Mathematics A · January 2019 · Mark scheme · Paper 1F

Edexcel International GCSE Mathematics A mark scheme for Paper 1F, January 2019 — 4MA1/1F, file 4MA1_1F_msc_20190307.pdf.

Advertisement
Loading the paper…
Text of this paper

Mark Scheme (Results)
January 2019
Pearson Edexcel International GCSE
in Mathematics A (4MA1) Foundation Tier
Paper 1F

Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding
body. We provide a wide range of qualifications including academic, vocational,
occupational and specific programmes for employers. For further information visit
our qualifications websites at www.edexcel.com or www.btec.co.uk. Alternatively, you
can get in touch with us using the details on our contact us page at
www.edexcel.com/contactus.

Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help
everyone progress in their lives through education. We believe in every kind of
learning, for all kinds of people, wherever they are in the world. We’ve been involved
in education for over 150 years, and by working across 70 countries, in 100 languages,
we have built an international reputation for our commitment to high standards and
raising achievement through innovation in education. Find out more about how we
can help you and your students at: www.pearson.com/uk

January 2019
Publications Code 4MA1_1F_1901_MS
All the material in this publication is copyright
© Pearson Education Ltd 2019

General Marking Guidance

All candidates must receive the same treatment. Examiners must mark
the first candidate in exactly the same way as they mark the last.

Mark schemes should be applied positively. Candidates must be
rewarded for what they have shown they can do rather than penalised
for omissions.

Examiners should mark according to the mark scheme not according to
their perception of where the grade boundaries may lie.

There is no ceiling on achievement. All marks on the mark scheme should
be used appropriately.

All the marks on the mark scheme are designed to be awarded.
Examiners should always award full marks if deserved, i.e. if the answer
matches the mark scheme.
Examiners should also be prepared to award zero marks if the
candidate’s response is not worthy of credit according to the mark
scheme.

Where some judgement is required, mark schemes will provide the
principles by which marks will be awarded and exemplification may be
limited.

When examiners are in doubt regarding the application of the mark
scheme to a candidate’s response, the team leader must be consulted.

Crossed out work should be marked UNLESS the candidate has replaced
it with an alternative response.

Types of mark

o M marks: method marks
o A marks: accuracy marks
o B marks: unconditional accuracy marks (independent of M marks)

Abbreviations

o cao – correct answer only
o ft – follow through
o isw – ignore subsequent working
o SC - special case
o oe – or equivalent (and appropriate)
o dep – dependent
o indep – independent
o eeoo – each error or omission
 No working
If no working is shown then correct answers normally score full marks
If no working is shown then incorrect (even though nearly correct) answers
score no marks.
 With working
If there is a wrong answer indicated on the answer line always check the
working in the body of the script (and on any diagrams), and award any
marks appropriate from the mark scheme.
If it is clear from the working that the “correct” answer has been obtained
from incorrect working, award 0 marks.
If a candidate misreads a number from the question. Eg. Uses 252 instead
of 255; method marks may be awarded provided the question has not been
simplified. Examiners should send any instance of a suspected misread to
review.
If working is crossed out and still legible, then it should be given any
appropriate marks, as long as it has not been replaced by alternative work.
If there is a choice of methods shown, then no marks should be awarded,
unless the answer on the answer line makes clear the method that has
been used.
If there is no answer on the answer line then check the working for an
obvious answer.

 Ignoring subsequent work
It is appropriate to ignore subsequent work when the additional work does
not change the answer in a way that is inappropriate for the question: eg.
Incorrect cancelling of a fraction that would otherwise be correct.
It is not appropriate to ignore subsequent work when the additional work
essentially makes the answer incorrect eg algebra.
Transcription errors occur when candidates present a correct answer in
working, and write it incorrectly on the answer line; mark the correct
answer.
 Parts of questions
Unless allowed by the mark scheme, the marks allocated to one part of the
question CANNOT be awarded in another.

Apart from Questions 13(b) and 13(c) (where the mark scheme states otherwise), the correct answer, unless clearly obtained by an
incorrect method, should be taken to imply a correct method.
Question
Working
Answer
Mark
Notes
(a)
36, 73, 89, 138, 219
1
B1
1
(b)

2018

1

B1

(c)

1

B1

(d)

Four thousand three
hundred and nine
700

1

B1

(e)

290

1

B1

148

2

(a)

3

1

M1
A1
B1

(b)(i)

4

1

B1

(b)(ii)

12

1

B1

for 12 or ft from (i) for “4” × 3

(b)(iii)

18

1

B1

for 18 or ft from (i) for “4” × 4.5

(f)
2

4
× 185 or 0.8 × 185 oe
5

oe
eg 100
For a complete method

Question
(a)(i)
3

Working

(a)(ii)

(b)
(c)

Answer
14

Mark
1

B1

Added 4

1

B1

34

1

B1

(59 + 1) ÷ 5 or 59 = 5n – 1 or
4, 9, 14, 19,……, 54, 59 (may start at 34 or 39)

M1
12

4

(a)

Notes

2

4.74 − 1.80 (= 2.94) or 474 – 180 (= 294)

Accept +4, 4 more, jumped
forward by 4, difference = 4 or
sight of 4n – 2
or for 12 × 5 – 1

A1
M1

3
“2.94” ÷ 2 or “294” ÷ 2

M1
£1.47

(b)

dep

A1

2  25  30 or 80 (pence) or 2  0.25  0.30 or
E.g. 10 × 25 + 5 × 30 (= 400)

M1

for method to find total cost of
twice as many apples as oranges
May work in pence or pounds
throughout

5  "0.8" or 500  "80" or 6.25 or
12 × 25 + 6 × 30 (= 480) or 4.8(0)

M1

12

3

A1

Question
(a)
5
(b)

Working

Answer
37

Eg 9, 10, 12, 17, 19, 26, 27, 46
(may be in descending order)

Notes
B1
M1

18
(c)

Mark
1

2

(26  10  17  27  12  19  9  46)  8

20.75

2

for all 8 numbers in order or
17 and 19 identified

A1
M1

for a correct method (condone
missing brackets)

A1

Accept 21 if correct calculation
shown

Question
(a)
6

Working

(b)

(c)

Answer
21 30

Mark
1

9 hours 20
minutes

327
327
 60 oe
oe or
5.5
330

Notes
B1

B2

If not B2 then
award B1 for
…. hours 20 mins
or 9 hours ….. mins
or a duration equivalent to 9hr 20 min
eg. 560 mins

M2

for a complete method
if not M2 then award M1
327
for
oe or 61.6(98113...) or 62
5.3
327
or for
or 0.99(0909...) oe
330

59

3

A1

for 59 – 59.5

Question
(a)
7

Answer
97

Mark
1

B1

(b)

729

1

B1

(c)

19

1

B1

(d)(i)

Working

8

M1

91.21 9.55...

2.46
2.46

(d)(ii)

2

A1

3.9

1

B1

ft if at least 2dp in (i)

M1

for 6e or –10f

A1

do not award if in incorrect attempt at
simplification is seen eg −4ef

M1

for 3 correct terms

6e – 10f oe

(c)

for 9.55(039...) or 2.46 or 91.21
or 3.8 or 3.9 or 3.88 or 3.882

3.8822 (7344)

(a)

(b)

Notes

2

20 x  15  3 x  1
17 x  16

2

A1

SC : B1 for 5x + 20

2 p (2  3q )

2

B2

If not B2 then award B1 for
2(2 p  3 pq ) or p (4  6q )
or 2p(a two term expression)
or x(2 + 3q) where x ≠ 2p

Question
(a)
9

(b)

Working
6

3

2


5
Eg
or 18 and (−)10

Answer

Mark

28

2
A1
M1 for isolating 2p in a correct equation

Eg 2  15  2 p or 2 p  13 oe or
B  3m
p
2
13
oe
2
3
oe
16

10

(a)
(b)

Notes
M1 for correct substitution

2

A1

1

B1

13 × 18 ÷ 3 or 13 × 6

M1
78

2

A1

Question
11

Working

Answer

Mark

Notes

1
2
 70 (=20) or  70 (=14)
5
7

M1

1
2
 70 (=20) and  70 (=14) or 34
5
7

M1

4
 (70  "34") (=16)
9

M1
A1

SC: if no marks awarded, award
B2 for 65

2 1
 17 
 oe  
 or 0.28(57…) + 0.2 (= 0.48(57…)
7 5
 35 

M1

may work in percentages

"17"
 18 
oe    or 1 – “0.48” (=0.514…)
35
 35 
4 18
4
4 18
 " " or
 "0.514" or  " " 70 (  16)
9 35
9
9 35

M1

may work in percentages

M1

may work in percentages

A1

SC: if no marks awarded, award
B2 for 65

16
oe
70

4

Alternative scheme

1

16
oe
70

Question
12

Working
( 1, 5), (0, 3), (1, 1), (2,1), (3, 3), (4, 5)

Answer
Correct line

Mark
3

B3

Notes
for a correct line between x = 1 and x = 4
If not B3 then B2 for
a line segment through at least 3 of

( 1, 5), (0, 3), (1, 1), (2,1), (3, 3), (4, 5)

or
all points correctly plotted
or
a line drawn through (0, 3) and with clear
intention to use gradient of 2
E.g. a line through (0, −3), (0.5, −1)
If not B2 then B1 for
at least 2 correct points stated or plotted
(ignore incorrect points)
or
a line drawn with a positive gradient
through (0, 3) but not a line through
(0.−3) and (2, 0)
or
a line with gradient 2

Question
(a)
13

Working

Answer

e  3e  5e  15

M1

e 2  2e  15

(b)

Mark

2

2

2y 1

5 5
E.g. 5y – 2y = 1 or 3 y  1 or 3 y  1  0
3y 1

or
5 5
5 y  2 y  1 or y 

1
oe
3

3

Notes
for 3 correct terms or
for 4 correct terms ignoring signs or
e 2  2e  k for non-zero k
or ...  2e  15

A1
M1

for a correct first step

M1

for collecting terms in y in a correct
equation

A1

dep on at least M1 for

1
oe
3

e.g. 0.3 , 0.3333…
(c)

( x  6)( x  3) (  0) or

x(x + 6) – 3(x + 6) (=0) or
x(x – 3) + 6(x – 3) (=0)
( x  6)( x  3) (  0) or
for x + 6 = 0 oe and x − 3 = 0 oe
x  6, x  3

3

M1

for ( x  6)( x  3) (  0) or for
(x + a)(x + b) with ab = −18 or a + b = 3

A1

for correct factors

B1

ft
dep on at least M1

Question
14 (a)

Working
1236.5
1236.5 − 1126.5 or 110 or
or 1.09(7647...)
1126.5
1236.5
 100 or 109(.7647...)
or
1126.5

Answer Mark

Notes
M1

1236.5  1126.5
"110"
or
1126.5
1126.5
1236.5
 1236.5 
 1  or 1.09  764...  1 or
 100  100
or 
1126.5
 1126.5 

M1

for method that would result in
9.76… or 0.0976…

A1

for 9.76 - 9.765

M2

if not M2
then award M1 for

or 0.0976(475...)
9.76
(b)

3

1126.5  1.19 oe

19
 1126.5 oe or 214(.035)
100

1341

3

A1

for 1340 – 1342

Question
(a)
15
(b)

Working
0.15  0.26

Answer
0.41 oe

Mark
1

1  (0.15  0.26  0.33) or 1  0.74 (=0.26)

(P(yellow)=)

"0.26" 0.06
or 0.1
2

150  "0.1"

15

4

Notes
B1
M1

can be implied by two values where
P(brown) + P(yellow) = 0.26
(may be seen in table)

M1

for a complete method to find
P(yellow)

M1

independent mark
Award for 150 × p where 0 < p < 1

A1

NB: An answer of

15
scores M3 A0
150

Question
(a)
16

Working

(b)

Triangle at (−2, 2), (−2, 4),
(−1, 4)
Triangle at (−2, 1), (−2, 3),
(−1, 3)

(c)

17

Answer
Mark
Rotation, 90° clockwise, centre
3
B1
( 2, 3)
B1
B1

  62

1

B1

2

B2

Notes
for rotation
90° clockwise or −90o (or 270o anticlockwise)
(centre) ( 2, 3)
−2
Note: Do not accept (
) for centre
3
Award no marks if more than one
transformation explicitly stated (the sight of a
vector is not a second transformation)
eg. moved and then rotated; rotation and
translation
cao
If not B2 then award
B1 for a triangle of the correct size and
orientation or the wrong size but enlarged
correctly from (-4, 2) with a sf other than 0.5
e.g. a triangle at (4, −2), (4, 6), (8, 6)

M2 If not M2 then award M1 for

oe or 56.5(4866 )

π × 62 oe (= 113(.09)) or 36π

2
or 18π
1
 8  (6  1) or 20 oe
2

M1 for the area of the triangle

36.5

4

A1

for 36.5  36.6

Question
(a)
18
(b)

Working

Mark
1
B1

Eg 1.88  10 7 + 3.10  108 + 2.64  108 + 7.18  10 7
or
18 800 000 + 310 000 000 + 264 000 000 + 71 800
000 with at least 3 numbers correct

(c)
19

Answer
71 800 000

Notes

M1

for a complete method
or for digits 6646

for 6.646  108 oe
eg 664 600 000

6.646  108 oe

2

A1

9.88  10 6

1

B1

AB
12.6
( AB )12.6 tan 20 or 4.58(602...) or 4.6

M1

or for AD = 12.6/cos20 (=13.4..)
and 12.62 + AB2 = 13.42

M1

or for ( AB  ) 13.4 2  12.6 2

( BC 2 )19.32  12.6 2 or 372.49  158.76 or
213(.73)

M1

( BC  ) 19.32  12.6 2 or

M1

tan 20 

"213.73" or 14.6(195...)

19.2

5

A1

for 19.19 – 19.21

Question
20

Working

Answer

Mark

20
8
oe or 2.5 oe or
oe or 0.4 oe
8
20

Eg 6.4 

20
 6.4
8

or

CE  6.4 

8
 6.4
20

22.4

3

M1

Notes
for a correct scale factor

M1

for a complete method to find BE

A1

Advertisement