Maths (9709) · Oct/Nov 2012 · Mark scheme 71

Cambridge Maths (9709) mark scheme for paper 71, Oct/Nov 2012 — 9709/71/O/N/12, file 9709_w12_ms_71.pdf.

Advertisement
Loading the paper…
Text of this paper

www.dynamicpapers.com
CAMBRIDGE INTERNATIONAL EXAMINATIONS
GCE Advanced Level

MARK SCHEME for the October/November 2012 series

9709 MATHEMATICS
9709/71

Paper 7, maximum raw mark 50

This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of
the examination. It shows the basis on which Examiners were instructed to award marks. It does not
indicate the details of the discussions that took place at an Examiners’ meeting before marking began,
which would have considered the acceptability of alternative answers.
Mark schemes should be read in conjunction with the question paper and the Principal Examiner
Report for Teachers.

Cambridge will not enter into discussions about these mark schemes.

Cambridge is publishing the mark schemes for the October/November 2012 series for most IGCSE,
GCE Advanced Level and Advanced Subsidiary Level components and some Ordinary Level
components.

www.dynamicpapers.com

Page 2

Mark Scheme
GCE A LEVEL – October/November 2012

Syllabus
9709

Paper
71

Mark Scheme Notes
Marks are of the following three types:
M

Method mark, awarded for a valid method applied to the problem. Method marks are
not lost for numerical errors, algebraic slips or errors in units. However, it is not
usually sufficient for a candidate just to indicate an intention of using some method or
just to quote a formula; the formula or idea must be applied to the specific problem in
hand, e.g. by substituting the relevant quantities into the formula. Correct application
of a formula without the formula being quoted obviously earns the M mark and in some
cases an M mark can be implied from a correct answer.

A

Accuracy mark, awarded for a correct answer or intermediate step correctly obtained.
Accuracy marks cannot be given unless the associated method mark is earned (or
implied).

B

Mark for a correct result or statement independent of method marks.

•

When a part of a question has two or more “method” steps, the M marks are generally
independent unless the scheme specifically says otherwise; and similarly when there are
several B marks allocated. The notation DM or DB (or dep*) is used to indicate that a
particular M or B mark is dependent on an earlier M or B (asterisked) mark in the scheme.
When two or more steps are run together by the candidate, the earlier marks are implied and
full credit is given.

•

The symbol implies that the A or B mark indicated is allowed for work correctly following
on from previously incorrect results. Otherwise, A or B marks are given for correct work
only. A and B marks are not given for fortuitously “correct” answers or results obtained from
incorrect working.

•

Note:

B2 or A2 means that the candidate can earn 2 or 0.
B2/1/0 means that the candidate can earn anything from 0 to 2.

The marks indicated in the scheme may not be subdivided. If there is genuine doubt whether
a candidate has earned a mark, allow the candidate the benefit of the doubt. Unless
otherwise indicated, marks once gained cannot subsequently be lost, e.g. wrong working
following a correct form of answer is ignored.
•

Wrong or missing units in an answer should not lead to the loss of a mark unless the
scheme specifically indicates otherwise.

•

For a numerical answer, allow the A or B mark if a value is obtained which is correct to 3 s.f.,
or which would be correct to 3 s.f. if rounded (1 d.p. in the case of an angle). As stated
above, an A or B mark is not given if a correct numerical answer arises fortuitously from
incorrect working. For Mechanics questions, allow A or B marks for correct answers which
arise from taking g equal to 9.8 or 9.81 instead of 10.

© Cambridge International Examinations 2012

Page 3

www.dynamicpapers.com

Mark Scheme
GCE A LEVEL – October/November 2012

Syllabus
9709

Paper
71

The following abbreviations may be used in a mark scheme or used on the scripts:
AEF

Any Equivalent Form (of answer is equally acceptable)

AG

Answer Given on the question paper (so extra checking is needed to ensure that
the detailed working leading to the result is valid)

BOD

Benefit of Doubt (allowed when the validity of a solution may not be absolutely
clear)

CAO

Correct Answer Only (emphasising that no “follow through” from a previous error
is allowed)

CWO

Correct Working Only – often written by a ‘fortuitous’ answer

ISW

Ignore Subsequent Working

MR

Misread

PA

Premature Approximation (resulting in basically correct work that is insufficiently
accurate)

SOS

See Other Solution (the candidate makes a better attempt at the same question)

SR

Special Ruling (detailing the mark to be given for a specific wrong solution, or a
case where some standard marking practice is to be varied in the light of a
particular circumstance)

Penalties

MR –1

A penalty of MR –1 is deducted from A or B marks when the data of a question or
part question are genuinely misread and the object and difficulty of the question
remain unaltered. In this case all A and B marks then become “follow through ”
marks. MR is not applied when the candidate misreads his own figures – this is
regarded as an error in accuracy. An MR –2 penalty may be applied in particular
cases if agreed at the coordination meeting.

PA –1

This is deducted from A or B marks in the case of premature approximation. The
PA –1 penalty is usually discussed at the meeting.

© Cambridge International Examinations 2012

Page 4

1

(m
)2
2

(m
)2 =
2

2

www.dynamicpapers.com

Mark Scheme
GCE A LEVEL – October/November 2012

∫

m 1
( x ) dx =
0 2

1
2

m = √2 or 1.41 (3 sfs)

A1

H0: Pop mean = 24.0
H1: Pop mean > 24.0

B1

Allow ‘µ’ but not just ‘mean’

M1

Standardise, with √ 150.
Ignore cc. Accept sd/var mixes.
OR find xcrit

= 2.55(2)
Comp z = 2.054 or 2.055
Evidence that Hiergro has incr hts

A1
M1
A1ft [5]

For correct z or area or xcrit
Valid comparison (z values/areas/x values )
Correct conclusion No contradictions
(Note 2 tail test can score B0 M1 A1 M1
(z = 2.326) A1ft)

(i) Mean = 500 + 3 × 142
= 926 (cents)

B1

4.8
150

[3]

(Note: ±√2 as final answer scores A0)

M1
A1 [3]

Or 9 × 352 seen
Accept √11025

(ii) Mean = 6 × ‘926’ = 5556 (cents)
6 × ‘105’2
(= 66150)
(SD = √66150)
= 257 (cents) (3 sf)

B1ft
M1

or SD = √6 × ‘105’.

(i) P(X Y 1) = (0.75)20 + 20(0.75)19(0.25)
= 0.0243

M1
A1

SD = 3 × 35
= 105 (cents)

4

2

M1

25− 24

3

Paper
71

y = 1 x (attempt at linear equ with c = 0)

M1
1
2

Syllabus
9709

P(X Y 2) = (0.75)20 + 20(0.75)19(0.25) +
20
C2(0.75)18(0.25)2
= 0.0913 or 0.0912
Critical region is 0 or 1 pkt contain gift
or < 2 pkts contain gift oe

A1

[3]

Accept √66150
Attempt correct expression
Attempt correct expression
OR Find P(2)
= 0.0669 or 0.0670

M1
A1
A1

ft their (i)

[5]

dep M1M1 & their P(X Y=1) < 0.05 < their
P(X Y=2)
(S.R. Use of Normal: N(5.3.752) used B1
–1.645=(x + 0.5 – 5)/√3.75 M1 x < 1.31 A1
(3/5))

(ii) P(Type I) = 0.0243 (3 sfs)

B1ft [1]

ft their P(X Y 1) dep < 0.05 ft Normal

(iii) 2 is outside rej reg
No evidence to reject claim

M1
A1ft [2]

or P(X Y 2) > 0.05
No contradictions

© Cambridge International Examinations 2012

www.dynamicpapers.com

Page 5

5

(i)

Mark Scheme
GCE A LEVEL – October/November 2012

5
k
dx
3 x −1

∫

=1

[kln(x – 1)]

5

=1
3
k(ln4 – ln2) = 1
kln2 = 1
(k = ln12 AG)
(ii)

1
ln 2

∫

x

1
dx
3 x −1

Attempt integ f(x) & ‘= 1’ ignore limits

A1

Correctly integrated; ignore limits

M1
A1 [4]

Subst of limits 3, 5
No errors seen. No decimals seen

= 0.75

M1*

1 (ln(x – 1) – ln2) = 0.75
ln 2
ln (x – 1) = (0.75 × ln2 + ln2)
ln (x – 1) = 1.75 × ln2
x – 1 = 21.75 or x – 1 = 3.36
x = 4.36 (3 sfs)
(i) Excludes children
Excludes people without phones
More than one person in some houses
Some ex-directory
38 (1 − 38 )
200 ( = 0.0007695)
200
(ii) Var(p) =
200
z = 2.576
38 (1 − 38 )
38 ± z 200
200
200
200
0.119 to 0.261 (3 sfs)

7

Attempt integ f(x), unknown limit, & ‘= 0.75’or
‘= 0.25’

A1
oe. Fully correct equn after subst limits

M1
dep*
A1 [4]

B1

Seen

M1

For correct form of CI

A1

(‘0.9642’ – (1 – ‘0.9642’) = 0.9284)
x = 93 (2 sfs)

A1

E

(1 + 4.8 +

= 0.294 (3 sfs)

or other implying directory excludes some
people

B1

M1
A1
M1

(i) λ = 4.8

[1]

oe. Correct manipulation of logs to find x

M1

(iii) z × ‘√0.0007695’ = 0.05
z = 1.802
Φ(‘1.802’)
(= 0.9642)

–4.8

Paper
71

M1

1 [ln(x – 1)] x = 0.75
ln 2
3

6

Syllabus
9709

[4]

Accept 0.262
Must be an interval
z × (their sd of p) = 0.05. Allow = 0.1
Attempt Φ(their z) and find 2Φ –1

[4]

B1
2

4 .8
2!

+

3

4.8
3!

)

M1
A1 [3]

P(R = 0, 1, 2 or 3), their λ allow one end error

© Cambridge International Examinations 2012

www.dynamicpapers.com

Page 6

(ii) e–λ ×
2

λ
12

=

Mark Scheme
GCE A LEVEL – October/November 2012
λ4
4!

=

16
3

e–λ ×

λ2
2!

or without e–λ

16
3

or better

(λ = 8)
λ = 1.6n seen or implied
n = ‘8’ ÷ 1.6
=5
(iii) T~N(64, 64)
75.5 − 64
64
1 – Φ(‘1.4375’)
= 0.0753 to 0.0754

λ = 1.6n seen or implied

M1

–1.6n

(1.6 n ) 4
4!

A1

e

B1

(1.6 n ) 2
=
12

A1

Syllabus
9709

[4]

×

16
3

=

16
3

e

1.6n

×

or better

(1.6n = 8)
n=5

Paper
71

B1
(1.6 n ) 2
2!

M1
A1
A1

B1

May be implied

(= 1.4375)

M1

Allow with wrong or no cc. No sd/var mixes

(= 1 – 0.9247)

M1
A1 [4]

Finding correct area consistent with their
working

© Cambridge International Examinations 2012

Advertisement