Maths (9709) · May/June 2017 · Mark scheme 63

Cambridge Maths (9709) mark scheme for paper 63, May/June 2017 — 9709/63/M/J/17, file 9709_s17_ms_63.pdf.

Advertisement
Loading the paper…
Text of this paper

www.dynamicpapers.com

Cambridge International Examinations
Cambridge International Advanced Subsidiary and Advanced Level

MATHEMATICS

9709/63

Paper 6

May/June 2017

MARK SCHEME
Maximum Mark: 50

Published

This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of the
examination. It shows the basis on which Examiners were instructed to award marks. It does not indicate the
details of the discussions that took place at an Examiners’ meeting before marking began, which would have
considered the acceptability of alternative answers.
Mark schemes should be read in conjunction with the question paper and the Principal Examiner Report for
Teachers.
Cambridge will not enter into discussions about these mark schemes.
Cambridge is publishing the mark schemes for the May/June 2017 series for most Cambridge IGCSE®,
Cambridge International A and AS Level and Cambridge Pre-U components, and some Cambridge O Level
components.

® IGCSE is a registered trademark.

This document consists of 9 printed pages.
© UCLES 2017

[Turn over

May/June 2017
Cambridge International AS/A Level – Mark
Scheme
www.dynamicpapers.com
PUBLISHED

9709/63

Mark Scheme Notes
Marks are of the following three types:
M

Method mark, awarded for a valid method applied to the problem. Method marks are not lost
for numerical errors, algebraic slips or errors in units. However, it is not usually sufficient for a
candidate just to indicate an intention of using some method or just to quote a formula; the
formula or idea must be applied to the specific problem in hand, e.g. by substituting the
relevant quantities into the formula. Correct application of a formula without the formula being
quoted obviously earns the M mark and in some cases an M mark can be implied from a
correct answer.

A

Accuracy mark, awarded for a correct answer or intermediate step correctly obtained.
Accuracy marks cannot be given unless the associated method mark is earned (or implied).

B

Mark for a correct result or statement independent of method marks.

•

When a part of a question has two or more “method” steps, the M marks are generally
independent unless the scheme specifically says otherwise; and similarly when there are several
B marks allocated. The notation DM or DB (or dep*) is used to indicate that a particular M or B
mark is dependent on an earlier M or B (asterisked) mark in the scheme. When two or more
steps are run together by the candidate, the earlier marks are implied and full credit is given.

•

The symbol FT implies that the A or B mark indicated is allowed for work correctly following on
from previously incorrect results. Otherwise, A or B marks are given for correct work only. A and
B marks are not given for fortuitously “correct” answers or results obtained from incorrect
working.
•

Note:

B2 or A2 means that the candidate can earn 2 or 0.
B2/1/0 means that the candidate can earn anything from 0 to 2.

The marks indicated in the scheme may not be subdivided. If there is genuine doubt whether a
candidate has earned a mark, allow the candidate the benefit of the doubt. Unless otherwise
indicated, marks once gained cannot subsequently be lost, e.g. wrong working following a correct
form of answer is ignored.
•

Wrong or missing units in an answer should not lead to the loss of a mark unless the scheme
specifically indicates otherwise.

•

For a numerical answer, allow the A or B mark if a value is obtained which is correct to 3 s.f., or
which would be correct to 3 s.f. if rounded (1 d.p. in the case of an angle). As stated above, an A
or B mark is not given if a correct numerical answer arises fortuitously from incorrect working. For
Mechanics questions, allow A or B marks for correct answers which arise from taking g equal to
9.8 or 9.81 instead of 10.

© UCLES 2017

Page 2 of 9

9709/63

May/June 2017
Cambridge International AS/A Level – Mark
Scheme
www.dynamicpapers.com
PUBLISHED

The following abbreviations may be used in a mark scheme or used on the scripts:
AEF/OE Any Equivalent Form (of answer is equally acceptable) / Or Equivalent
AG

Answer Given on the question paper (so extra checking is needed to ensure that the
detailed working leading to the result is valid)

CAO

Correct Answer Only (emphasising that no “follow through” from a previous error is
allowed)

CWO

Correct Working Only – often written by a ‘fortuitous’ answer

ISW

Ignore Subsequent Working

SOI

Seen or implied

SR

Special Ruling (detailing the mark to be given for a specific wrong solution, or a case
where some standard marking practice is to be varied in the light of a particular
circumstance)

Penalties
MR –1 A penalty of MR –1 is deducted from A or B marks when the data of a question or part
question are genuinely misread and the object and difficulty of the question remain
unaltered. In this case all A and B marks then become “follow through” marks. MR is not
applied when the candidate misreads his own figures – this is regarded as an error in
accuracy. An MR –2 penalty may be applied in particular cases if agreed at the
coordination meeting.
PA –1

© UCLES 2017

This is deducted from A or B marks in the case of premature approximation. The PA –1
penalty is usually discussed at the meeting.

Page 3 of 9

9709/63

Question
1

Cambridge International AS/A Level – Mark Scheme
PUBLISHED
Answer

Marks
B1 SOI

P(sum is 9) = P(3, 6) + P(4, 5) + P(5, 4) + P(6, 3)

M1 Identifying the four ways of summing to 9 (3,6), (6,3) (4,5) and
(5,4)

= (0.03 + 0.02) × 2

M1 Mult 2 probs together to find one correct prob of (3,6), (6,3)
(4,5) or (5,4) unsimplified

= 0.1

A1 OE
4

np = 270 × 1/3 = 90, npq = 270 × 1/3 × 2/3 = 60

B1 Correct unsimplified np and npq, SOI

99.5 − 90 

P ( x > 100 ) = P  z >
 = P(z > 1.2264)
60 

M1 ±Standardising using 100 need sq rt
M1 Continuity correction, 99.5 or 100.5 used

= 1 – 0.8899

M1 Correct area 1 – Φ implied by final prob. < 0.5

= 0.110

A1
Total:

3(i)

Guidance

P(6) = 0.3

Total:
2

May/June
2017
www.dynamicpapers.com

5

P(S) = 0.65 × 0.6 + 0.35 × 0.75

M1

= 0.653 (261/400)

A1
Total:

© UCLES 2017

Page 4 of 9

2

Summing two 2-factor probs or 1 – (sum of two 2-factor probs)

9709/63

Question
3(ii)

Cambridge International AS/A Level – Mark Scheme
PUBLISHED
Answer

P ( Std L ) =

Marks

May/June
2017
www.dynamicpapers.com

Guidance

M1 ‘P(Std)’ × ‘P(L/Std)’as num of a fraction. Could be from tree
diagram in 3(i).

P( Std ∩ L) 0.35 × 0.25
=
= 0.0875/0.3475
1 − 0.6525
P( L)

M1 Denominator (1 - their (i)) or their (i)
or 0.65 × 0.4(or 0.6) + 0.35 × 0.25(or 0.75) = 0.26+0.0875
or P(L) from their tree diagram
= 0.252 (35/139)

A1
Total:

4(a)

0−µ 

P(x > 0) = P  z > ±
σ 


−µ 
−1.5σ 

= P z >
 or P  z >
µ /1.5 
σ 

M1 ±Standardising, in terms of µ and/or σ with 0 - …. in numerator,
no continuity correction, no √

= P(z > -1.5)

A1 Obtaining z value of ±1.5 by eliminating µ and σ, SOI

= 0.933

A1
Total:

4(b)

3

B1 ± z value rounding to 1.1 or 1.2

z = –1.151

−1.151 =

70 − 120
s

M1 ± Standardising (using 70) equated to a z-value, no cc, no
squaring, no √

σ = 43.4 or 43.5

A1
Totals:

© UCLES 2017

3

Page 5 of 9

3

9709/63

Question
5(i)

Cambridge International AS/A Level – Mark Scheme
PUBLISHED
Answer

Marks

B1 Any one condition of these two

independent trials/events

B1 The other condition

6(a)(i)

M1 Bin term 7Cx(0.7)x(0.3)7-x , x ≠ 0, 7
A1 Correct unsimplified answer (sum) OE

= 0.647

A1
3

P(0, 1, 2, 3, 4) = 1 – their ‘0.6471’ = 0.3529

M1 Find P( -4 ) either by subtracting their (ii) from 1 or from
adding
Probs of 0,1,2,3,4 with n=7 (or 10) and p = 0.7

P(3) = 10C3(0.3529)3(0.6471)7

M1

= 0.251

A1

First digit in 2 ways. 2 × 4 × 3 × 2 or 2 × 4P3

M1 1, 2 or 3 × 4P3 OE as final answer

Total = 48 ways

A1
Total:

6(a)(ii)

2

P(5, 6, 7) = 7C5(0.7)5(0.3)2 + 7C6(0.7)6(0.3)1 + (0.7)7

Total:
5(iii)

Guidance

constant probability (of completing)

Totals:
5(ii)

May/June
2017
www.dynamicpapers.com

10

C3 (their 0.353)3(1 – their 0.353)7 on its own

2

2×5×5×3

M1 Seeing 52 mult; this mark is for correctly considering the middle
two digits with replacement
M1 Mult by 6; this mark is for correctly considering the first and last
digits

= 150 ways

A1
Totals:

© UCLES 2017

Page 6 of 9

3

9709/63

Question
6(b)(i)

Cambridge International AS/A Level – Mark Scheme
PUBLISHED
Answer

Marks

OO**** in 18C4 ways

M1

= 3060

A1
Totals:

© UCLES 2017

Page 7 of 9

2

May/June
2017
www.dynamicpapers.com

Guidance
18

Cx or the sum of five 2-factor products with n = 14 and 4, may
be × by 2C2:
4C0 × 14C4 + 4C1 × 14C3 + 4C2 × 14C2 + 4C3 × 14C1 + 4C4
(× 14C0)

9709/63

Question

Answer

6(b)(ii)

Choc
0
1
2

Marks

Choc
0
0
0
1
1
1
2
2
2

Oats
0
1
2
0
1
2
0
1
2

Ginger
6
5
4
5
4
3
4
3
2

Total = 36400 ways

M1 sum the number of ways with 0, 1 and 2 chocs and two must be
totally correct, unsimplified
OR
sum the nine combinations of choc, ginger, oats, six must be
totally correct, unsimplified
M1 dividing by 20C6 (38760) oe

20

Probability = 36400/ C6
= 0.939 (910/969)

A1
Totals:

freq = fd × cw 10, 40, 120, 30

4
M1 Attempt to multiply at least 3 fds by their ‘class widths’
A1

Totals:

© UCLES 2017

Guidance

B1 The correct number of ways with one of 0, 1 or 2 chocs ,
unsimplified
or any three correct number of ways of combining
choc/oat/ginger, unsimplified

Not Choc
6= 1 × 16 C6 = 8008 0.2066
5= 4 C1 × 16 C5 = 17472 0.4508
4= 4 C2 × 16 C4 = 10920 0.2817

OR

7(i)

May/June
2017
www.dynamicpapers.com

Cambridge International AS/A Level – Mark Scheme
PUBLISHED

Page 8 of 9

2

9709/63

Question

Answer

7(ii)

May/June
2017
www.dynamicpapers.com

Cambridge International AS/A Level – Mark Scheme
PUBLISHED
Marks

Guidance

length

<5

< 10

< 20

< 25

B1 3 or more correct cfs heights on graph 10, 50, 170, 200

cf

10

50

170

200

B1 Labels correct cf and length(cm), linear scales from zero (allow
0.5 on horizontal axis)

cf
200

M1 Attempt (at least three) at plotting at upper end points (either 5
or 5.5, 10 or 10.5 etc.)

150

A1 Starting at (0, 0) polygon or smooth curve increasing with
plotted points at lengths 5, 10, 20 and 25

100
50
0
5

10

15

20

25
length (cm)
Totals:

7(iii)

4

median = 14.2

B1 Median (accept 13.2 – 15.2)

‘18.5’ – ‘10’

M1 Subt their LQ from their UQ if reasonable from their graph

IQ range = 8.5

A1FT Correct FT using LQ = 10 and UQ between 17.5 and 19.5
Totals:

7(iv)

3

mean = (2.5×10 + 7.5×40 + 15×120 + 22.5×30) / 200

M1 Using mid points (± 0.5) and their frequencies from 7(i) in
correct formula

= 14

A1
Totals:

© UCLES 2017

Page 9 of 9

2

Advertisement