Maths (9709) · Oct/Nov 2025 · Mark scheme 53

Cambridge Maths (9709) mark scheme for paper 53, Oct/Nov 2025 — 9709/53/O/N/25, file 9709_w25_ms_53.pdf.

Advertisement
Loading the paper…
Text of this paper

www.dynamicpapers.com

Cambridge International AS & A Level
MATHEMATICS

9709/53

Paper 5 Probability & Statistics 1

October/November 2025

MARK SCHEME
Maximum Mark: 50

Published

This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of the
examination. It shows the basis on which Examiners were instructed to award marks. It does not indicate the
details of the discussions that took place at an Examiners’ meeting before marking began, which would have
considered the acceptability of alternative answers.
Mark schemes should be read in conjunction with the question paper and the Principal Examiner Report f or
Teachers.
Cambridge International will not enter into discussions about these mark schemes.
Cambridge International is publishing the mark schemes f or the October/November 2025 series f or most
Cambridge IGCSE, Cambridge International A and AS Level components, and some Cambridge O Level
components.

This document consists of 24 printed pages.
© Cambridge University Press & Assessment 2025

[Turn over

9709/53

October/November 2025
www.dynamicpapers.com

Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Generic Marking Principles

These general marking principles must be applied by all examiners when marking candidate answers. They should be applied alongside the specific content of the
mark scheme or generic level descriptions for a question. Each question paper and mark scheme will also comply with these marking principles.
GENERIC MARKING PRINCIPLE 1:
Marks must be awarded in line with:
• the specific content of the mark scheme or the generic level descriptors for the question
• the specific skills defined in the mark scheme or in the generic level descriptors for the question
• the standard of response required by a candidate as exemplified by the standardisation scripts.
GENERIC MARKING PRINCIPLE 2:
Marks awarded are always whole marks (not half marks, or other fractions).
GENERIC MARKING PRINCIPLE 3:
Marks must be awarded positively:
• marks are awarded for correct/valid answers, as defined in the mark scheme. However, credit is given for valid answers which go beyond the scope of the
syllabus and mark scheme, referring to your Team Leader as appropriate
• marks are awarded when candidates clearly demonstrate what they know and can do
• marks are not deducted for errors
• marks are not deducted for omissions
• answers should only be judged on the quality of spelling, punctuation and grammar when these features are specifically assessed by the question as
indicated by the mark scheme. The meaning, however, should be unambiguous.
GENERIC MARKING PRINCIPLE 4:
Rules must be applied consistently, e.g. in situations where candidates have not followed instructions or in the application of generic level descriptors.
GENERIC MARKING PRINCIPLE 5:
Marks should be awarded using the full range of marks defined in the mark scheme for the question (however; the use of the full mark range may be limited
according to the quality of the candidate responses seen).
GENERIC MARKING PRINCIPLE 6:
Marks awarded are based solely on the requirements as defined in the mark scheme. Marks should not be awarded with grade thresholds or grade descriptors in
mind.

© Cambridge University Press & Assessment 2025

Page 2 of 24

9709/53

October/November 2025
www.dynamicpapers.com

Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Mathematics-Specific Marking Principles

1

Unless a particular method has been specified in the question, full marks may be awarded for any correct method. However, if a calculation is required
then no marks will be awarded for a scale drawing.

2

Unless specified in the question, non-integer answers may be given as fractions, decimals or in standard form. Ignore superfluous zeros, provided that the
degree of accuracy is not affected.

3

Allow alternative conventions for notation if used consistently throughout the paper, e.g. commas being used as decimal point s.

4

Unless otherwise indicated, marks once gained cannot subsequently be lost, e.g. wrong working following a correct form of answer is ignored (isw).

5

Where a candidate has misread a number or sign in the question and used that value consistently throughout, provided that number does not alter the
difficulty or the method required, award all marks earned and deduct just 1 A or B mark for the misread.

6

Recovery within working is allowed, e.g. a notation error in the working where the following line of working makes the candidate’s intent clear.

© Cambridge University Press & Assessment 2025

Page 3 of 24

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Annotations guidance for centres
Examiners use a system of annotations as a shorthand for communicating their marking decisions to one another. Examiners are trained during the standardisation
process on how and when to use annotations. The purpose of annotations is to inform the standardisation and monitoring processes and guide the supervising
examiners when they are checking the work of examiners within their team. The meaning of annotations and how they are used is specific to each component and
is understood by all examiners who mark the component.
We publish annotations in our mark schemes to help centres understand the annotations they may see on copies of scripts. Note that there may not be a direct
correlation between the number of annotations on a script and the mark awarded. Similarly, the use of an annotation may not be an indication of the quality of the
response.
The annotations listed below were available to examiners marking this component in this series.
Annotations
Annotation

Meaning
More information required
Accuracy mark awarded zero
Accuracy mark awarded one
Independent accuracy mark awarded zero
Independent accuracy mark awarded one
Independent accuracy mark awarded two
Benefit of the doubt
Blank Page
Incorrect

Dep

Used to indicate DM0 or DM1

© Cambridge University Press & Assessment 2025

Page 4 of 24

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Annotation

Meaning

DM1

Dependent on the previous M1 mark(s)
Follow through
Indicate working that is right or wrong

Highlighter

Highlight a key point in the working
Ignore subsequent work
Judgement
Judgement
Method mark awarded zero
Method mark awarded one
Method mark awarded two
Misread
Omission or Other solution

Off-page comment

Allows comments to be entered at the bottom of the RM marking window and then displayed when the associated question item is
navigated to.

On-page comment

Allows comments to be entered in speech bubbles on the candidate response.
Judgment made by the PE
Premature approximation
Special case
Indicates that work/page has been seen

© Cambridge University Press & Assessment 2025

Page 5 of 24

October/November 2025
www.dynamicpapers.com

9709/53
Annotation

Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Meaning
Error in number of significant figures
Correct
Transcription error
Correct answer from incorrect working

© Cambridge University Press & Assessment 2025

Page 6 of 24

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Mark Scheme Notes

The following notes are intended to aid interpretation of mark schemes in general, but individual mark schemes may include marks awarded for specific reasons
outside the scope of these notes.
Types of mark
M

Method mark, awarded for a valid method applied to the problem. Method marks are not lost for numerical errors, algebraic slips or errors in units.
However, it is not usually sufficient for a candidate just to indicate an intention of using some method or just to quote a formula; the formula or idea
must be applied to the specific problem in hand, e.g. by substituting the relevant quantities into the formula. Correct appli cation of a formula
without the formula being quoted obviously earns the M mark and in some cases an M mark can be implied from a correct answer.

A

Accuracy mark, awarded for a correct answer or intermediate step correctly obtained. Accuracy marks cannot be given unless the associated method
mark is earned (or implied).

B

Mark for a correct result or statement independent of method marks.

DM or DB

FT
•
•
•
•
•

When a part of a question has two or more ‘method’ steps, the M marks are generally independent unless the scheme specificall y says otherwise;
and similarly, when there are several B marks allocated. The notation DM or DB is used to indicate that a particular M or B mark is dependent on
an earlier M or B (asterisked) mark in the scheme. When two or more steps are run together by the candidate, the earlier marks are implied and full
credit is given.
Implies that the A or B mark indicated is allowed for work correctly following on from previously incorrect results. Otherwise, A or B marks are
given for correct work only.

A or B marks are given for correct work only (not for results obtained from incorrect working) unless follow through is allowed (see abbreviation FT above).
For a numerical answer, allow the A or B mark if the answer is correct to 3 significant figures or would be correct to 3 sign ificant figures if rounded (1
decimal place for angles in degrees).
The total number of marks available for each question is shown at the bottom of the Marks column.
Wrong or missing units in an answer should not result in loss of marks unless the guidance indicates otherwise.
Square brackets [ ] around text or numbers show extra information not needed for the mark to be awarded.

© Cambridge University Press & Assessment 2025

Page 7 of 24

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Abbreviations
AEF/OE Any Equivalent Form (of answer is equally acceptable) / Or Equivalent
AG

Answer Given on the question paper (so extra checking is needed to ensure that the detailed working leading to the result is valid)

CAO

Correct Answer Only (emphasising that no ‘follow through’ from a previous error is allowed)

CWO

Correct Working Only

ISW

Ignore Subsequent Working

SOI

Seen Or Implied

SC

Special Case (detailing the mark to be given for a specific wrong solution, or a case where some standard marking practice is to be varied in the
light of a particular circumstance)

WWW

Without Wrong Working

AWRT

Answer Which Rounds To

© Cambridge University Press & Assessment 2025

Page 8 of 24

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
1(a)

Answer
[( 0.6 ) =] 0.216,
3

Marks

Guidance

B1 OE.

27
125

1
1(b)

Method 1
[P(X < 9) = 1 – P(9, 10, 11) =] 1 – {11 C9(0.75)9 (0.25)2 + 11C10 (0.75)10
(0.25) + (0.75) 11 }
[= 1 – (0.258104 + 0.154862 + 0.042235)]

M1 One term of form
11.

11 C
x

( p )x (1 − p )11− x

with 0  p  1, x  0 or

A1 Correct un-simplified expression, no terms omitted leading to
final answer.
Condone omission of final bracket ‘}’
If other brackets omitted, allow recovery if 1 – 0.455 (or better)
seen.
Accept

= 0.545

B1

11 11

Cx ( p ) (1 − p )

9

11− x

x

with p = 0.75.

0.5445  p  0.545 .

Method 2
[P(X < 9) = P(0,1,2,3,4,5,6,7,8) =] (0.25) 11 + 11 C1(0.75)(0.25)10 + … +
11 C (0.75) 7 (0.25) 4 + 11 C (0.75) 8 (0.25) 3
7
8

M1 One term of form
11.

11 C
x

( p )x (1 − p )11− x

with 0  p  1, x  0 or

A1 Correct un-simplified expression, no more than 6 ‘middle’
terms omitted leading to final answer.
Accept
= 0.545

B1
3

© Cambridge University Press & Assessment 2025

Page 9 of 24

8 11
0

Cx ( p ) (1 − p )

0.5445  p  0.545 .

x

11− x

with p = 0.75.

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
2

Answer
Scenario

Marks

Guidance

B1 Expression of the form 16 Cx 
correct identified scenario.

S(16) D(10)

SSSSDD

4

2

16 C
4

10 C
2

[81900]

SSSDDD

3

3

16 C
3

10 C
3

[67200]

SSDDDD

2

4

16 C
2

10 C
4

[25200]

10 C
y

with x+ y = 6 linked to a

M1 Two identified outcomes evaluated accurately, accept unsimplified.
Identification can be implied by un-simplified expression.
Condone consistent use of permutations.
M1 Sum of their values of 3 correct identified scenarios, no
incorrect/repeated scenarios.
Identification can be implied by un-simplified expression.
Total = 174 300

A1 If either or both Ms not awarded, SCB1 for 174 300 WWW.
4

© Cambridge University Press & Assessment 2025

Page 10 of 24

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question

Answer

Marks

3(a)

Method 1 Total arrangements with Ds at ends – arrangements with Ds
at ends and Fs together
7!
− 6!
2!

[= 2520 – 720]

= 1800

Guidance

M1

7!
seen alone, not multiplied or divided in a calculation nor
2!
subtracted from another value.

M1

l!
− 6!, l = 7, 8 or 9, m = 1 or 2
m!

A1

Method 2 D ^ ^ ^ ^ ^ D, Fs inserted not next to each other
5! 

65
2

= 1800

M1

5!  a, 1 a 30 1 can be implied, a is an integer. No other
terms added or subtracted.

M1

6P2
65
.
or b!  6C2 or b!
2!
2
Where b = 5, 6 or 7 .

A1
3

© Cambridge University Press & Assessment 2025

Page 11 of 24

b! 

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
3(b)

Answer

Marks

Guidance

Method 1
[Number of outcomes with 4 letters between Ds (D ^ ^ ^ ^ D ^ ^ ^)]
7!
 4 [= 10080]
2!

[Total number of arrangements =]

M1 Accept
7!
 4 or 10080 alone or as the numerator or denominator of a
2
fraction.
M1 Accept 90720 as denominator in a fraction.

9!
[= 90720] seen as
2!2!

denominator in a fraction

Probability =

A1 WWW.

10080 1
, , 0.111
90720 9

Method 2
[Total number of outcomes with 4 letters between Ds (D1 ^ ^ ^ ^ D2 ^
^ ^)]

M1 Accept 7!  4  2! or 40320 alone or as the numerator or
denominator of a fraction.

7!  4  2! [= 40320]
[Total number of arrangements of D1 AF1 F2 OD2 ILS =]
9! [=362880] seen as denominator in a fraction.

 Probability =

M1 Accept 362880 as denominator in a fraction.
A1 WWW.

40320 1
, , 0.111
362880 9

© Cambridge University Press & Assessment 2025

Page 12 of 24

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
3(b)

Answer

Marks

Guidance

Method 3
[When 2 F’s are not part of the 4 letters between the D’s]

M1 Accept 10080 alone or as the numerator or denominator of a
fraction.

5P4  4!
5!  4!
or
[= 1440]
2!
2!

[When 1F is part of the 4 letters between the D’s]
5C
3

 4!  4! [=5760]

[When 2F’s are part of the 4 letters between the D’s]
5C2  4!
 4! [=2880]
2!

[1440 + 5760 + 2880] = 10080
[Total number of arrangements =]

M1 Accept 90720 as denominator in a fraction.

9!
[= 90720] seen as
2!2!

denominator in a fraction

 Probability =

A1 WWW.

10080 1
, , 0.111
90720 9

3

© Cambridge University Press & Assessment 2025

Page 13 of 24

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
4(a)

Answer

Marks

x

0

1

2

3

4

P(X = x)

3
16

1
16

3
16

5
16

4
16

0.1875

0.0625

0.1875

0.3125

0.25

0.188

0.0625

0.188

0.313

0.25

Accept

B1 Table with correct x values and one correct probability.
B1 2 more probabilities correct linked to the correct x value, need
not be in table, accept un-simplified.
B1 5 correct probabilities linked with correct outcomes.
SCB1 5 non-zero probabilities (not all 1/5) summing to 1
placed in a probability distribution table with correct x values if
only one of the first two B marks are scored.
3

© Cambridge University Press & Assessment 2025

Guidance

Page 14 of 24

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
4(b)

Answer

Marks

M1FT Accept un-simplified or bold expression with probabilities (0 <
p < 1) that add to 1. May be calculated in variance.
FT their table with 4 or 5 probabilities adding to 1.

1
3
5
4
+ 2  + 3 + 4 
16
16
16
16
 0 + 1 + 6 + 15 + 16 
=

16


 38 19 
 = 16 = 8 

[E(X) = ] 0 + 1

1 + 3  22 + 5  32 + 4  42  19 
− 
16
8
 1 + 3  4 + 5  9 + 4  16 361 
−
=
16
64 




2
 122  19  
−  
=
 16  8  

M1FT Appropriate variance formula using their (E(X))2 value.
FT their table with 4 or more probabilities (0 < p < 1) which
need not sum to 1 or with an expression no more evaluated than
shown.

2

Var(X) =

=

A1 Accept 1.984375 to 3 or more SF.
SCB1 for 1.98 if M0 M1 scored.

127 63
, 1 , 1.98
64 64

3

© Cambridge University Press & Assessment 2025

Guidance

Page 15 of 24

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
4(c)

Answer

Marks

Guidance

Method 1
3
1−  
4

M1

7

= 0.867

n

3
1 −   with n = 6, 7, 8.
4

A1 = 0.8665 to 4SF.

Method 2
2

[P(X < 8) =]

3

4

1  3  1   3   1   3   1   3   1 
+    +     +     +     +
4  4  4   4   4   4   4   4   4 
5

M1

6

3 1 3 1
   +   
4 4 4 4

= 0.867

A1
2

© Cambridge University Press & Assessment 2025

Page 16 of 24

7

6

 3 1
 3 1
Condone extra term     or the term     missing.
 4  4
 4  4

9709/53
Question

October/November 2025
www.dynamicpapers.com

Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Answer

Marks

5(a)

Guidance

B1 Correct tree diagram structure.
(3 tiers).
B1 Counter and first marble probabilities correct with outcomes
labelled.
B1 Second marble probabilities correct with outcomes labelled.

3

© Cambridge University Press & Assessment 2025

Page 17 of 24

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
5(b)

Answer

Marks

Guidance

P(WRB)

3 4 3
 
5 7 6

6
 35 
 

0.171(4)

M1 At least 2 correct 3-term products linked to correct scenarios.
May be clearly identified on tree diagram.
FT from a 3-tier tree.

P(WBR)

3 3 4
 
5 7 6

6
 35 
 

0.171(4)

M1 4 correct identified scenarios added.
May be clearly identified on the tree diagram, condone
identification by correct (or FT) un-simplified products.

P(YRB)

2 5 3
 
5 8 7

3
 28 
 

0.107(1)

P(YBR)

2 3 5
 
5 8 7

3
 28 
 

0.107(1)

[Total

39
]
70

0.557

=

A1

39
, 0.557
70

3

© Cambridge University Press & Assessment 2025

Page 18 of 24

SCB1 for

39
if one or both M marks not scored WWW.
70

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
5(c)

Answer

Marks

M1 Correct formula for conditional probability using their
probabilities from 3-tier tree with their (b) < 1 or correct in
denominator.

3 4 3 3 3 4  36
36 
  +   
+

5
7
6
5
7
6
210
210
P(White| (b)) =
=


39
 their 39 
their
70
70 

=

12
or their P (WRB ) + P (WBR ) from part b
Condone 35
.
39
their
or unsimplified expression
70

A1

8
, 0.615
13

2

© Cambridge University Press & Assessment 2025

Guidance

Page 19 of 24

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
6(a)

Answer
Linnets
8
9 7 4 1
8 5 4 4 0
0

4
5
6
7

Marks

Puffins
5 9
1 5 5 8 9
2 4 4
4

Guidance

B1 Correct stem, ignore extra values (not in reverse, not split)
If a split stem-and-leaf plot is used (i.e. stem values are
repeated) the remaining B marks are available.
B1 Correct Linnets labelled on left, leaves in order from right to
left and lined up vertically, no commas or other punctuation.

Key: 4|5|5 means 54 minutes for Linnets and 55 minutes for Puffins

B1 Correct Puffins labelled on same diagram, leaves in order and
lined up vertically, no commas or other punctuation.
Penalise each error only once in question (apart from omission
of data) e.g. commas in both sets of data.
B1 Correct non-symmetrical key, for their diagram, need both
team names and ‘mins’ at least once here or in leaf headings (or
title).
If 2 separate diagrams drawn, max marks
B1 if both stems correct,
B1 if Linnets correct to the left of the stem,
B1 if both keys correct including ‘mins’ and team name.
4

6(b)

[IQR =] 65 – 54

M1 64 ⩽ UQ ⩽ 68−51 ⩽ LQ ⩽ 57
Implied if both quartile values are stated and an appropriate
IQR calculated accurately.
Condone 54 and 65 clearly identified in the table or their stem
and leaf diagram.

= 11

A1
2

© Cambridge University Press & Assessment 2025

Page 20 of 24

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question

Answer

Marks

6(c)

Guidance

B1 Single linear scale from 45 to 75, at least 3 equally spaces
values marked, using a scale of 2cm = 10 or 20 minutes only.
Label to include time and minutes/min/m.
SCB1 for 2 labelled box plots correct relative to each other and
no scale is present. No further marks can be gained.
B1FT Correct plot labelled ‘Linnets’ with 5 key values using their
linear scale.
Daylight rule applied.
Whiskers not at top/bottom of box or through box (penalise
only once).
Condone missing vertical lines on max/min values.
Linnets

48

54

60

65

70

Puffins

45

51

58

64

74

LQ and UQ correct or FT their values from 6(b).
B1 Correct plot labelled ‘Puffins’ with 5 key values using the same
linear scale as Linnets.
Whiskers not at top/bottom of box or through box (penalise
only once).
Condone missing vertical lines on max/min values.
SCB1 for neither plot identified assuming Linnets at top of grid
and both correct.
SCB1 for only one unidentified plot – mark as Linnets.
3

© Cambridge University Press & Assessment 2025

Page 21 of 24

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
6(d)

Answer

Marks

Acceptable comment about spread/central tendency

Guidance

B1 Not just a comment comparing median or range.

e.g. the times taken by the Puffins are more spread out/less consistent
than those of the Linnets,
the times taken by the Linnets are less varied/more consistent than for
the Puffins,
Linnets are slower [on average], Linnets have slower times
Puffins are faster [on average], Puffins have faster times

Ignore extra comment(s) if not contradicting a correct
statement.

1

Question
7(a)

Answer
[P(X > 15.6) = P(Z >]

Marks

15.6 − 14.8
)
1.5

Guidance

M1 Use of ± standardisation formula with 15.6, 14.8 and 1.5
substituted, condone  2 , condone  , condone continuity
correction of 0.05 .

[= 1 − Φ ( 0.5333)]
= 1 − 0.7029

M1 Calculating the appropriate probability area (leading to their
final answer, expect < 0.5).

= 0.297

A1 AWRT 0.297.
If one or both M marks not awarded, SCB1 for AWRT 0.297
WWW.
3

© Cambridge University Press & Assessment 2025

Page 22 of 24

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
7(b)

Answer
[P(X > 15.6) = P(Z >] [P(Z >

Marks

t − 14.8
) = 0.9]
1.5

B1

Guidance
−1.282 or 1.282 seen, CAO – critical value.

t − 14.8
= −1.282
1.5

M1 Using ± standardisation formula with 14.8, 1.5 and t equating
to a z-value (not 0.8159, 0.1841, 0.9, 0.1, 0.5398, 0.4602 …)
not  2 , not  , no continuity correction.

t = 12.9

A1 AWRT 12.9.
3

© Cambridge University Press & Assessment 2025

Page 23 of 24

October/November 2025
www.dynamicpapers.com

9709/53

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
7(c)

Answer

Marks

Guidance

M1 Substituting 14.8 and 1.5 and either 13.8 or 15.8 appropriately
into one ±standardising formula, not σ2 or  , no continuity
correction.

 13.8 − 14.8 
[P(X > 13.8) = P(Z >] 
 and/or
1.5


15.8
−
14.8


[P(X < 15.8) = P(Z < ] 

1.5

SCM1 – Condone substituting 14.8 and 1.5 and either 14.3 or
15.3 appropriately into one ±standardising formula, not σ2 or
 , no continuity correction.

Or
 −1 
[P(Z) ]   and/or
 1.5 
 1 
[P(Z) ]  
 1.5 

[= 2 Φ ( 0.6667 ) − 1 ]
= 2  0.7477 −1
Or 2  ( 0.7477 − 0.5 )

M1 Calculating the appropriate probability area (leading to their
final answer, expect < 0.5) from their Z-values.

Or 0.7477 − (1 − 0.7477 )
Or 0.7477 − 0.2523
= 0.495(4)

A1 AWRT 0.495.
If one or both M marks not awarded, SCB1 for AWRT 0.495
SOI.

[Expected number of days =] 0.4954  5  45 = 111.465,
so 111 days

B1FT Strict FT their at least 4 figure probability × 225 (Check with
calculator).
One integer answer, expect 111 or 112.
No indication of ‘approximation’, e.g. , , about , 3SF.
4

© Cambridge University Press & Assessment 2025

Page 24 of 24

Advertisement