Accounting (9706) · Oct/Nov 2024 · Mark scheme 43
Cambridge Accounting (9706) mark scheme for paper 43, Oct/Nov 2024 — 9706/43/O/N/24, file 9706_w24_ms_43.pdf.
Text of this paper
www.dynamicpapers.com
Cambridge International AS & A Level
ACCOUNTING
9706/43
Paper 4 Cost and Management Accounting
October/November 2024
MARK SCHEME
Maximum Mark: 50
Published
This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of the
examination. It shows the basis on which Examiners were instructed to award marks. It does not indicate the
details of the discussions that took place at an Examiners’ meeting before marking began, which would have
considered the acceptability of alternative answers.
Mark schemes should be read in conjunction with the question paper and the Principal Examiner Report for
Teachers.
Cambridge International will not enter into discussions about these mark schemes.
Cambridge International is publishing the mark schemes for the October/November 2024 series for most
Cambridge IGCSE, Cambridge International A and AS Level components, and some Cambridge O Level
components.
This document consists of 13 printed pages.
© Cambridge University Press & Assessment 2024
[Turn over
9706/43
October/November 2024
www.dynamicpapers.com
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Generic Marking Principles
These general marking principles must be applied by all examiners when marking candidate answers. They should be applied alongside the
specific content of the mark scheme or generic level descriptions for a question. Each question paper and mark scheme will also comply with these
marking principles.
GENERIC MARKING PRINCIPLE 1:
Marks must be awarded in line with:
•
•
•
the specific content of the mark scheme or the generic level descriptors for the question
the specific skills defined in the mark scheme or in the generic level descriptors for the question
the standard of response required by a candidate as exemplified by the standardisation scripts.
GENERIC MARKING PRINCIPLE 2:
Marks awarded are always whole marks (not half marks, or other fractions).
GENERIC MARKING PRINCIPLE 3:
Marks must be awarded positively:
•
•
•
•
•
marks are awarded for correct/valid answers, as defined in the mark scheme. However, credit is given for valid answers which go beyond
the scope of the syllabus and mark scheme, referring to your Team Leader as appropriate
marks are awarded when candidates clearly demonstrate what they know and can do
marks are not deducted for errors
marks are not deducted for omissions
answers should only be judged on the quality of spelling, punctuation and grammar when these features are specifically assessed by the
question as indicated by the mark scheme. The meaning, however, should be unambiguous.
GENERIC MARKING PRINCIPLE 4:
Rules must be applied consistently, e.g. in situations where candidates have not followed instructions or in the application of generic level
descriptors.
© Cambridge University Press & Assessment 2024
Page 2 of 13
9706/43
October/November 2024
www.dynamicpapers.com
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
GENERIC MARKING PRINCIPLE 5:
Marks should be awarded using the full range of marks defined in the mark scheme for the question (however; the use of the full mark range may
be limited according to the quality of the candidate responses seen).
GENERIC MARKING PRINCIPLE 6:
Marks awarded are based solely on the requirements as defined in the mark scheme. Marks should not be awarded with grade thresholds or
grade descriptors in mind.
© Cambridge University Press & Assessment 2024
Page 3 of 13
October/November 2024
www.dynamicpapers.com
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Social Science-Specific Marking Principles
(for point-based marking)
9706/43
1
Components using point-based marking:
• Point marking is often used to reward knowledge, understanding and application of skills. We give credit where the candidate’s answer
shows relevant knowledge, understanding and application of skills in answering the question. We do not give credit where the answer
shows confusion.
From this it follows that we:
a
b
c
d
e
f
g
2
DO credit answers which are worded differently from the mark scheme if they clearly convey the same meaning (unless the mark
scheme requires a specific term)
DO credit alternative answers/examples which are not written in the mark scheme if they are correct
DO credit answers where candidates give more than one correct answer in one prompt/numbered/scaffolded space where extended
writing is required rather than list-type answers. For example, questions that require n reasons (e.g. State two reasons …).
DO NOT credit answers simply for using a ‘key term’ unless that is all that is required. (Check for evidence it is understood and not used
wrongly.)
DO NOT credit answers which are obviously self-contradicting or trying to cover all possibilities
DO NOT give further credit for what is effectively repetition of a correct point already credited unless the language itself is being tested.
This applies equally to ‘mirror statements’ (i.e. polluted/not polluted).
DO NOT require spellings to be correct, unless this is part of the test. However spellings of syllabus terms must allow for clear and
unambiguous separation from other syllabus terms with which they may be confused (e.g. Corrasion/Corrosion)
Presentation of mark scheme:
• Slashes (/) or the word ‘or’ separate alternative ways of making the same point.
• Semi colons (;) bullet points (•) or figures in brackets (1) separate different points.
• Content in the answer column in brackets is for examiner information/context to clarify the marking but is not required to earn the mark
(except Accounting syllabuses where they indicate negative numbers).
© Cambridge University Press & Assessment 2024
Page 4 of 13
9706/43
October/November 2024
www.dynamicpapers.com
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
3
Calculation questions:
• The mark scheme will show the steps in the most likely correct method(s), the mark for each step, the correct answer(s) and the mark
for each answer
• If working/explanation is considered essential for full credit, this will be indicated in the question paper and in the mark scheme. In all
other instances, the correct answer to a calculation should be given full credit, even if no supporting working is shown.
• Where the candidate uses a valid method which is not covered by the mark scheme, award equivalent marks for reaching equivalent
stages.
• Where an answer makes use of a candidate’s own incorrect figure from previous working, the ‘own figure rule’ applies: full marks will be
given if a correct and complete method is used. Further guidance will be included in the mark scheme where necessary and any
exceptions to this general principle will be noted.
4
Annotation:
• For point marking, ticks can be used to indicate correct answers and crosses can be used to indicate wrong answers. There is no direct
relationship between ticks and marks. Ticks have no defined meaning for levels of response marking.
• For levels of response marking, the level awarded should be annotated on the script.
• Other annotations will be used by examiners as agreed during standardisation, and the meaning will be understood by all examiners
who marked that paper.
© Cambridge University Press & Assessment 2024
Page 5 of 13
October/November 2024
www.dynamicpapers.com
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
9706/43
ANNOTATIONS
The following annotations are used in marking this paper and should be used by examiners.
Annotation
Use or meaning
Correct and relevant point made in answering the question.
×
Incorrect point or error made.
LNK
Two statements are linked.
REP
Repeat
A
An extraneous figure
N0
No working shown
AE
Attempts evaluation
R1
Required item 1
R2
Required item 2
OF
Own figure
EVAL
Evaluation
NAQ
Not answered question
BOD
Benefit of the doubt given.
SEEN
Noted but no credit given
Highlight
Highlight
Off page
Comment
Off page comment
© Cambridge University Press & Assessment 2024
Page 6 of 13
9706/43
October/November 2024
www.dynamicpapers.com
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Abbreviations and guidance
The following abbreviations may be used in the mark scheme:
OF = own figure. The answer will be marked correct if a candidate has correctly used their own figure from a previous part or calculation.
W = working. The working for a figure is given below. Where the figure has more than one mark associated with it, the working will show where
individual marks are to be awarded.
CF = correct figure. The figure has to be correct i.e. no extraneous items have been included in the calculation
Extraneous item = an item that should not have been included in a calculation, including indirect expenses such as salaries in calculation of
gross profit when there is one OF mark for gross profit’
Curly brackets, }, are used to show where one mark is given for more than one figure. If the figures are not adjacent, each is marked with a
curly bracket and a symbol e.g. }*
row = all figures in the row must be correct for this mark to be awarded
Marks for figures are dependent on correct sign/direction
Accept other valid responses. This statement indicates that marks may be awarded for answers that are not listed in the mark scheme but are
equally valid.
© Cambridge University Press & Assessment 2024
Page 7 of 13
October/November 2024
www.dynamicpapers.com
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
9706/43
Question
1(a)
Answer
Define the term ‘master budget’.
2
A master budget is a comprehensive financial plan (1).
(1) further development mark is to give identifying at least three components of the master budgets, including:
• operating budget (sales budget, purchases budget, trade receivables budget and trade payables budget;
• financial budget (cash budget, budgeted statement of profit or loss and budgeted statement of financial position)
Accept other valid responses.
© Cambridge University Press & Assessment 2024
Marks
Page 8 of 13
October/November 2024
www.dynamicpapers.com
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
9706/43
Question
1(b)
Answer
Marks
Prepare the cash budget for each of the months of January, February and March 2025.
January
$
Receipts from cash sales
Receipts from credit customers W1
February
$
30 000 }
30 000
Expenditure
Equipment
15 000 }*
}*(1
16 000 )
10 000 (1)
Salaries
Cash payment to a supplier
Payment to other suppliers W2
Other operating expenses W3
Sales commission
24 325 (1)
Net deficit for the month
W1: 2500 $60 80% 30% 98% = 35280
W2:
January
$
Sales revenue
Cost of sales
Purchases
Payment to credit suppliers 90%
20 000
12 000
90 000
34 750
100 000
65 325
156 750
(65 325)
(126 750)
(1)
(1)
(1)
}**
February
$
150 000
100 000
March
$
180 000
120 000
120 000
90 000
144 000
108 000
14
March
$
36 000 }(1)
35 280 (1)
71 280
25 000
14 400
108 000
34 750
6 000
188 150
(1)
(1)
(1)
}**(1)
(1)
(116 870) (1)OF row
April
$
216 000
144 000
W3: Depreciation ($15 000 20%) / 12=$250
($35 000 – $250) = $34 750
$34 750 70% = $24 325
1(c)
Calculate the total amount of capital that Mo has to invest on 1 January 2025.
($65 325 + $126 750 + $116 870) (1)OF + $80 000 = $388 945(1)OF
© Cambridge University Press & Assessment 2024
Page 9 of 13
2
October/November 2024
www.dynamicpapers.com
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
9706/43
Question
1(d)
Answer
Advise Mo whether or not he should prepare a master budget every year. Justify your answer.
For (max 3)
A master budget can serve the functions of planning (1), controlling and monitoring etc (1).
A master budget would aid his plans to form a limited company (1).
If the business grows and the operations become more complex, the master budget will encourage responsibility
accounting (1).
If his business is growing, budgeting can encourage a more efficient allocation of resources (1).
Budget can motivate employees (1)
Against (max 3)
He needs to hire a specialist, such as a management accountant to prepare the master budget (1).
He needs to have a good information/accounting system which takes time and is costly (1).
His business is still at its infant stage. Cost may exceed benefits in preparing a master budget every year (1).
In January 2025, he has limited resource of manpower to prepare a master budget (1).
Budget may also demotivate employees (1).
Decision supported with a comment (1)
Accept other valid responses.
© Cambridge University Press & Assessment 2024
Page 10 of 13
Marks
7
October/November 2024
www.dynamicpapers.com
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
9706/43
Question
2(a)
Answer
Calculate, to two decimal places, the unit selling price for each product using traditional absorption costing.
Direct materials
Direct labour
Production overheads W1
Product A
$
21.00
56.00
14.00 (1)
91.00
Mark-up 40%
36.40
Selling price
127.40
Marks
5
Product B
$
25.00 }row
80.00 }row (1)
20.00 (1)
125.00
row
50.00 (1)OF
row
175.00 (1)OF
W1
Total direct labour hours (28 000 3.5) + (2 000 5) =108 000
Overhead absorption rate $432 000/108 000 = $4 per labour hour
Product A $4 3.5= $14
Product B $4 5= $20
2(b)
State two advantages and two disadvantages of ABC.
Advantages (max 2)
More accurate cost information (1).
Assist in making better decision such as pricing (1).
Better understand the activities that cause costs (1).
Managers can focus on improving efficiency of the activities that will decrease cost (1).
Identify unprofitable products (1).
Disadvantages (max 2)
Need to consider whether cost of implementing ABC exceeds the benefit (1).
It is only appropriate for a business producing multiple products (1).
It is time consuming because it takes a lot of time to collect and analyse data (1).
It is costly to employ specialist to collect and analyse data (1).
It may be difficult to associate costs to cost drivers (1).
Accept other valid responses.
© Cambridge University Press & Assessment 2024
Page 11 of 13
4
October/November 2024
www.dynamicpapers.com
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
9706/43
Question
2(c)
Answer
Marks
Calculate, to two decimal places, the total cost per unit for each product using ABC.
Direct materials
Direct labour
Production overheads W1
Total unit cost
A
$
21.00
56.00
13.52
90.52
5
B
$
25.00
80.00
26.70 (4) OF row
131.70 (1) OF row
W1
Machine set up $90 000 320 / 400, $90 000 80/400
Inspection $126 000 500/600, $126 000 100/600
Machining $216 000 42 000/45 000, $216 000 3 000/45 000
Production overheads per unit
2(d)(i)
$
72 000
105 000
201 600
378 600
13.52
$
18 000
21 000
14 400
53 400
26.70
row (1)
row (1)
row (1)
row (1) OF
Calculate the percentage change in the mark-up for Product B if ABC is adopted and the unit selling price remains
the same as in (a).
2
Mark-up ($175 OF-$131.70)/$131.70= 32.88% (1)OF
40% - 32.88%= a decrease of 7.12% (1)OF
2(d)(ii)
Explain why this change will happen.
2
The mark-up decreases because of higher total unit cost under ABC while the unit selling price remains unchanged (1)OF
Production overhead per unit under ABC of $26.70 is higher than that under absorption costing of $20 (1)OF
© Cambridge University Press & Assessment 2024
Page 12 of 13
October/November 2024
www.dynamicpapers.com
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
9706/43
Question
2(e)
Answer
Advise the directors whether or not they should set the selling prices in this way. Justify your answer.
Can help assessing the competitiveness in the market (1).
Can know at what selling price the customers are willing to pay (1).
Can monitor the selling price the competitor is able to charge (1).
Can help identifying the performance gap in the operations (1).
May not achieve the business’s targeted mark-up (1).
The benchmarked selling price may not cover the total cost (1).
The selling price is subject to fluctuation (1).
The business is too passive in setting the selling price (1).
Max 6 for comments
Decision supported with a comment (1)
Accept other valid responses.
© Cambridge University Press & Assessment 2024
Page 13 of 13
Marks
7