Mathematics B · January 2013 · Mark scheme · Paper 1

Edexcel International GCSE Mathematics B mark scheme for Paper 1, January 2013 — 4MB0/01, file 4MB0_01_rms_20130307.pdf.

Advertisement
Loading the paper…
Text of this paper

Mark Scheme (Results)
January 2013

International GCSE Mathematics B
(4MB0) Paper 01

Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications come from Pearson, the world’s leading learning
company. We provide a wide range of qualifications including academic, vocational,
occupational and specific programmes for employers. For further information visit
our qualifications websites at www.edexcel.com or www.btec.co.uk for our BTEC
qualifications.
Alternatively, you can get in touch with us using the details on our contact us page
at www.edexcel.com/contactus.
If you have any subject specific questions about this specification that require the
help of a subject specialist, you can speak directly to the subject team at Pearson.
Their contact details can be found on this link: www.edexcel.com/teachingservices.
You can also use our online Ask the Expert service at www.edexcel.com/ask. You
will need an Edexcel username and password to access this service.

Pearson: helping people progress, everywhere

Our aim is to help everyone progress in their lives through education. We believe in every
kind of learning, for all kinds of people, wherever they are in the world. We’ve been
involved in education for over 150 years, and by working across 70 countries, in 100
languages, we have built an international reputation for our commitment to high standards
and raising achievement through innovation in education. Find out more about how we can
help you and your students at: www.pearson.com/uk

January 2013
Publications Code UG034745
All the material in this publication is copyright
© Pearson Education Ltd 2013

General Marking Guidance
All candidates must receive the same treatment. Examiners must mark the
first candidate in exactly the same way as they mark the last.
Mark schemes should be applied positively. Candidates must be rewarded for
what they have shown they can do rather than penalised for omissions.
Examiners should mark according to the mark scheme not according to their
perception of where the grade boundaries may lie.
There is no ceiling on achievement. All marks on the mark scheme should be
used appropriately.
All the marks on the mark scheme are designed to be awarded. Examiners
should always award full marks if deserved, i.e. if the answer matches the
mark scheme.
Examiners should also be prepared to award zero marks if the candidate’s
response is not worthy of credit according to the mark scheme.
Where some judgement is required, mark schemes will provide the principles
by which marks will be awarded and exemplification may be limited.
When examiners are in doubt regarding the application of the mark scheme
to a candidate’s response, the team leader must be consulted.
Crossed out work should be marked UNLESS the candidate has replaced it
with an alternative response.
Types of mark
o

M marks: method marks

o

A marks: accuracy marks

o

B marks: unconditional accuracy marks (independent of M marks)

Abbreviations
o

cao – correct answer only

o

ft – follow through

o

isw – ignore subsequent working

o

SC - special case

o

oe – or equivalent (and appropriate)

o

dep – dependent

o

indep – independent

o

eeoo – each error or omission

No working
If no working is shown then correct answers normally score full marks
If no working is shown then incorrect (even though nearly correct)
answers score no marks.
With working
If there is a wrong answer indicated on the answer line always check the
working in the body of the script (and on any diagrams), and award any
marks appropriate from the mark scheme.

If it is clear from the working that the “correct” answer has been obtained
from incorrect working, award 0 marks.
Any case of suspected misread loses A (and B) marks on that part, but can
gain the M marks.
If working is crossed out and still legible, then it should be given any
appropriate marks, as long as it has not been replaced by alternative work.
If there is a choice of methods shown, then no marks should be awarded,
unless the answer on the answer line makes clear the method that has been
used.
If there is no answer on the answer line then check the working for an
obvious answer.
Follow through marks
Follow through marks which involve a single stage calculation can be awarded
without working since you can check the answer yourself, but if ambiguous
do not award.
Follow through marks which involve more than one stage of calculation can
only be awarded on sight of the relevant working, even if it appears obvious
that there is only one way you could get the answer given.
Ignoring subsequent work
It is appropriate to ignore subsequent work when the additional work does
not change the answer in a way that is inappropriate for the question: eg.
Incorrect cancelling of a fraction that would otherwise be correct.
It is not appropriate to ignore subsequent work when the additional work
essentially makes the answer incorrect eg algebra.
Transcription errors occur when candidates present a correct answer in
working, and write it incorrectly on the answer line; mark the correct answer.
Parts of questions
Unless allowed by the mark scheme, the marks allocated to one part of the
question CANNOT be awarded in another.

4MB0 January 2013
Paper 1
Mark Scheme
1.

23, 29, 31, 37

B1, B1

Total 2 marks

2.

6(3) p(2) 4

(subst.)

p=7

M1

2
Total 2 marks

3.

A1

2

6 2 3, 15 3 5, 27=3 3 3
At least two correct decompositions

M1

270

A1

2

(a) 3

B1

1

(b) 3

B1

1

2
Total 2 marks

4.

2

Total 2 marks

5.

6.

2
Total 2 marks

3,

B1, B1

2.5,

360 112 OR 180 68
248o or S68oW

(o.e)

M1
A1

2

2

Total 2 marks

7.

A correct decomposition of 500 into 2 or more numbers leading
to 10 and “n”
M1
10 5

A1

2

2
Total 2 marks

8.

30

B1

150

B1

2

2

Total 2 marks

9.

(a) 30, 42

(b)

B1,B1 2

Accept…

differences increase by 2
differences are 2,4,6,8,10,12,...
sequence is going up plus 2 then plus 4 then plus 6
(un )n2 n

B1

1

3

Total 3 marks

10.

Sight of -12 (but not for x2 12 )
Accept f (0)

M1

12

f … -12

or [-12,

) or x2 12

12

A1

2

2

Total 2 marks

11.

3d (v 2u)t

(removing denominator)

M1

3d vt

(o.e: isolating term involving u)

M1dep

OR:

2ut
vt
3

d
2
ut
3

OR:

2
ut
3
vt
d
3

v 2u 3
2u

u

(M1)

3d
t

(M1dep)

d
t

(M1)

v

3d vt
2t

(M1dep)

vt 3d
2t

(o.e u

v 3d
)
2 2t

A1

3

3

Total 3 marks

12.

circumference = 2
=

2

6378000
km
1000

12 756

6378000m

M1

(converting metres to km)

M1

OR 12 800

(cao)

A1

3

3

Total 3 marks

13.

(a) 23.95 (o.e. 23

19
)
20

B1

1

(b) 2.395 101 OR 2.395 10

B1 ft 1

(c) 24.0

B1 ft 1

3

Total 3 marks

14.

(a) f, g

B1

1

(b) a, b, c, f, g, h

B1

1

(c) h

B1

1

3
Total 3 marks

15.

(a)

(b)

3
1

1
1

B1

10 7
30 21

1

B2(-1ee) 2

3

Total 3 marks

16.

(a) 42 (cm2)
(b) perp dist

B1
8 = “42”

M1

or perp dist = 7 sin “ ABC ”
perp dist = 5.25 cm

1

(M1)
(awrt)

A1

2

3
Total 3 marks

17.

4x 4 6x 3 (o.e.)

M1

Correctly removing denominators

M1ind

7
8

or

14
16

or -0.875

A1

3

3

Total 3 marks

18.

2

11
1 1
b 1 1
12
3 2

b (1

M1

1 1
11
1 ) 2
3 2
12

b

17 12
6 35

b

34
35

M1dep

(o.e.)

M1dep

(cao)

A1

4

4
Total 4 marks

19.

(a) 262 = 2 AD2 OR

AD
26

sin or cos 45

18.4 cm
(b) Sector ADCP =

A1

1
4

"18.3847..."2

Shaded ABC = "18.3487..."2 72.4 cm2

M1

1
4

2

M1

"18.3847..."2

M1dep
A1

3

5
Total 5 marks

20.

correct attempt at balancing equations

M1

correct decision to add/subtract

M1dep

OR
correct attempt to make x/y the subject

(M1)

Substituting for x (or y)

(M1dep)

x

A1

19

4
Total 4 marks

21.

y 14

A1

(a) 18 x, 16 x

B1

3

B1

(b) "(18 x)" x "(16 x)" "3" 32 (o.e)
x=5

4

2

M1
A1

2

4

Total 4 marks

22.

(a) c = 5

1
4
15
20

(b) |c| =

4

1
2

(subst)

M1

3
4

A1

"( 15)"2 "( 20)"2

M1

|c| = 25

OR 5

A1ft

2

2

4
Total 4 marks

23.

(a)

5000
100
80

M1

£6250
(b)

A1

5000 4300
100
5000

2

M1

14%

4
Total 4 marks

24.

A1

7 3x

2x 5
2 13 „ x

OR

2,

(o.e.)

M1

(o.e.)

M1

x „ 2 12

A1

1, 0, 1, 2

A1

2

4

4

Total 4 marks
Notes:
Both Ms must be collected in order to collect final A mark.
Ignore any weak inequalities (provided right way round)

25.

(a) Prob =

13
20
(b)

1
4

2
5

(o.e)

(0.65, 65%)

25 40
40 25
or
100 99
100 99

M1

A1

2

M1

25 40
40 25
+
(o.e.)
100 99
100 99

M1dep

20
(0.202, 20.2%)
99

A1

3

5

25 40
SC: With replacement 2 (
) M1, M0, A0
100 100

Total 5 marks

26.

(a)

117 3 108 2 118 120 122 123 124
10
117.4 (cm)

(b) 117 (cm)

117 118
or placing data in order
2
117.5 (cm)
(c)

M1
A1

2

B1

1

M1
A1

2

5

Total 5 marks

27.

(a)

AOC 80o

(oe)

OAC 50o

B1

Suitable valid reason (only ONE required)
eg at centre of circle (=2
at circum)
or base angle of isos.
(b)

OCD 90o

B1

(oe)

ADC 100o (Isos. )
Suitable valid reason (only ONE required)
eg betw. tangent and radius
Or sum of quadrilateral

B1

3

B1
B1

B1

3

6

Total 6 marks

28.

(a) perpendicular bisector construction arcs

M1

Locus drawn accurately

A1

2

(b) C labelled and

B1

1

ABC drawn

(c) Arc, rad. 4cm, centre C drawn at least inside
Arc, rad. 6 cm, centre B drawn at least inside

ABC
ABC

M1
M1

Area shaded correctly

29.

A1ft 3
6
Total 6 marks

15
(a) tan BAC =
(o.e)
M1
20

BAC = 36.9o
(b) AB =

A1

202 152

M1

AB = 25 cm

A1

(c) AD = 20 x cos 30 ( = 17.3)

M1

ABD =

1
"17.3" "25" sin(30 "36.9")
2

ABD = 199 cm2

2

2

M1dep
A1

3

7

Total 7 marks

TOTAL FOR PAPER : 100 MARKS
END

Further copies of this publication are available from
Edexcel Publications, Adamsway, Mansfield, Notts, NG18 4FN
Telephone 01623 467467
Fax 01623 450481
Email [email protected]
Order Code UG034745 January 2013

For more information on Edexcel qualifications, please visit our website
www.edexcel.com

Pearson Education Limited. Registered company number 872828
with its registered office at Edinburgh Gate, Harlow, Essex CM20 2JE

Advertisement