Maths (9709) · Oct/Nov 2007 · Mark scheme 7

Cambridge Maths (9709) mark scheme for paper 7, Oct/Nov 2007 — 9709/7/O/N/07, file 9709_w07_ms_7.pdf.

Advertisement
Loading the paper…
Text of this paper

www.dynamicpapers.com
UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS
GCE Advanced Subsidiary Level and GCE Advanced Level

MARK SCHEME for the October/November 2007 question paper

9709 MATHEMATICS
9709/07

Paper 7, maximum raw mark 50

This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of
the examination. It shows the basis on which Examiners were instructed to award marks. It does not
indicate the details of the discussions that took place at an Examiners’ meeting before marking began.
All Examiners are instructed that alternative correct answers and unexpected approaches in
candidates’ scripts must be given marks that fairly reflect the relevant knowledge and skills
demonstrated.
Mark schemes must be read in conjunction with the question papers and the report on the
examination.

•

CIE will not enter into discussions or correspondence in connection with these mark schemes.

CIE is publishing the mark schemes for the October/November 2007 question papers for most IGCSE,
GCE Advanced Level and Advanced Subsidiary Level syllabuses and some Ordinary Level
syllabuses.

Page 2

www.dynamicpapers.com

Mark Scheme
GCE A/AS LEVEL – October/November 2007

Syllabus
9709

Paper
07

Mark Scheme Notes
Marks are of the following three types:
M

Method mark, awarded for a valid method applied to the problem. Method marks
are not lost for numerical errors, algebraic slips or errors in units. However, it is not
usually sufficient for a candidate just to indicate an intention of using some method
or just to quote a formula; the formula or idea must be applied to the specific
problem in hand, e.g. by substituting the relevant quantities into the formula. Correct
application of a formula without the formula being quoted obviously earns the M
mark and in some cases an M mark can be implied from a correct answer.

A

Accuracy mark, awarded for a correct answer or intermediate step correctly
obtained. Accuracy marks cannot be given unless the associated method mark is
earned (or implied).

B

Mark for a correct result or statement independent of method marks.

•

When a part of a question has two or more "method" steps, the M marks are generally
independent unless the scheme specifically says otherwise; and similarly when there are
several B marks allocated. The notation DM or DB (or dep*) is used to indicate that a
particular M or B mark is dependent on an earlier M or B (asterisked) mark in the scheme.
When two or more steps are run together by the candidate, the earlier marks are implied
and full credit is given.

•

The symbol √ implies that the A or B mark indicated is allowed for work correctly
following on from previously incorrect results. Otherwise, A or B marks are given for
correct work only. A and B marks are not given for fortuitously "correct" answers or
results obtained from incorrect working.

•

Note:

B2 or A2 means that the candidate can earn 2 or 0.
B2/1/0 means that the candidate can earn anything from 0 to 2.

The marks indicated in the scheme may not be subdivided. If there is genuine doubt
whether a candidate has earned a mark, allow the candidate the benefit of the doubt.
Unless otherwise indicated, marks once gained cannot subsequently be lost, e.g. wrong
working following a correct form of answer is ignored.
•

Wrong or missing units in an answer should not lead to the loss of a mark unless the
scheme specifically indicates otherwise.

•

For a numerical answer, allow the A or B mark if a value is obtained which is correct to 3
s.f., or which would be correct to 3 s.f. if rounded (1 d.p. in the case of an angle). As
stated above, an A or B mark is not given if a correct numerical answer arises fortuitously
from incorrect working. For Mechanics questions, allow A or B marks for correct answers
which arise from taking g equal to 9.8 or 9.81 instead of 10.

© UCLES 2007

Page 3

www.dynamicpapers.com

Mark Scheme
GCE A/AS LEVEL – October/November 2007

Syllabus
9709

Paper
07

The following abbreviations may be used in a mark scheme or used on the scripts:
AEF

Any Equivalent Form (of answer is equally acceptable)

AG

Answer Given on the question paper (so extra checking is needed to ensure
that the detailed working leading to the result is valid)

BOD

Benefit of Doubt (allowed when the validity of a solution may not be absolutely
clear)

CAO

Correct Answer Only (emphasising that no "follow through" from a previous
error is allowed)

CWO

Correct Working Only - often written by a ‘fortuitous' answer

ISW

Ignore Subsequent Working

MR

Misread

PA

Premature Approximation (resulting in basically correct work that is
insufficiently accurate)

SOS

See Other Solution (the candidate makes a better attempt at the same
question)

SR

Special Ruling (detailing the mark to be given for a specific wrong solution, or a
case where some standard marking practice is to be varied in the light of a
particular circumstance)

Penalties

MR -1

A penalty of MR -1 is deducted from A or B marks when the data of a question
or part question are genuinely misread and the object and difficulty of the
question remain unaltered. In this case all A and B marks then become "follow
through √" marks. MR is not applied when the candidate misreads his own
figures - this is regarded as an error in accuracy. An MR-2 penalty may be
applied in particular cases if agreed at the coordination meeting.

PA -1

This is deducted from A or B marks in the case of premature approximation.
The PA -1 penalty is usually discussed at the meeting.

© UCLES 2007

Page 4

1

www.dynamicpapers.com

Mark Scheme
GCE A/AS LEVEL – October/November 2007

H0 p = 0.3
H1 p < 0.3

Syllabus
9709

Paper
07

B1

Both hypotheses correct

P(0, 1, 2 ) = 0.718+0.3 × 0.717 × 18C1
+ 0.32 × 0.716 × 18C2
= 0.001628+0.01256+0.04576
= 0.0599

M1

For finding P(0, 1, 2) at least two terms of this
sum needed

A1

Correct answer accept 0.06(0)

This is > 0.05
Accept Isaac’s claim.

M1
A1ft

Comparing with 0.05 must be 0.05
Correct conclusion ft their test statistic – no
contradictions

B1

Both hypotheses correct

M1
A1
M1
A1ft

For attempt at z with or without cc
For correct z
For comparison
Correct conclusion ft their test statistic

B1

Both hypotheses correct

M1
A1

For attempt at z with or without cc
For correct z

OR Using N(0.3,0.0116)
H0 p=0.3
H1 p<0.3
z=0.111 +1/36 – 0.3 = -1.49159
√0.0116
-1.49159>-1.645
Accept Isaac’s claim
OR Using N(5.4,3.78)
H0 µ=5.4
H1 µ<5.4
z=2.5 –5.4= -1.49159
√3.78
-1.49159>-1.645
Accept Isaac’s claim

c − 3.2
c = 2.47
1.4 / 10
rejection region is x < 2.47

2 (i) -1.645 =

(ii) m < 2.47
3 (i) a sample where every element has an
equal chance of being chosen
OR a random sample of size n is a sample
chosen in such a way that each possible
group of size n has the same chance of
being picked.
(ii) 130/350 (0.371)
(0.371)(0.629)
0.371 ± 1.96 ×
350
= 0.371 ± 0.050609
= (0.321, 0.422)

(iii) 1.96

(0.371)(0.629)
= 0.02
n

n = 2241or 2242 or 2243 or 2240

M1
A1ft

5

M1
B1
A1
A1ft

4

B1ft

1

B1

1

For comparison
Correct conclusion ft their test statistic
For standardising, must have sq rt. and z value
For ± 1.645 used
For 2.47
For inequality correct way round (ft their 2.47
but must be <3.2)
ft on their (i)

B1

For proportion used

M1

Correct shape x ± zs / n

B1
A1

Correct z value 1.96 used
Correct limits (written as interval)

4

M1*
M1*dep
A1
3

Seeing an equation involving 0.02 or 0.04, n in
denom and a sq rt and proportions used
For equation of correct form
Correct whole number answer

© UCLES 2007

www.dynamicpapers.com

Page 5

Mark Scheme
GCE A/AS LEVEL – October/November 2007

4 (i) E (cost to Stella) = 600 + 5.52 × 500
= 3360
Var (cost to Stella) = 5.522 × 7.12
= 1540 (1536)

M1
A1
M1
M1
A1

(ii) P (D > 2S) = P(D – 2S >0)
D – 2S ~ N(-120, 421 + 4 × 1536)
~ N(-120, 6565)
120
)
P(D-2S > 0) = P( z >
6565
= P(z > 1.481)
= 0.0693

b

x
5 (i) E(X) = ∫ dx =
0 b

b

 x2 
b
  =
 2b  0 2

b2
x2 b2
=
Var (X) = ∫ −
4
12
0 b

5

Syllabus
9709

Paper
07

For multiplying by 5.52 and adding 600
Correct mean
For mult 7.1/7.12 /50.412 by 5.522
For 5.52(2) x 7.1(2) or 50.412 with
addition/subtraction
For correct answer

M1
B1
A1ft

For attempt (D-2S) (or equiv) either < or > 0
For correct mean (seen or implied)
For correct unsimplified variance

M1

For standardising attempt

A1

5

no

For correct answer, accept 0.069

B1

Correct answer (accept unsimplified)

M1

For (substituted) attempt at ∫ x 2 f ( x) dx − [ E ( X ) 2 ] ie

− [ E ( X 2 )] must be seen even if ignored in next line

b

A1

3

Correct answer. Accept unsimplified – but must be a
single fraction.

(ii) 9.5 = b/2
b = 19 AG

M1
A1

2

Equating their mean to their 9.5
Correct answer

(iii) 8/19 or 0.421

B1

1

Correct answer

(iv) X ~ N (9.5, 30.08 / 336)
or using totals N(3192,10106.88)

M1
A1ft

Dividing their b2/12 by 336
Correct mean and variance

M1

Standardising (must involve 336) and area < 0.5
or consistent with their figures

P( X < 9) = P z <

9 − 9.5 
 or equiv
30.08 / 336 

= P(z < -1.671)
= 1 – 0.9526
= 0.0474

A1

4

Correct answer

© UCLES 2007

Page 6

www.dynamicpapers.com

Mark Scheme
GCE A/AS LEVEL – October/November 2007

e − λ λ2
e − λ λ4
=3
2!
4!
λ=2
new λ = 7

7 2 73 
P(X > 3) = 1 − e − 7 1 + 7 +
+ 
2
!
3! 

6 (i)

= 0.918

Syllabus
9709

Paper
07

M1

Poisson equation involving λ

A1

Correct mean

B1ft

New mean ft 3.5 × previous one

M1

Poisson probs with their mean (at least 3 probs) and
1-

A1

5

Correct answer

(ii) (a) λ = 1.3k
P(X > 0) = 1 – e-1.3k = 0.96
0.04 = e-1.3k
k = 2.48

B1
M1
A1
A1

(b) X~ N(1300, 1300)
1250.5 − 1300 

P(X > 1250) = P z >

1300


= P(z > -1.373)
= 0.915

B1

correct mean and variance

M1

standardising must have sq rt with or without cc

A1

Correct new mean
Equation with k or λ in involving 1 – P(0) = 0.96

4

3

correct equation
correct answer

correct answer

© UCLES 2007

Advertisement