Statistics · June 2023 · Mark scheme · Unit 1

Edexcel IAL Statistics mark scheme for Unit 1, June 2023 — WST01/01, file wst01-01-rms-20230817.pdf.

Advertisement
Loading the paper…
Text of this paper

www.dynamicpapers.com

Mark Scheme (Results)
Summer 2023
Pearson Edexcel International Advanced
Level
In Statistics S1 (WST01)
Paper 01

www.dynamicpapers.com
Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding
body. We provide a wide range of qualifications including academic, vocational,
occupational and specific programmes for employers. For further information visit our
qualifications websites at www.edexcel.com or www.btec.co.uk. Alternatively, you can
get in touch with us using the details on our contact us page at
www.edexcel.com/contactus.

Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help everyone
progress in their lives through education. We believe in every kind of learning, for all
kinds of people, wherever they are in the world. We’ve been involved in education for
over 150 years, and by working across 70 countries, in 100 languages, we have built an
international reputation for our commitment to high standards and raising achievement
through innovation in education. Find out more about how we can help you and your
students at: www.pearson.com/uk

Summer 2023
Question Paper Log Number 72904
Publications Code WST01_01_2306_MS
All the material in this publication is copyright
© Pearson Education Ltd 2023

www.dynamicpapers.com
General Marking Guidance
•

All candidates must receive the same treatment. Examiners must mark the
first candidate in exactly the same way as they mark the last.

•

Mark schemes should be applied positively. Candidates must be rewarded
for what they have shown they can do rather than penalised for omissions.

•

Examiners should mark according to the mark scheme not according to
their perception of where the grade boundaries may lie.

•

There is no ceiling on achievement. All marks on the mark scheme should
be used appropriately.

•

All the marks on the mark scheme are designed to be awarded. Examiners
should always award full marks if deserved, i.e. if the answer matches the
mark scheme. Examiners should also be prepared to award zero marks if
the candidate’s response is not worthy of credit according to the mark
scheme.

•

Where some judgement is required, mark schemes will provide the
principles by which marks will be awarded and exemplification may be
limited.

•

Crossed out work should be marked UNLESS the candidate has replaced it
with an alternative response.

www.dynamicpapers.com
General Instructions for Marking
The total number of marks for the paper is 75.
Edexcel Mathematics mark schemes use the following types of marks:
‘M’ marks
These are marks given for a correct method or an attempt at a correct method.
In Mechanics they are usually awarded for the application of some mechanical
principle to produce an equation, e.g. resolving in a particular direction; taking
moments about a point; applying a suvat equation; applying the conservation of
momentum principle; etc.
The following criteria are usually applied to the equation.
To earn the M mark, the equation
(i) should have the correct number of terms
(ii) each term needs to be dimensionally correct
For example, in a moments equation, every term must be a ‘force x distance’
term or ‘mass x distance’, if we allow them to cancel ‘g’ s.
For a resolution, all terms that need to be resolved (multiplied by sin or cos)
must be resolved to earn the M mark.
‘M’ marks are sometimes dependent (DM) on previous M marks having been
earned, e.g. when two simultaneous equations have been set up by, for
example, resolving in two directions and there is then an M mark for solving the
equations to find a particular quantity – this M mark is often dependent on the
two previous M marks having been earned.
‘A’ marks
These are dependent accuracy (or sometimes answer) marks and can only be
awarded if the previous M mark has been earned. e.g. M0 A1 is impossible.
‘B’ marks
These are independent accuracy marks where there is no method (e.g. often
given for a comment or for a graph).
A and B marks may be f.t. – follow through – marks.
General Abbreviations
These are some of the traditional marking abbreviations that will appear in the
mark schemes:
• bod means benefit of doubt
• ft means follow through
o the symbol will be used for correct ft
• cao means correct answer only
• cso means correct solution only, i.e. there must be no errors in this part of
the question to obtain this mark
• isw means ignore subsequent working

www.dynamicpapers.com
•
•
•
•
•
•
•
•
•

awrt means answers which round to
SC means special case
oe means or equivalent (and appropriate)
dep means dependent
indep means independent
dp means decimal places
sf means significant figures
* means the answer is printed on the question paper
means the second mark is dependent on gaining the first mark

All A marks are ‘correct answer only’ (cao.), unless shown, for example, as A1 ft
to indicate that previous wrong working is to be followed through. After a
misread however, the subsequent A marks affected are treated as A ft, but
manifestly absurd answers should never be awarded A marks.
For misreading which does not alter the character of a question or materially
simplify it, deduct two from any A or B marks gained, in that part of the question
affected.
If a candidate makes more than one attempt at any question:
• If all but one attempt is crossed out, mark the attempt which is NOT
crossed out.
• If either all attempts are crossed out or none are crossed out, mark all the
attempts and score the highest single attempt.
Ignore wrong working or incorrect statements following a correct answer.

www.dynamicpapers.com
Qu
1(a)

Scheme
eg 60 people = 1.5 large squares/6 medium squares/150 small squares or

Marks

eg 1 person = 0.025 large squares/0.6 medium squares/2.5 small squares or
eg [1 small square =] 0.4 people/[1 medium square =] 10 people/[1 large square =] 40 people

B1

eg a correct f.d. eg 60/(20 – 10) [= 6]
eg a correct frequency, 100, 70, 20, 24 associated with the appropriate bar

8
15
40
30
 20 or
 24 or 8  2 or 0.8 15 or
or
or 8  5  0.4
10
30
2.5
2.5
2 15  0.4 or 16 or 12 or 70  0.4

eg

28 people
(b)

Median = [5] +

A1
(3)

5
5
 37 or [10] −  33
70
70

= 7.642...
(c)

(b)

(c)

awrt 7.64

"3255"
274

A1
(2)
M1
dM1

= 11.879…

(a)

M1

 midpoint  freq = 2.5  100 + 7.5  70 + 15  60 + 25  20 + 45  24= 3255
Mean =

M1

A1
(3)
Notes
Total 8
B1: for finding a ratio between people and area. Allow just the numbers for 1 person or for 1 square ie
0.025, 0.6, 2.5, 0.4, 1.66 or 40 or
calculating f.d. for any bar correctly, fd = 20, 14, 6, 2 or 0.8
Information may be seen on diagram. Must be clear it is a fd either by correct use, seen on axes
associated with correct bar or stated as an fd. May be implied by M1
M1: for a correct method to find the number of people between 22 and 30 km or 30 and 45 km or
between 22 and 45 km
A1: 28
NB An answer of 28 gains 3/3 unless from obvious incorrect working
5
Q − n 137 − 100
n − Q2 170 − 137
33
 37 or 2
M1: Allow equivalent for n +
or n −  5 or
oe
=
=
5
170 − 100
70
5
170 − 100
70
Q − 5 137 − 170
=
Allow alternative methods eg 2
10 − Q2 170 − 137
Allow 37.5 for 37, 137.5 for 137, 32.5 for 33
107
215
A1: awrt 7.64 or
or allow awrt 7.68 or
if using n + 1 Allow awrt 7640 m or 7680 m but must
28
14
have units.
M1: Attempt at correct expression for  midpoint  freq - at least 3 products with correct midpoints
added with at least 1 of these products fully correct . Allow for 3255
M1: dep on M1 being awarded for dividing “their sum” by 274
A1: awrt 11.9 or

3255
274

Allow awrt 11900 m but must have units

awrt 11.9

www.dynamicpapers.com
Qu
2(a)

(b)

Scheme
297.8  114.8
Stw = 2304.53 −
15
Stw = 25.367...
Sww = 176.797

r=

or

Sww

M1
awrt 25.4
awrt 177

"25.367"
5.3173  "176.797..."
awrt 0.827 or 0.828

"25.367..."
 = 4.77065...
5.3173
297.8 "25.367" 114.8
a=
−

= −16.658 
15
5.3173
15
b = 4.771 or better or a = –16.66 or better seen and w = −16.7 + 4.77t *
b=

(d)

[On average,] for each cm/1 cm of tail length/t the weight/w increases by 4.77 g/grams

(e)

w = −16.7 + 4.77  2  = −7.16 or 4.77  2  = 9.54 or t =

16.7
 = 3.5 or sd = awrt 0.6
4.77
 w = − 7.16 or 9.54 < 16.7 or 2 < 3.5 which is negative/weight cannot be negative
or for sd extrapolation since a 2 cm tail is (approx 9 sd)/(more than 3 sd) from the mean

(f)

0.827

(g)

2 y + 10 = −16.7 + 4.77 ( x + 6 ) oe

Notes
(a)

(b)
(c)

(d)

(e)

(f)
(g)

A1
A1
(3)
M1

= 0.82735….
(c)

Marks

297.82
= 6089.12 −
15

A1
(2)
M1
M1
A1*cso
(3)
B1
(1)
M1
A1
(2)
B1ft
(1)
B1ft
(1)
Total 13

M1 for a correct expression for Stw or Sww
A1 awrt 25.4
A1 awrt 177
M1 for a valid attempt at r with their Stw not equal to 2304.53 and Sww not equal to 6089.12
A1 (M2 on epen) awrt 0.827 or awrt 0.828
1st M1 for a correct method to find the value of b
2nd M1 ft their b. For a correct method to find a. Minimum shown
a = awrt 19.9 − "their b " awrt 7.65  = −16.658
A1* Both method marks must be awarded, equation stated (no fractions) and sight of (4.771 or better)
or (−16.66 or better)
B1 For a suitable contextual comment that implies that as length increases by 1 cm weight increases by
4.77g. Allow multiples eg each 10 cm increase in tail length weight increases by 47.7g Allow in terms
of t and w
M1 for a correct method to calculate the value of w (condone if written as a fraction) or
4.77  2  = 9.54 or correct method to find tail length when w = 0 or sd = awrt 0.6
A1 Method mark must be awarded. For –7.16 or 9.54 < 16.7 or 2 < 3.5 with a relevant explanation
stating that weight is negative. If sd = awrt 0.6 is given allow extrapolation since a 2 cm tail is (approx
9 sd)/(more than 3 sd) from the mean.
B1ft follow through their answer to (b)
−16.7 + 4.77( x + 6)
B1 ISW no need to be simplified. Allow equivalent eg y =
− 5 The correct
2
simplified equation is y = 2.385 x + 0.96 allow awrt 2.39 and 0.96 – 0.98

www.dynamicpapers.com
Qu
3(a)

Scheme
 l =  3711 + 81 600  = 52311

3711
 x =
 = 45.814...
81

 l =  "45.814..."+ 600

 l = 

Marks
M1

"52311"
81

 l =  645.81...

M1
awrt 646

A1
(3)

(b)

2

475181  3711 
−
  = 3767
81
 81 
= 3767.43...   l 2 = 3767.43...

2
 x = 

 Var( L) =

34088381  "52311" 
−

81
 81 

= 3767.43…

(c)

40

(d)

IQR = 5400 – 3800 [= 1600]
5400 + 1.5  "1600" [= 7800] or 3800 − 1.5  "1600" [= 1400]
7800 > 7700 and 1400 < 1600 therefore there are no outliers

(a)

2

M1

awrt 3770

A1
(2)
B1cao
(1)
M1
M1
A1
(3)
Total 9

Notes
M1 for a correct method to find x or  l Allow 45.8 or better. Ignore labels
M1 for a correct method to find l ft their x if it is clearly labelled or it comes from
their

 l if it is clearly labelled or comes from 3711 + 81 600

3711
or ft
81

17437
52311
or
oe
27
81
M1 correct method to find Var (X) implied by awrt 3770 or a correct method to find Var (L) ft their
 l or Allow calculation of sd  x  = awrt 61.4 Ignore labels
A1 awrt 646 or

(b)

A1 awrt 3770 labelled clearly as Var(L) or Var (L) = Var(X) or  l =  x stated or variance is not
2

(c)
(d)

34088381  "52311" 
−
changed by coding is stated or they have gained the answer from

81
 81 
B1 cao
M1 correct method to find IQR. May be implied by a correct limit.
NB 1.5  (5400 − 3800) = 2400
M1 for a correct method to find the upper or the lower outlier boundary.
A1 both 7800 and 1400 correct and 7700 and 1600 (as the minimum not IQR) seen and explicitly
stating no outliers

www.dynamicpapers.com
Qu
4(a)

Scheme

Marks

B1B1

(b)

0.3  "0.98"
= 0.294

(c)

( 0.3  0.02 ) + ("0.45" "0.04") + ("0.25" "0.06")
= 0.039

(d)

"0.25" "0.06"  0.015 
 = "0.039" 
"0.039"
5
= 0.3846… or
13

P ( C Red ) =

Notes

(a)
(b)
(c)
(d)

(2)
M1
A1
(2)
M1
A1
(2)
M1,M1
A1
(3)
Total 9

B1 for 0.45, 0.25 and 0.98 Allow fractions
B1 0.04, 0.96 and 0.06, 0.94 Allow fractions
M1 may ft their tree diagram if method shown 0.3 × " their 0.98"
A1 0.294 oe
M1 may ft their tree diagram if method shown
A1 0.039 oe
M1 allow

p
p
or
where 0 < p < 1 and p < denominator and their (c) is a
"their part (c)"
0.039

probability or
allow

"0.25" "0.06"
0.015
or
where 0 < q < 1 and q > numerator
q
q

"0.25" "0.06"
ft their tree diagram and their part(c) if all 3 figures shown in
"0.039"
working. We will condone num > denom
A1 awrt 0.385
NB if correct ft on numerator and denominator leads to “num” > “denom” then max score
is M0M1A0
M1 for

www.dynamicpapers.com
Qu
5(a)

(b)

Scheme
P(Y = y)

2k

k

k

8k

17k

Marks

k

M1

1 *
2k + k + k + 8k + 17k + k = 1 or 30k = 1  k = 30

A1*

k + k + 8k or 1 − (2k + 17k + k )

M1

(2)

= 13 oe
(c)

awrt 0.333

(1 2k ) + ( 2  k ) + ( 3  k ) + ( 4  8k ) + ( 5  17 k ) + ( 6  k )

(2)
=

M1

13 oe
3
(d)

P (Y

[ P (Y

awrt 4.33

=

A1
(2)

15 − 2Y ) or [X =] 13 11 9 7 5 3 only or [Y =] 5 or 6 only

5 ) = P (Y = 5 ) + P (Y = 6 ) ] =

A1

M1

"17" "1"
+
30 30

M1

3 oe
5

A1ft
(3)

(e) Var (X) = 4Var(Y)

[E(Y 2 ) =](1 2k ) + (22  k ) + (32  k ) + (42  8k ) + (52 17k ) + (62  k ) = 302
15 or awrt 20.1

(

)

2
[Var (Y ) =]" 302 "− " 13 "  = 61 or awrt 1.36 
15
3
 45

Var (X ) =

M1
M1
M1d

244 oe
45

awrt 5.42

A1

st

ALT for 1 3 marks
[E(X) =]

(4)

(13  2k ) + (11 k ) + (9  k ) + (7  8k ) + (5 17k ) + (3  k ) = 19
3 or

awrt 6.33


[E(X ) =](13  2k ) + (11  k ) + (9  k ) + (7  8k ) + (5 17k ) + (3  k ) = 683
15 or awrt 45.5
2

2

2

(

)

2
[Var ( X ) =]" 683
"− " 190
"
15
30

(a)

2

2

2

2

M1
M1
M1d

Notes
Total 13
M1 for finding the probabilities in terms of k. The individual probabilities must be seen either in a table
or in the calculation (but do not need to be simplified)
A1* Method mark must be awarded. For a correct equation which would lead to k = 1 30 *

( )

(b)

(c)

1 + 1 + 1 + 8 1 + 17 1 + 1 = 1
NB Verification - 2 30
( 30 ) ( 30 ) ( 30 ) ( 30 ) ( 30 ) gains M1 A0
M1 for using P(Y = 2) + P(Y = 3) + P(Y = 4) or 1 − P(Y = 1) + P(Y = 5) + P(Y = 6) Allow in terms of k or
with k = 1 30 subst or with their probabilities. Do not allow in terms of y
A1 awrt 0.333
M1 for using  xP( x) At least 3 terms given Allow with k = 1 30 subst or ft their probabilities.

A1 awrt 4.33
(d) M1 forming correct inequality in Y or 13,11,9,7,5,3 seen anywhere or for 5 and 6 only. Implied by 2nd M1
M1 finding their P (Y = 5 ) + their P (Y = 6 ) or P ( X = 5 ) + P ( X = 3) eg 17k + k
A1ft ft their probabilities
(e) M1 written or used 4Var(Y) (may come at the end of the calculation) or written or used E(X) allow awrt
2
6.33 NB condone −2 Var(Y ) if used 4Var(Y)
2
2
M1 Correct method, at least 3 products correct, to find E(Y ) or E(X ) condone incorrect labels

M1d dep on the 2nd M mark being awarded. For correct use of E(Y 2 ) − [E(Y )]2 or E(X 2 ) − [E( X )]2 For
the ALT In addition to the 2nd M1 the 1st M1 must be awarded. Condone incorrect labelling
A1 awrt 5.42

www.dynamicpapers.com
Qu
6(a)
(b)

Scheme
0.6

P ( A  B)
0.1
0.25 = 0.1 + P ( B ) − "0.03" or 0.25 = 0.1 + P ( B ) − P ( A  B )

 P ( A  B ) =  0.1 0.3 or 0.3 =

0.25 = 0.1 + P ( B ) − 0.03 or 0.3 =

P ( B ) − 0.15
 P(B) = 0.18*
0.1

Marks
B1
(1)
M1
M1
A1*
(3)

(c)

M1
M1
B1ft
B1ft
A1

Notes
(a)
(b)

(5)
Total 9

B1cao

P ( A  B)
with 0.1 and 0.3 substituted. Allow for 0.1  0.3 seen
P( A)
M1 0.25 = 0.1 + P ( B ) − p where 0  p  1 or p = P ( A  B ) oe eg 0.25 − 0.1 + p = P ( B ) (allow
M1 for use of P ( B | A) =

any letter for P(B))
A1* P(B) = 0.18 depends on both previous M marks for a fully correct equation in terms of P(B)
(allow any letter for P(B)) followed by P(B) = 0.18
NB 0.03 used/stated with no working could get M0M1A0
Using P ( A  B ) = 0.1 P( B) then they get M0M0A0
Verification could get M1M1A0
M1 for 0.1  0.3
M1 for 0.25 − 0.18 − 0.1 = −0.03 or 0.3 =
(c)

0.18 − 0.15
or 0.25 = 0.1 + 0.18 − P ( A  B )
0.1

M1 for 3 circles as per either diagram. If using Diagram 2 we must see exactly 2 zeros in one of the
intersections (as shaded). (Do Not accept blank or dash instead of 0) Condone missing rectangle.
Ignore labels
M1 for 0.09 and 0.41 marked correctly in diagram – condone incorrect/no label but must be in the
left or right hand circles in 1st diagram or must have zeros (condone blank or dash) in the 2 other
regions of the circle if in 2nd diagram
B1ft their "0.03" in correct place on diagram. Correct label required
B1ft for 0.34 or ft 0.75 – "their 0.41" where their 0.41  0.5 No other ft accepted. Do not allow
0.75
A1 fully correct Venn diagram including the rectangle and all 3 labels.
SC no labels could get M1M1B0B1A0 if using 3 intersecting circles must have blanks or 0 for the
2nd M1

www.dynamicpapers.com
Qu
7(a)(i)

(ii)

Scheme

Marks

510 − 500 

P ( J  510 ) = P  Z 
 or P(Z > 0.4)
25


= 1 – 0.6554  0.3446 *

M1
A1*
(2)

d − 500
= −1.4 (calc –1.3997…)
25

M1B1

d = 465 (calc 465.007)
(b)

(1 − 0.3446 )

dA1
(3)

5

M1

= 0.1209…
(c)

r − 520
= −1.0364
k
3r − 800 − 520
= 2.5758
k
−240 = ( 3  − "1.0364k ") − "2.5758" k or

k = 42.216...
r = 476.246...

(a)(i)
(ii)

awrt 0.121

M1A1
M1A1

r − 520
3r − 1320
oe
=
"− 1.0364" "2.5758"
awrt 42
awrt 476

(c)

ddM1
A1
dA1
(7)
Total 14

Notes
M1 for standardising using 500 and 25. Allow for 0.4
A1* M1 must be awarded. For 1 – 0.6554 = 0.3446 or using calc 0.34457… = 0.3446 or better
M1 correct standardisation using 500 and 25 equated to a z value where 1  z  2
B1 correct expression with compatible signs eg

(b)

A1
(2)

500 − d
= 1.4 (calc 1.3997…) or allow incompatible
25

signs with 500 − ("535"− 500)
510 − d
SC
= 1.4 (calc 1.3997…) can get M0B1A0
25
dA1 dependent on M1 awarded for 465 or 465.007...
5
M1 for ( p ) where 0 < p < 1

A1 awrt 0.121
r − 520
M1
= z value where |z| > 1
k
r − 520
1st A1
= awrt − 1.0364 (calc 1.036433... ) (signs must be compatible)
k
3r − 800 − 520
2nd M1
= z value where |z| > 2
k
3r − 800 − 520
2nd A1
= awrt 2.5758 (calc 2.5758293…) (signs must be compatible)
k
3rd M1 (dep on both Ms) for forming a correct equation in k or r only using their z values. ISW once
3 ( −1.0364k + 520 ) − 800 − 520
= 2.5758 Implied by r
correct equation seen eg –5.685k = –240 or
k
and k correct
3rdA1 for awrt 42
4th A1 for awrt 476 Must come from equations with compatible signs
NB awrt 476 and awrt 42 does not mean full marks. They could get M1A0M1A0 M1A1A1 if they do
not have accurate z values

www.dynamicpapers.com

Pearson Education Limited. Registered company number 872828
with its registered office at 80 Strand, London, WC2R 0RL, United Kingdom

Advertisement