Statistics · October/November 2020 · Mark scheme · Unit 2
Edexcel IAL Statistics mark scheme for Unit 2, October/November 2020 — WST02/01, file WST02_01_msc_20210113.pdf.
Text of this paper
http://britishstudentroom.wordpress.com/
Mark Scheme (Results)
October 2020
Pearson Edexcel International A Level
in Statistics S2 (WST02/01)
http://britishstudentroom.wordpress.com/
Edexcel and BTEC Qualifications
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding body. We provide a wide range of
qualifications including academic, vocational, occupational and specific programmes for employers. For further
information visit our qualifications websites at www.edexcel.com or www.btec.co.uk. Alternatively, you can get in touch
with us using the details on our contact us page at www.edexcel.com/contactus.
Pearson: helping people progress, everywhere
Pearson aspires to be the world’s leading learning company. Our aim is to help everyone progress in their lives through
education. We believe in every kind of learning, for all kinds of people, wherever they are in the world. We’ve been involved
in education for over 150 years, and by working across 70 countries, in 100 languages, we have built an international
reputation for our commitment to high standards and raising achievement through innovation in education. Find out more
about how we can help you and your students at: www.pearson.com/uk
October 2020
Publications Code WST02_01_2010_MS
All the material in this publication is copyright
© Pearson Education Ltd 2020
http://britishstudentroom.wordpress.com/
General Marking Guidance
•
All candidates must receive the same treatment. Examiners must mark the first candidate in
exactly the same way as they mark the last.
•
Mark schemes should be applied positively. Candidates must be rewarded for what they have
shown they can do rather than penalised for omissions.
•
Examiners should mark according to the mark scheme not according to their perception of
where the grade boundaries may lie.
•
There is no ceiling on achievement. All marks on the mark scheme should be used
appropriately.
•
All the marks on the mark scheme are designed to be awarded. Examiners should always award
full marks if deserved, i.e. if the answer matches the mark scheme. Examiners should also be
prepared to award zero marks if the candidate’s response is not worthy of credit according to the
mark scheme.
•
Where some judgement is required, mark schemes will provide the principles by which marks
will be awarded and exemplification may be limited.
•
Crossed out work should be marked UNLESS the candidate has replaced it with an alternative
response.
http://britishstudentroom.wordpress.com/
EDEXCEL IAL MATHEMATICS
General Instructions for Marking
1. The total number of marks for the paper is 75.
2. The Edexcel Mathematics mark schemes use the following types of marks:
•
•
•
•
M marks: method marks are awarded for ‘knowing a method and attempting to apply it’, unless otherwise
indicated.
A marks: Accuracy marks can only be awarded if the relevant method (M) marks have been earned.
B marks are unconditional accuracy marks (independent of M marks)
Marks should not be subdivided.
3. Abbreviations
These are some of the traditional marking abbreviations that will appear in the mark schemes.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
bod – benefit of doubt
ft – follow through
the symbol will be used for correct ft
cao – correct answer only
cso - correct solution only. There must be no errors in this part of the question to obtain this mark
isw – ignore subsequent working
awrt – answers which round to
SC: special case
oe – or equivalent (and appropriate)
dep – dependent
indep – independent
dp decimal places
sf significant figures
The answer is printed on the paper
The second mark is dependent on gaining the first mark
4. All A marks are ‘correct answer only’ (cao.), unless shown, for example, as A1 ft to indicate that previous wrong
working is to be followed through. After a misread however, the subsequent A marks affected are treated as A ft,
but manifestly absurd answers should never be awarded A marks.
5. For misreading which does not alter the character of a question or materially simplify it, deduct two from any A
or B marks gained, in that part of the question affected.
6. Ignore wrong working or incorrect statements following a correct answer.
http://britishstudentroom.wordpress.com/
Question
Number
1 (a)
Scheme
∫
2
1
Marks
1
1]
k x 3 − 3 x 2 + ax + 1 dx [ =
2
M1
2
1
1
k x 4 − x3 + ax 2 + x [ =
1]
2
8
1
1
1
k ( 2 − 8 + 2a + 2 ) − k − 1 + a + 1 =
1
2
8
33
3
8*
− k + ka =
1 ∴ k (12a − 33) =
8
2
(b)
6 ± 62 − 4 ×1.5 × 5
3
x= 2 −
M1
A1
dM1
A1*
(b)
or
1 1
k ( 2a − 4 ) − k + a =
1
8 2
dM1
A1 *
(4)
df ( x)
3
= k x2 − 6x + a
dx
2
4 2 16
40
3 2
x − x+
=
0
0 or
x − 6x + 5 =
9
9
27
2
x=
1(a)
A1
M1
dM1
M1
6
oe or 1.183...
3
M1
dM1
M1
awrt 1.18
(4)
Notes
Total 8
n
n +1
Attempting to integrate f(x), (at least one term x → x ). Ignore limits. No Need to equate to 1
Fully correct integration. Allow not simplified. Ignore limits and accept any letters. Allow + C
No Need to equate to 1
Dep on 1st M1. Subst in correct limits, subtracting results and equate to 1 Allow if they have +
C the use of F(2) = 1 and F(1) = 0 to form 2 equations and solve to eliminate + C
Answer is given. Correct solution only. At least one correct line of working required between
1 1
k ( 2a − 4 ) − k + a =
1 and the final given answer.
8 2
Attempting to differentiate f(x), (at least one term x n → x n −1 ). Condone missing k or incorrect
value for k
Dependent on first Method mark being awarded. Putting their differential (or multiple of) = 0
May be implied by awrt 1.18 or awrt 2.82
Correct method for solving their 3 term quadratic equation. May be implied by awrt 1.18 or
awrt 2.82 Minimum for method if final answer is incorrect is of the form
A1
A1
6± 6
3
Allow equivalent exact answer. awrt 1.18 Must eliminate the 2.816… or clearly indicate which
of the 2 solutions is their answer
http://britishstudentroom.wordpress.com/
Question
Number
2(a)
(b)
(c)
(d)
(e)
(f)
Scheme
1
f ( w) = 8
0
Marks
−1.4 < w < 6.6
M1
A1
otherwise
(2)
E (W ) = 2.6 oe
B1
(1)
1
(1.6 − α ) × " " =
0.35
8
α = −1.2 oe
M1
A1cso
1
P(1.2 < W < 2.4) = (2.4 − 1.2) × " "
8
3
=
or 0.15 oe
20
0.4 × " 1 "
8
P (W > 2 1.2 < W < 2.4 ) =
"0.15"
1
=
3
(2)
M1
A1ft
(2)
M1
awrt 0.333 A1
The random variable Y is the number of days the train is between 1.2 minutes and 2.4 minutes
late Y~ B ( 40, "0.15")
(2)
M1
P(Y ≥ 10) =
1 − P(Y ≤ 9) or 1 – 0.9328
M1
awrt 0.0672 A1
(3)
Notes
Total 12
≤
where
p
is
a
probability
allow
use
of
instead
p −1.4 < w < 6.6
pdf of the form [ f ( w) = ]
of one/both < signs. Allow equivalent for the 0
otherwise
0
otherwise. Allow any letter/mix of letters
Fully correct allow use of ≤ instead of one/both < signs. Allow any letter but must be consistent.
2.6 oe
7 2.8
α 1.6 − "2.8"
=
setting up equation (1.6 − α ) × "their p " =
and =
0.35 with 0 < p < 1 or
20 8
or F(1.6) – F(α) = 0.35 using their F(w) in the form bw + c where 0 < b < 1
= 0.0672
2(a)
M1
(b)
A1
B1
(c)
M1
Allow for
A1 cso
(d)
M1
(e)
M1
A1
(f)
M1
M1
A1
"their f ( w)"dw = 0.35 oe with an attempt to integrate (at least one term correct).
If using F(1.6) – F(α) = 0.35 then F(w) must be correct. Allow different letters
1
(2.4 − 1.2) × "their p " where "their " is a probability or F(2.4) – F(1.2) using their F(w) in the
8
form bw + c where 0 < b < 1 Implied by 0.15
Allow for
A1ft
1.6
∫α
∫
2.4
1.2
"their f ( w)"dw with an attempt to integrate (at least one term correct).
Ft their p as long as the answer is a probability
0.4 × "their 1 "
8 or 0.4 implied by 1 Allow for 2.4 "their f ( w)"dw with an attempt to integrate
∫2
"1.2"
"their (d)"
3
(at least one term correct) for numerator
Allow 0.3 or 0.33
Writing or using B(40, " their 0.15") Implied by mean of 40 × "their (d)"
9.5 or 9 − "their mean"
Writing or using 1 − P(Y ≤ 9) Allow for 1 − P z
"their sd"
awrt 0.0672
http://britishstudentroom.wordpress.com/
Question
Number
3(a)(i)
Scheme
X B(10, 0.45)
P ( X ≤ 1) = 0.0233
(ii)
P(X ≥ 6) = 1 – P ( X ≤ 5) or 1 – 0.7384
= 0.2616…
(b)
F~N(54, 29.7)
c + 0.5 − 54
≤ −1.6449
29.7
c = 44 and d = 64
(c)
(a)(i)
(ii)
(b)
M1
awrt 0.0233 A1
M1
awrt 0.262 A1
(4)
M1A1
d − 0.5 − 54
M1M1B1
or
≥ 1.6449
A1
29.7
A1cso
(7)
H0: p = 0.45
H1: p < 0.45
B1
Y ~ B(30, 0.45) therefore P(Y ≤ 8) =
0.03... or CR Y ≤ 8
B1
8 is in the critical region or Reject H0 oe or significant
dM1
therefore the data collected supports the manufacturer’s claim.
A1
(4)
Notes
Total 15
Writing or using B(10, 0.45) in (i) or (ii) implied by a correct answer to (i) or (ii)
M1
awrt 0.0233
A1
For writing or using 1 − P(X ≤ 5) oe
M1
awrt 0.262
A1
For writing or using N(54,…)
M1
For writing or using N(54, 29.7)
A1
For standardising (allow ± ) using their "54" and "29.7" and putting = to z value where
M1
1 < z < 2 Condone missing ±0.5
M1
B1
A1
A1cso
(c)
Marks
B1
B1
dM1
A1
M1 for using a continuity correction ± 0.5 in standardisation. No need to put = to z value
For using 1.6449 or better (calc gives) 1.64485… Allow if written then gone on to use
1.65 or1.64 or better in equation
One correct inequality. Allow written as an equation. Allow with 1.65/1.64 or better
All previous marks awarded. Both c and d correct integers
NB: c and d correct with no working can be awarded full marks
Both hypotheses correct in terms of p or π Must be attached to H0 and H1
0.03 or better (0.03120…) or CR stated as Y ≤ 8 oe do not accept P(Y ≤ 8) =
... for CR
Condone 0.97 or better ( 0.96879…)
Dep on 2nd B1 A correct statement – need not be contextual but do not allow
contradicting non contextual comments.
Allow opposite conclusion if 2-tail hypotheses given.
Correct conclusion for their H1. If H1 is 2- tail the opposite conclusion must be given. No
hypotheses or H1 p > 0.45 is A0. Allow belief instead of claim. Allow the data collected
supports that the proportion/percentage/probability/number/amount oe of flawed
plates has decreased/reduced/is not 0.45/has changed oe
http://britishstudentroom.wordpress.com/
Question
Number
Scheme
Marks
4(a)
Common Spotted-orchids occur singly/randomly/independently
(b)(i)
S ~ Po(4.5)
P ( S = 6) =
e −4.5 4.56
or P( S ≤ 6) − P( S ≤ 5)
6!
awrt 0.128 A1
(ii)
P(4 < S < 10)= P( S ≤ 9) − P( S ≤ 4) or 0.9829 – 0.5321
= 0.4508
(c)
H0 : λ = 9 H1 : λ > 9
M Po(9)
P( M ≥ 11) =−
1 P ( M ≤ 10 )
= 0.294
or CR M ≥ 15
Accept H0 or insignificant or 11 does not lie in the critical region
There is insufficient evidence to support Juan’s belief
T ~ N(90, 90)
B1
or P( M ≥ 15) =
0.0415
V ~ Po(200 × 0.012) = Po(2.4) V ~ = Po(2.4)
P (V =
0 ) + P (V ==
1) e −2.4 (1 + 2.4)
= 0.30844…
4(a)
B1
(b)(i)
M1
(ii)
(c)
A1
M1
A1
B1
M1
A1
dM1
(e)
(4)
(5)
awrt 2.16 M1
awrt 0.0154 A1
M1
(3)
dM1
awrt 0.308 A1
(3)
Notes
Total 16
One of the given reasons. No context needed
e−λ λ 6
For
with any value for λ or writing or using P( S ≤ 6) − P( S ≤ 5)
6!
awrt 0.128
Writing or using P( S ≤ 9) − P( S ≤ 4)
awrt 0.451
Both hypotheses correct. Must be attached to H0 and H1 in terms of λ or μ. Allow 4.5 instead of 9.
Writing or using Po(9) and 1 − P ( M ≤ 10 ) or P( M ≥ 15) =
0.0415 oe Implied by correct CR or
awrt 0.3 or 0.29… or better (0.2940…)
0.3 or 0.29… or better (0.2940…) or M ≥ 15 oe
SC: Condone P ( X 10 ) = 0.7 or better (0.705988 ) for M1A1
B1
M1
A1
M1
Dep on M1 A1. A correct statement– no context needed but do not allow contradicting non
contextual comments. Allow opposite conclusion if 2-tail hypotheses given.
Correct conclusion. If H0 is 2- tail the opposite conclusion must be given. No hypotheses or H0
λ < 9 gets A0. Allow claim instead of belief. Alternative: There is insufficient evidence to
support hat the number of Common Spotted-orchids has increased/ /is not 9/has changed oe
(with the bold words included).
Writing or using N(90, 90)
Standardising with 68.5 or 69.5 or 70.5 and their mean and sd
awrt 0.0154
NB Poisson gives 0.01275…
Writing or using Po(200 × 0.012) Allow Po(200 × "their d")
dM1
A1
awrt 0.308 NB Binomial gives 0.3066
A1
(d)
M1
awrt 0.451 A1
B1
M1
A1
dM1
A1
69.5 − 90
P(T < 70) = P Z < ±
or P(Z < ± 2.160……)
90
= 0.0154
(e)
(1)
M1
= 0.1281…
(d)
B1
0 ) + P (V =
1) or e − λ (1 + λ ) or P (V 1) oe
Dependent on using Poison. For using / writing P (V =
http://britishstudentroom.wordpress.com/
Question
Number
Scheme
∫
2
E(T =
)
5(a)
3
0
Marks
5 1
1
t 2 dt
18t 2 − 2t 3 ) dt + ∫
(
3
50
20
3
5
1
t 4 t 3
= 6t 3 − + or
2 0 60 3
50
M1
3
5
3
t4 t3
oe
= t3 −
+
100 0 60 3
25
1
34 125 27
1
81 25 9
3
=
− or =
6×3 − +
162 − + − oe
50
2 12 20
50
2 60 60
"
=
Var(T )
4.063..." − (1.66 )
2
= 1.3077…
t
(
(c)
P (T > 2 ) =1 − "
=
(d)
(a)
P(0 < T < 3.66) = F(3.66)
= 0.933
M1
A1
M1d
M1
(b)
(c)
(d)
A1
M1
B1
A1
A1
M1
A1
M1
A1
)
2 1
1
18 × 2 − 22 ) " or 1 − ∫
(18 − 2t ) dt
(
0 50
50
9
or 0.36
25
M1
awrt 1.31 A1
3 1
1
dx + C where C = 0.9 or ∫
(18 − 2t ) dt or using F(5) =1 to find C
0 50
3 20
t<0
0
2
18 − 2t )
(
1
2
18t − t or 1.62 −
0≤t ≤3
200
F ( t ) = 50
1
t + 0.75
3<t ≤5
20
t >5
1
∫
M1d
1219
= 4.063...
300
=
(b)
A1
M1
(5)
B1
A1
A1
(4)
M1
A1
M1
A1
(2)
(2)
Notes
Total 13
Intention to find E (T 2 ) correctly. They must add the 2 integrals and attempt to integrate (at least
one term x n → x n +1 ). Algebraic integration must be seen. Ignore limits. Allow as part of Var(T)
condone " – (1.66)2" occurring twice. If no algebraic integration shown it is M0
Correct integration
dep on previous M being awarded for correct limits and attempt to substitute. If no working shown
An attempt may be implied by a correct answer or 1219/300 or 243/100 or 49\30 oe
For their E (T 2 ) – 1.662
awrt 1.31 Allow 2452 / 1875 oe
For a correct method to find the 3rd line including limits unless using F(5) = 1 method.
2nd line correct – any letter. Ignore missing inequality
3rd line correct– any letter. Ignore missing inequality
Fully correct CDF All in terms of the same letter (Ignore LHS). Allow < instead of ≤ and vice
versa. Allow "otherwise" for the range on the 1st or last line but not both.
For finding 1 − F(2) using their second line or starting again. Must subst in 2
cao
For realising they need F(3.66) Allow F(3.66) [– F(0)] allow F("their mean +2") [– F(0)]
Cao allow answer as a fraction
http://britishstudentroom.wordpress.com/
Question
Number
6(a)
(b)
Scheme
A sampling distribution is all the values of a statistic and the associated
probabilities
or the probability distribution of the statistic.
B1
P(small(40)) = 0.5, P(medium(80)) = 0.3, P(large(150)) = 0.2
Range (R) 0, 40, 70, 110
B1
B1
0.16
P ( R = 0 ) = "0.5"3 + "0.3"3 + "0.2"3 =
(40,40,80) (40,80,80)
(80,80,150) (80,150,150)
(40,40,150) (40,80,150) (40,150,150)
P ( R = 40 ) = 3 × ("0.5"× "0.3"2 ) + 3 × ("0.5"2 × "0.3")
P ( R = 70 ) = 3 × ("0.3"2 × "0.2") + 3 × ("0.3"× "0.2"2 ) =0.09
P ( R =110 ) = 3 × ("0.5"2 × "0.2") + 3 × ("0.5"+ "0.2"2 ) + 6 × ("0.5"× "0.3"× "0.2") =0.39
0
40
70
110
R
0.16
0.36
0.09
0.39
r
(c)
(1 − "0.09") < 0.2 or
n
[ n >]17.065...
("0.91") < 0.2
n
6(a)
B1
(b)
B1
B1
M1
B1
M1
M1
A1
M1
M1
A1
Notes
(1)
M1
B1
M1
M1
A1cao
(7)
M1
M1
A1
n = 18
(c)
Marks
(3)
Total 11
A correct explanation with the words in bold. Allow equivalent words eg outcomes for
values
Correct probabilities – may be seen in an equation or implied by a correct probability
for R = 0 or for 2 correct probabilities from those for R =40, R =70, R =110
All four ranges correct with no extra.
Correct method for finding P(R = 0)
All the correct combinations for R = 40, 70 and 110. R= 0 combinations are not
required but no incorrect combinations must be seen (may use bag size rather than
numbers in bag) May be implied by a correct probability for P(R = 40), P(R = 70) and
P(R = 110) or by correct working seen for each of the 7 combinations (no need for the
number of ways of arranging ie 3 × or 6 × ) eg (40,40,80) = 0.52 × 0.3
Correct method for one of the probabilities for P(R = 40), P(R = 70), P(R = 110)
Correct method for a second probability for P(R = 40), P(R = 70), P(R = 110) or the 4
probabilities add up to 1.
Correct answer only. Allow answers as a fraction. Need not be in a table but
probabilities must be attached to the correct range
Setting up a correct inequality using their 0.09 Allow written as an equation.
log 0.2
For 17.1 or better allow
or log"0.91"0.2 oe If inequality/equation is incorrect
log"0.91"
but of the form ( p ) n < 0.2 ( p ) n = 0.2 where 0 < p < 1 this mark can be awarded if
working is shown
18 do not accept n > 18 or n < 18 if final answer
http://britishstudentroom.wordpress.com/
Pearson Education Limited. Registered company number 872828
with its registered office at 80 Strand, London, WC2R 0RL, United Kingdom