Maximum Mark: 50

Published

This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of the
examination. It shows the basis on which Examiners were instructed to award marks. It does not indicate the
details of the discussions that took place at an Examiners’ meeting before marking began, which would have
considered the acceptability of alternative answers.
Mark schemes should be read in conjunction with the question paper and the Principal Examiner Report for
Teachers.
Cambridge International will not enter into discussions about these mark schemes.
Cambridge International is publishing the mark schemes for the October/November 2017 series for most
®
Cambridge IGCSE , Cambridge International A and AS Level components and some Cambridge O Level
components.

® IGCSE is a registered trademark.

This document consists of 11 printed pages.
© UCLES 2017

[Turn over

9709/61

Cambridge International AS/A Level – Mark Scheme
PUBLISHED

October/November
www.dynamicpapers.com
2017

Mark Scheme Notes
Marks are of the following three types:
M

Method mark, awarded for a valid method applied to the problem. Method marks are not lost for numerical errors, algebraic slips or errors
in units. However, it is not usually sufficient for a candidate just to indicate an intention of using some method or just to quote a formula;
the formula or idea must be applied to the specific problem in hand, e.g. by substituting the relevant quantities into the formula. Correct
application of a formula without the formula being quoted obviously earns the M mark and in some cases an M mark can be implied from a
correct answer.

A

Accuracy mark, awarded for a correct answer or intermediate step correctly obtained. Accuracy marks cannot be given unless the
associated method mark is earned (or implied).

B

Mark for a correct result or statement independent of method marks.

•

When a part of a question has two or more “method” steps, the M marks are generally independent unless the scheme specifically says
otherwise; and similarly when there are several B marks allocated. The notation DM or DB (or dep*) is used to indicate that a particular M or B
mark is dependent on an earlier M or B (asterisked) mark in the scheme. When two or more steps are run together by the candidate, the earlier
marks are implied and full credit is given.

•

The symbol FT implies that the A or B mark indicated is allowed for work correctly following on from previously incorrect results. Otherwise, A
or B marks are given for correct work only. A and B marks are not given for fortuitously “correct” answers or results obtained from incorrect
working.
•

Note:

B2 or A2 means that the candidate can earn 2 or 0.
B2/1/0 means that the candidate can earn anything from 0 to 2.

The marks indicated in the scheme may not be subdivided. If there is genuine doubt whether a candidate has earned a mark, allow the
candidate the benefit of the doubt. Unless otherwise indicated, marks once gained cannot subsequently be lost, e.g. wrong working following a
correct form of answer is ignored.
•

Wrong or missing units in an answer should not lead to the loss of a mark unless the scheme specifically indicates otherwise.

•

For a numerical answer, allow the A or B mark if a value is obtained which is correct to 3 s.f., or which would be correct to 3 s.f. if rounded (1
d.p. in the case of an angle). As stated above, an A or B mark is not given if a correct numerical answer arises fortuitously from incorrect
working. For Mechanics questions, allow A or B marks for correct answers which arise from taking g equal to 9.8 or 9.81 instead of 10.

© UCLES 2017

Page 2 of 11

9709/61

Cambridge International AS/A Level – Mark Scheme
PUBLISHED
The following abbreviations may be used in a mark scheme or used on the scripts:

October/November
www.dynamicpapers.com
2017

AEF/OE Any Equivalent Form (of answer is equally acceptable) / Or Equivalent
AG

Answer Given on the question paper (so extra checking is needed to ensure that the detailed working leading to the result is valid)

CAO

Correct Answer Only (emphasising that no “follow through” from a previous error is allowed)

CWO

Correct Working Only – often written by a ‘fortuitous’ answer

ISW

Ignore Subsequent Working

SOI

Seen or implied

SR

Special Ruling (detailing the mark to be given for a specific wrong solution, or a case where some standard marking practice is to be
varied in the light of a particular circumstance)

Penalties
MR –1 A penalty of MR –1 is deducted from A or B marks when the data of a question or part question are genuinely misread and the object
and difficulty of the question remain unaltered. In this case all A and B marks then become “follow through” marks. MR is not applied
when the candidate misreads his own figures – this is regarded as an error in accuracy. An MR –2 penalty may be applied in particular
cases if agreed at the coordination meeting.
PA –1

© UCLES 2017

This is deducted from A or B marks in the case of premature approximation. The PA –1 penalty is usually discussed at the meeting.

Page 3 of 11

9709/61

Cambridge International AS/A Level – Mark Scheme
PUBLISHED

Question
1

Answer

Marks

Guidance

p + q = 0.45

M1 Equation involving ΣP(x) = 1

0.15+ 2p + 1.2 + 6q = 3.05

M1 Equation using E(X) = 3.05

q = 0.2

M1 Solving simultaneous equations to one variable

p = 0.25

A1 Both answers correct
4

© UCLES 2017

October/November
www.dynamicpapers.com
2017

Page 4 of 11

9709/61

Cambridge International AS/A Level – Mark Scheme
PUBLISHED

Question
2(i)

Answer

Marks

Guidance

Points (5.5,10), (8.5,25), (11.5,42), (16.5,46), (25.5,48)

B1 Correct cfs values seen listed, in or by table or on graph, 0 not required

cf
50

B1 Axes labelled “cumulative frequency” (or cf) and
“time [or t etc.] (in) seconds (or sec etc.)”.
Linear scales – cf 0–48, time 2.5 – 25.5 (ignore <2.5 on time.)
At least 3 values stated on each axis, but (0,0) can be implied without
stating.

40

B1 All points plotted accurately, (5, 10) etc. scores B0. Curve or line
segments drawn starting at (5.5,10) and passing within ‘1 scale unit’
vertically and horizontally of plotted points

30
20
10
0

5

10

15

20

25
time(sec)
3

© UCLES 2017

October/November
www.dynamicpapers.com
2017

Page 5 of 11

9709/61

Cambridge International AS/A Level – Mark Scheme
PUBLISHED

Question
2(ii)

Answer
48 – 35 = 13
t = 6.5 sec

Marks

October/November
www.dynamicpapers.com
2017
Guidance

M1 Subt 35 (checked ±1 mm on graph) from 48 or 50,
A1 6 ⩽ Ans ⩽ 7
2

Question
3(i)

Answer
p = 0.207

Marks

Guidance

B1
1

3(ii)

Var = 30 × 0.207 × 0.793 = 4.92

B1
1

3(iii)

P(⩾ 2) = 1 – P(0, 1)

M1

 15 
= 1 – (0.793)15 –   (0.207)(0.793)14
1

M1 1 – P(0, 1) seen n =15 p = any prob

= 0.848

A1
3

© UCLES 2017

Page 6 of 11

9709/61

Cambridge International AS/A Level – Mark Scheme
PUBLISHED

Question
4(i)

Answer

Marks

October/November
www.dynamicpapers.com
2017
Guidance

(48.7 × 12 + 38.1× 7)
19

M1 Accept unsimplified (may be separate calculations)

= 44.8

A1
2

4(ii)

7.652 =

Σx 2
− 48.7 2 Σx2 = 29162.55
12

Σy 2
4.2 =
− 38.12
7
2

Combined var =

=

2

Σy = 10284.75

(29162.55 + 10284..75)
– 44.792
19

M1 Substitution in one correct variance formula

A1 One Σx2 or Σy2 correct (can be rounded to 4sf))

M1 Using their Σx2 and Σy2 and their 4(i) in the variance formula

39447.3
– 44.792
19

Combined σ = 8.37 or 8.36

A1
4

© UCLES 2017

Page 7 of 11

9709/61

Cambridge International AS/A Level – Mark Scheme
PUBLISHED

Question

Answer

5(i)

Marks
GNS

x

October/November
www.dynamicpapers.com
2017
Guidance

B1 Must see at least 4 probs correct including one with an x in, correct shape
B1 Shape, clear labels/annotation and all probs correct

E
0.82

1–x

Not GNS
GNS

0.9
0.18
F
0.1
Not GNS
2
5(ii)

0.82x + 0.18 × 0.9 = 0.285

M1 Eqn with x in , two 2-factors on one side

x = 0.15

A1
2

5(iii)

P( E | notGNS ) =

=

P ( E ∩ notGNS)
P ( notGNS)

0.82 × 0.85
= 0.975
1 − 0.285

M1 Attempt at P(E∩not GNS) seen as num or denom of fraction
M1 Attempt at P(not GNS) seen anywhere
A1 Correct answer

3

© UCLES 2017

Page 8 of 11

9709/61

Cambridge International AS/A Level – Mark Scheme
PUBLISHED

Question
6(a)(i)

Answer
40

P5

Marks
M1

= 78 960 960

October/November
www.dynamicpapers.com
2017
Guidance

40

Px or yP5 oe seen, can be mult by k ⩾ 1

A1
2

6(a)(ii)

not front row e.g. WEJ** in 3× 3! = 18 ways

B1 3! seen mult by k⩾1

7 rows in 7 × 18= 126 ways

B1 mult by 7

front row: e.g. *MA** in 4 × 2 = 8 ways

M1 attempt at front row arrangements and multiplying by the 7 other rows
arrangements, need not be correct

Total 126×8 = 1008

A1
4

6(b)

EITHER:
e.g. *R** in 8C3 ways = 56 ways
*L** in 8C3 = 56 ways
**** in 8C4 = 70 ways

(M1 Considering either R or L only in team

M1* Considering neither in team
DM1 summing 3 scenarios

Total 182 ways

A1)

OR1:
No restrictions 10C4 = 210 ways

(M1

*RL* = 8C2 = 28

M1* Considering both in team

210 – 28

DM1 subt

= 182 ways

© UCLES 2017

A1)

Page 9 of 11

10

C4 – , Considering no restrictions with subtraction

9709/61

Cambridge International AS/A Level – Mark Scheme
PUBLISHED

Question
6(b)

Answer

Marks

October/November
www.dynamicpapers.com
2017
Guidance

OR2:
R out in 9C4 = 126 ways
L out in 9C4 = 126 ways

(M1 Considering either R out or L out

Both out in 8C4 = 70

M1* Considering both out
DM1 Summing 2 scenarios and subtracting 1 scenario

126 + 126 – 70 = 182 ways.

A1)
4

Question
7(i)

Answer

Marks

570 − 500 

P( < 570) = P  z <
 = P(z < 0.7650)
91.5 

= 0.7779

M1 Standardising for either 570 or 390, no cc, no sq, no √

390 − 500 

P(< 390) = P  z <
 = P(z < –1.202)
91.5 

A1 One correct z value

= 1 – 0.8853 = 0.1147

A1 One correct Φ, final solution

Large:0.222 (0.2221)
Small: 0.115 (0.1147)

A1 Correct small and large

Medium: 0.663 (0.6632)

A1FT Correct Medium rounding to 0.66 or ft 1 – (their small + their large)
5

© UCLES 2017

Guidance

Page 10 of 11

9709/61

Cambridge International AS/A Level – Mark Scheme
PUBLISHED

Question
7(ii)

Answer

 x − 500 
1.645 = 

 91.5 

Marks

October/November
www.dynamicpapers.com
2017
Guidance

B1 ± 1.645 seen (critical value)

M1 Standardising accept cc, sq, sq rt
A1 650 ⩽ Ans ⩽ 651

x = 651

3
7(iii)

P(x > 610) = 0.1147 (symmetry)

M1 Attempt to find upper end prob x > 610 or Φ(x),
ft their P(< 390) from (i)

0.3 + 0.1147 = 0.4147 ⇒ Φ(x) = 0.5853

M1 Adding 0.3 to their P(x > 610) or subt 0.5 from Φ(x) or 0.8853 – 0.3

z = 0.215 or 0.216

M1 Finding z = Φ–1(0.5853)

0.215 =
k = 520

k − 500
91.5

M1 Standardising and solving, accept cc, sq, sq rt

A1
5