Accounting (9706) · May/June 2025 · Mark scheme 42

Cambridge Accounting (9706) mark scheme for paper 42, May/June 2025 — 9706/42/M/J/25, file 9706_s25_ms_42.pdf.

Advertisement
Loading the paper…
Text of this paper

Cambridge International AS & A Level
ACCOUNTING

9706/42

Paper 4 Cost and Management Accounting

May/June 2025

MARK SCHEME
Maximum Mark: 50

Published

This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of the
examination. It shows the basis on which Examiners were instructed to award marks. It does not indicate the
details of the discussions that took place at an Examiners’ meeting before marking began, which would have
considered the acceptability of alternative answers.
Mark schemes should be read in conjunction with the question paper and the Principal Examiner Report for
Teachers.
Cambridge International will not enter into discussions about these mark schemes.
Cambridge International is publishing the mark schemes for the May/June 2025 series for most
Cambridge IGCSE, Cambridge International A and AS Level components, and some Cambridge O Level
components.

This document consists of 15 printed pages.
© Cambridge University Press & Assessment 2025

[Turn over

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Generic Marking Principles

May/June 2025

These general marking principles must be applied by all examiners when marking candidate answers. They should be applied alongside the
specific content of the mark scheme or generic level descriptions for a question. Each question paper and mark scheme will also comply with these
marking principles.
GENERIC MARKING PRINCIPLE 1:
Marks must be awarded in line with:
•
•
•

the specific content of the mark scheme or the generic level descriptors for the question
the specific skills defined in the mark scheme or in the generic level descriptors for the question
the standard of response required by a candidate as exemplified by the standardisation scripts.

GENERIC MARKING PRINCIPLE 2:
Marks awarded are always whole marks (not half marks, or other fractions).
GENERIC MARKING PRINCIPLE 3:
Marks must be awarded positively:
•
•
•
•
•

marks are awarded for correct/valid answers, as defined in the mark scheme. However, credit is given for valid answers which go beyond
the scope of the syllabus and mark scheme, referring to your Team Leader as appropriate
marks are awarded when candidates clearly demonstrate what they know and can do
marks are not deducted for errors
marks are not deducted for omissions
answers should only be judged on the quality of spelling, punctuation and grammar when these features are specifically assessed by the
question as indicated by the mark scheme. The meaning, however, should be unambiguous.

GENERIC MARKING PRINCIPLE 4:
Rules must be applied consistently, e.g. in situations where candidates have not followed instructions or in the application of generic level
descriptors.

© Cambridge University Press & Assessment 2025

Page 2 of 15

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

May/June 2025

GENERIC MARKING PRINCIPLE 5:
Marks should be awarded using the full range of marks defined in the mark scheme for the question (however; the use of the full mark range may
be limited according to the quality of the candidate responses seen).
GENERIC MARKING PRINCIPLE 6:
Marks awarded are based solely on the requirements as defined in the mark scheme. Marks should not be awarded with grade thresholds or
grade descriptors in mind.

© Cambridge University Press & Assessment 2025

Page 3 of 15

9706/42

1

Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Social Science-Specific Marking Principles
(for point-based marking)

May/June 2025

Components using point-based marking:
• Point marking is often used to reward knowledge, understanding and application of skills. We give credit where the candidate’s answer
shows relevant knowledge, understanding and application of skills in answering the question. We do not give credit where the answer
shows confusion.
From this it follows that we:
a
b
c
d
e
f
g

2

DO credit answers which are worded differently from the mark scheme if they clearly convey the same meaning (unless the mark
scheme requires a specific term)
DO credit alternative answers/examples which are not written in the mark scheme if they are correct
DO credit answers where candidates give more than one correct answer in one prompt/numbered/scaffolded space where extended
writing is required rather than list-type answers. For example, questions that require n reasons (e.g. State two reasons …).
DO NOT credit answers simply for using a ‘key term’ unless that is all that is required. (Check for evidence it is understood and not used
wrongly.)
DO NOT credit answers which are obviously self-contradicting or trying to cover all possibilities
DO NOT give further credit for what is effectively repetition of a correct point already credited unless the language itself is being tested.
This applies equally to ‘mirror statements’ (i.e. polluted/not polluted).
DO NOT require spellings to be correct, unless this is part of the test. However spellings of syllabus terms must allow for clear and
unambiguous separation from other syllabus terms with which they may be confused (e.g. Corrasion/Corrosion)

Presentation of mark scheme:
• Slashes (/) or the word ‘or’ separate alternative ways of making the same point.
• Semi colons (;) bullet points (•) or figures in brackets (1) separate different points.
• Content in the answer column in brackets is for examiner information/context to clarify the marking but is not required to earn the mark
(except Accounting syllabuses where they indicate negative numbers).

© Cambridge University Press & Assessment 2025

Page 4 of 15

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

May/June 2025

3

Calculation questions:
• The mark scheme will show the steps in the most likely correct method(s), the mark for each step, the correct answer(s) and the mark
for each answer
• If working/explanation is considered essential for full credit, this will be indicated in the question paper and in the mark scheme. In all
other instances, the correct answer to a calculation should be given full credit, even if no supporting working is shown.
• Where the candidate uses a valid method which is not covered by the mark scheme, award equivalent marks for reaching equivalent
stages.
• Where an answer makes use of a candidate’s own incorrect figure from previous working, the ‘own figure rule’ applies: full marks will be
given if a correct and complete method is used. Further guidance will be included in the mark scheme where necessary and any
exceptions to this general principle will be noted.

4

Annotation:
• For point marking, ticks can be used to indicate correct answers and crosses can be used to indicate wrong answers. There is no direct
relationship between ticks and marks. Ticks have no defined meaning for levels of response marking.
• For levels of response marking, the level awarded should be annotated on the script.
• Other annotations will be used by examiners as agreed during standardisation, and the meaning will be understood by all examiners
who marked that paper.

© Cambridge University Press & Assessment 2025

Page 5 of 15

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

May/June 2025

Annotations guidance for centres
Examiners use a system of annotations as a shorthand for communicating their marking decisions to one another. Examiners are trained during the
standardisation process on how and when to use annotations. The purpose of annotations is to inform the standardisation and monitoring
processes and guide the supervising examiners when they are checking the work of examiners within their team. The meaning of annotations and
how they are used is specific to each component and is understood by all examiners who mark the component.
We publish annotations in our mark schemes to help centres understand the annotations they may see on copies of scripts. Note that there may
not be a direct correlation between the number of annotations on a script and the mark awarded. Similarly, the use of an annotation may not be an
indication of the quality of the response.
The annotations listed below were available to examiners marking this component in this series.
Annotations
Annotation

Meaning
Correct and relevant point made in answering the question.
Incorrect point or error made.
Two statements are linked.
Repeat
An extraneous figure
No working shown
Addition error (Arithmetic error)
Required item 1
Required item 2
Own figure

© Cambridge University Press & Assessment 2025

Page 6 of 15

9706/42
Annotation

Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Meaning
Evaluation
Not answered question
Benefit of the doubt given.
Noted but no credit given

Highlight

Highlight

Off page
Comment

Off page comment

© Cambridge University Press & Assessment 2025

Page 7 of 15

May/June 2025

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

May/June 2025

Abbreviations and guidance
The following abbreviations may be used in the mark scheme:
OF = own figure. The answer will be marked correct if a candidate has correctly used their own figure from a previous part or calculation.
W = working. The working for a figure is given below. Where the figure has more than one mark associated with it, the working will show where
individual marks are to be awarded.
CF = correct figure. The figure has to be correct i.e. no extraneous items have been included in the calculation
Extraneous item = an item that should not have been included in a calculation, including indirect expenses such as salaries in calculation of
gross profit when there is one OF mark for gross profit’
Curly brackets, }, are used to show where one mark is given for more than one figure. If the figures are not adjacent, each is marked with a
curly bracket and a symbol e.g. }*
row = all figures in the row must be correct for this mark to be awarded
Marks for figures are dependent on correct sign/direction
Accept other valid responses. This statement indicates that marks may be awarded for answers that are not listed in the mark scheme but are
equally valid.

© Cambridge University Press & Assessment 2025

Page 8 of 15

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
1(a)

Answer
Calculate the net cash flow for each year 1 to 4 for Option 1.
Year

1(b)(i)

Marks
4

$

1

4 000  (80 – 52 – 3) – 60 000

40 000

(1)

2

5 000  (80 – 52 – 3) – 60 000

65 000

(1)

3

5 000  (82 – 52 – 3) – 60 000

75 000

(1)

4

6 000  (86 – 52 – 3) – 64 000

122 000

(1)

Calculate the net present value (NPV) for:

4

Option 1
Year

May/June 2025

Net cash flow
$

Discount factor

Present value
$

0

(224 000)

1

40 000

0.909

36 360 }

2

65 000

0.826

53 690 }(1)OF

3

75 000

0.751

56 325 }*

4

122 000

0.683

83 326 }*(1)OF

Net present value

© Cambridge University Press & Assessment 2025

(224 000) (1)

5 701 (1)OF

Page 9 of 15

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
1(b)(ii)

Answer
Calculate the net present value (NPV) for:

0

Net cash flow
$

Discount
factor

(950)

Present
value
$
(950)

(1)

1–3

1 500

2.486

3 729.0

(1)

4

1 800

0.683

1 229.4

(1)

4 008.4

(1)OF

Net present value
Or
Year

0

Net cash flow
$

Discount
factor

(950)

1.000

Present
value
$
(950)

(1)

1

1 500

0.909

1 363.5 }

2

1 500

0.826

1 239.0 } (1)

3

1 500

0.751

1 126.5 }*

4

1 800

0.683

1 229.4 }* (1)

Net present value

© Cambridge University Press & Assessment 2025

Marks
4

Option 2
Year

May/June 2025

4 008.4 (1)OF

Page 10 of 15

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
1(c)

May/June 2025

Answer
State what is meant by the payback period.

Marks
1

The time taken to recover the cost of an investment (1)
Accept other valid responses.
1(d)

Discuss whether Babar should take the payback period of the options into account when making a decision.
Calculations are not required.

4

Payback considers cash flows (1) and not profit (1). The shorter the payback period the less risky the option (1) as later
cash flows are more uncertain than earlier ones (1). The more risk averse Babar is, the more he will look for an option
which pays back quickly (1).
Payback does not consider the cash flows which arise after the end of the payback period / the whole life of the project (1)
and does not consider the time value of money (1).
Max 4
Accept other valid responses.
1(e)

Advise Babar which option he should implement. Justify your answer.
Option 1 has the higher NPV (1).
There is a higher initial outlay for option 1 (1) which may require financing (1).
The payback period for option 1 is longer (1) so it is a riskier investment (1).
Organising option 1 will involve considerably more work and stress than option 2 (1).
Option 1 will provide employment opportunities for local people (1).
If option 1 goes well Babar could bottle his own juice and sell it himself (1).
For option 2 the tenant might stay longer than four years with no additional outlay (1) whereas continuation of option 1
would require the purchase of further machinery which will require funding (1).
Max 6 for comments
Decision supported with a comment (1)
Accept other valid responses

© Cambridge University Press & Assessment 2025

Page 11 of 15

7

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
1(f)

Answer
Name one other method of investment appraisal which Babar could use.
Accounting rate of return / (ARR) (1)
OR Internal rate of return / (IRR) (1)

© Cambridge University Press & Assessment 2025

Page 12 of 15

May/June 2025
Marks
1

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

May/June 2025

Question

Answer

Marks

2(a)

Complete the following table to reconcile the standard profit for April 2025 with the actual profit using the required
variances.
Enter each variance in either the favourable or adverse column as appropriate.
$
Favourable

$

$

Adverse

Standard profit

255 200 (1)

Sales price variance

11 000(92.5 – 85)

Material price variance

46 200(4.6 – 2.5)

Material usage variance

4.6(44 000 – 46 200)

Labour rate variance

39 600(11.2 – 11)

82 500

(2)

97 020

(2)
10 120

(2)

7 920

(2)

Labour efficiency variance 11(33 000 – 39 600)

72 600

(2)

Total fixed overhead variance
(17.9  11 000) – 21 2000

15 100

(2)

97 020

Actual profit

188 240

(91 220)

163 980 (1)

Note – marks for variance are (1) for amount and (1) for correct direction ( column -favourable or adverse)

© Cambridge University Press & Assessment 2025

Page 13 of 15

14

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
2(b)

May/June 2025

Answer
Discuss whether variance analysis is useful in this situation.
Shows the differences between budget and actual (1) caused by this change in materials (1).
It shows how it affects other variances (1), for example workers being less efficient as they are not experienced with the
materials, wastage etc (1).
Indicates where changes may be made to improve outcomes / take remedial action or suitable example such as training
(1).
Helps to plan more realistic and attainable goals (1).
The standards being used are unlikely to be realistic (1).
Not useful in assessing performance when changes are beyond the control of the business (1).
Accept other valid answers
Max 4
Accept other valid responses

© Cambridge University Press & Assessment 2025

Page 14 of 15

Marks
4

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
2(c)

May/June 2025

Answer
Advise the directors whether or not they should continue with the change in material. Justify your answer and
support it with relevant calculations.
Calculations
Price rise of metal would have reduced profit by 44 000  (7.80 – 4.60) = $140 800 (1) compared to the actual reduction in
profit of $91 220 (1).
Continue (Max 2)
Product is still profitable (1).
Profit is higher than if the business uses metal, given its price rise (1).
Customers have not been let down (1).
Plastic is cheaper than metal (1).
As new type of production becomes established some adverse variances may improve (1).
Business is able to maintain operating at full capacity (1).
Do not continue (Max 2)
The quality may be adversely affected (1).
Sales have decreased / product may become harder to sell in the future (1).
The brand image may be damaged (1).
There may be environmental concerns (1).
May require a shorter warranty period (1).
Decision supported with a comment (1)
Accept other valid responses

© Cambridge University Press & Assessment 2025

Page 15 of 15

Marks
7