO for cost (condone lack of units but not 2360p) – must come from correct constraints in (a)
SC for (b) – for those candidates with the constraint 2 y ≥ 3 z in (a) leading to 600 roses, 240
hydrangeas and 160 peonies (so not just in terms of x, y and z) together with (£)2440 award SC
M1A1A0 in (b)
Pearson Education Limited. Registered company number 872828
with its registered office at 80 Strand, London, WC2R 0RL, United Kingdom