Accounting (9706) · May/June 2023 · Mark scheme 42

Cambridge Accounting (9706) mark scheme for paper 42, May/June 2023 — 9706/42/M/J/23, file 9706_s23_ms_42.pdf.

Advertisement
Loading the paper…
Text of this paper

www.dynamicpapers.com

Cambridge International AS & A Level
ACCOUNTING

9706/42

Paper 4 Cost and Management Accounting

May/June 2023

MARK SCHEME
Maximum Mark: 50

Published

This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of the
examination. It shows the basis on which Examiners were instructed to award marks. It does not indicate the
details of the discussions that took place at an Examiners’ meeting before marking began, which would have
considered the acceptability of alternative answers.
Mark schemes should be read in conjunction with the question paper and the Principal Examiner Report for
Teachers.
Cambridge International will not enter into discussions about these mark schemes.
Cambridge International is publishing the mark schemes for the May/June 2023 series for most
Cambridge IGCSE, Cambridge International A and AS Level and Cambridge Pre-U components, and some
Cambridge O Level components.

This document consists of 15 printed pages.
© UCLES 2023

[Turn over

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Generic Marking Principles

May/June 2023
www.dynamicpapers.com

These general marking principles must be applied by all examiners when marking candidate answers. They should be applied alongside the
specific content of the mark scheme or generic level descriptors for a question. Each question paper and mark scheme will also comply with these
marking principles.
GENERIC MARKING PRINCIPLE 1:
Marks must be awarded in line with:


the specific content of the mark scheme or the generic level descriptors for the question
the specific skills defined in the mark scheme or in the generic level descriptors for the question
the standard of response required by a candidate as exemplified by the standardisation scripts.

GENERIC MARKING PRINCIPLE 2:
Marks awarded are always whole marks (not half marks, or other fractions).
GENERIC MARKING PRINCIPLE 3:
Marks must be awarded positively:




marks are awarded for correct/valid answers, as defined in the mark scheme. However, credit is given for valid answers which go beyond
the scope of the syllabus and mark scheme, referring to your Team Leader as appropriate
marks are awarded when candidates clearly demonstrate what they know and can do
marks are not deducted for errors
marks are not deducted for omissions
answers should only be judged on the quality of spelling, punctuation and grammar when these features are specifically assessed by the
question as indicated by the mark scheme. The meaning, however, should be unambiguous.

GENERIC MARKING PRINCIPLE 4:
Rules must be applied consistently, e.g. in situations where candidates have not followed instructions or in the application of generic level
descriptors.

© UCLES 2023

Page 2 of 15

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

May/June 2023
www.dynamicpapers.com

GENERIC MARKING PRINCIPLE 5:
Marks should be awarded using the full range of marks defined in the mark scheme for the question (however; the use of the full mark range may
be limited according to the quality of the candidate responses seen).
GENERIC MARKING PRINCIPLE 6:
Marks awarded are based solely on the requirements as defined in the mark scheme. Marks should not be awarded with grade thresholds or
grade descriptors in mind.

© UCLES 2023

Page 3 of 15

9706/42

1

Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Social Science-Specific Marking Principles
(for point-based marking)

May/June 2023
www.dynamicpapers.com

Components using point-based marking:
 Point marking is often used to reward knowledge, understanding and application of skills. We give credit where the candidate’s answer
shows relevant knowledge, understanding and application of skills in answering the question. We do not give credit where the answer
shows confusion.
From this it follows that we:
a
b
c
d
e
f
g

2

DO credit answers which are worded differently from the mark scheme if they clearly convey the same meaning (unless the mark
scheme requires a specific term)
DO credit alternative answers/examples which are not written in the mark scheme if they are correct
DO credit answers where candidates give more than one correct answer in one prompt/numbered/scaffolded space where extended
writing is required rather than list-type answers. For example, questions that require n reasons (e.g. State two reasons …).
DO NOT credit answers simply for using a ‘key term’ unless that is all that is required. (Check for evidence it is understood and not used
wrongly.)
DO NOT credit answers which are obviously self-contradicting or trying to cover all possibilities
DO NOT give further credit for what is effectively repetition of a correct point already credited unless the language itself is being tested.
This applies equally to ‘mirror statements’ (i.e. polluted/not polluted).
DO NOT require spellings to be correct, unless this is part of the test. However spellings of syllabus terms must allow for clear and
unambiguous separation from other syllabus terms with which they may be confused (e.g. Corrasion/Corrosion)

Presentation of mark scheme:
 Slashes (/) or the word ‘or’ separate alternative ways of making the same point.
 Semi colons (;) bullet points (•) or figures in brackets (1) separate different points.
 Content in the answer column in brackets is for examiner information/context to clarify the marking but is not required to earn the mark
(except Accounting syllabuses where they indicate negative numbers).

© UCLES 2023

Page 4 of 15

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

May/June 2023
www.dynamicpapers.com

3

Calculation questions:
 The mark scheme will show the steps in the most likely correct method(s), the mark for each step, the correct answer(s) and the mark
for each answer
 If working/explanation is considered essential for full credit, this will be indicated in the question paper and in the mark scheme. In all
other instances, the correct answer to a calculation should be given full credit, even if no supporting working is shown.
 Where the candidate uses a valid method which is not covered by the mark scheme, award equivalent marks for reaching equivalent
stages.
 Where an answer makes use of a candidate’s own incorrect figure from previous working, the ‘own figure rule’ applies: full marks will be
given if a correct and complete method is used. Further guidance will be included in the mark scheme where necessary and any
exceptions to this general principle will be noted.

4

Annotation:
 For point marking, ticks can be used to indicate correct answers and crosses can be used to indicate wrong answers. There is no direct
relationship between ticks and marks. Ticks have no defined meaning for levels of response marking.
 For levels of response marking, the level awarded should be annotated on the script.
 Other annotations will be used by examiners as agreed during standardisation, and the meaning will be understood by all examiners
who marked that paper.

© UCLES 2023

Page 5 of 15

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Annotations
The following annotations are used in marking this paper and should be used by examiners.
Annotation

Use or meaning

Correct and relevant point made in answering the question.

×

Incorrect point or error made.

LNK

Two statements are linked.

REP

Repeat

A

An extraneous figure

N0

No working shown

AE

Attempts evaluation

R1

Required item 1

R2

Required item 2

OF

Own figure

EVAL

Evaluation

NAQ

Not answered question

BOD

Benefit of the doubt given.

SEEN

Noted but no credit given

Highlight

Highlight

Off page
Comment

Off page comment

© UCLES 2023

Page 6 of 15

May/June 2023
www.dynamicpapers.com

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

May/June 2023
www.dynamicpapers.com

Abbreviations and guidance
The following abbreviations may be used in the mark scheme:
OF = own figure. The answer will be marked correct if a candidate has correctly used their own figure from a previous part or calculation.
W = working. The working for a figure is given below. Where the figure has more than one mark associated with it, the working will show where
individual marks are to be awarded.
CF = correct figure. The figure has to be correct i.e. no extraneous items have been included in the calculation
Extraneous item = an item that should not have been included in a calculation, including indirect expenses such as salaries in calculation of
gross profit when there is one OF mark for gross profit’
Curly brackets, }, are used to show where one mark is given for more than one figure. If the figures are not adjacent, each is marked with a curly
bracket and a symbol e.g. }*
row = all figures in the row must be correct for this mark to be awarded
Marks for figures are dependent on correct sign/direction
Accept other valid responses. This statement indicates that marks may be awarded for answers that are not listed in the mark scheme but are
equally
valid.

© UCLES 2023

Page 7 of 15

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
1(a)(i)

Answer
Calculate:

May/June 2023
www.dynamicpapers.com
Marks
4

the net cash flow for each year and in total for the project.
$
Year 0 – cost

(400 000) (1)

Year 1 – grant

142 000

Year 1 – fees

64 000

206 000

Year 2 – fees

80 000

Year 3 – fees

96 000

Year 4 – fees

1(a)(ii)

$

(1)

112 000 (1)
94 000 (1)OF
3

Calculate:
the accounting rate of return (ARR) to two decimal places.

23 500 (1of)
 100 = 11.75% (1)OF
200 000 (1)

© UCLES 2023

Page 8 of 15

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
1(b)

Answer

Cash flow

4
Discount
factor

$

© UCLES 2023

Marks

Calculate the net present value (NPV) of the project.
Year

May/June 2023
www.dynamicpapers.com

Discounted
cash flow
$

0

(400 000)

(400 000) (1)

1

206 000

0.909

2

80 000

0.826

66 080 (1) OF

3

96 000

0.751

72 096

4

112 000

0.683

76 496

(1) OF

NPV

1 926

(1) OF

Page 9 of 15

187 254

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
1(c)

Answer

Marks

Calculate the change in NPV which would arise if the extension was also built. Your answer should indicate
whether the change is an increase or a decrease.
Year

Cash flow
$

0

(420 000)

1

206 000

Discount factor

Discounted cash flow
$
(420 000)

0.909

187 254

2

84 000 (1)

0.826

69 384

3

104 000 (1)

0.751

78 104

4

124 000 (1)

0.683

84 692

NPV
Change in NPV = 1926 – (– 566) = 2492 (1) OF decrease (1) OF

© UCLES 2023

May/June 2023
www.dynamicpapers.com

Page 10 of 15

(566)

(1)

(1) OF

7

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
1(c)

Answer

Marks

OR
Year

© UCLES 2023

May/June 2023
www.dynamicpapers.com

Cash flow
$

Discount factor

0

(20 000)

1

0

Discounted cash flow
$
(20 000)

0.909

0

(1)

2

4 000 (1)

0.826

3 304

3

8 000 (1)

0.751

6 008

4

12 000 (1)

0.683

8 196

(1) OF

Decrease (1) OF
increase in NPV

(2 492)

(1) OF

Page 11 of 15

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
1(d)

May/June 2023
www.dynamicpapers.com

Answer
Advise Hiram whether or not he should agree to build the sea wall and the extension. Justify your answer.
Max 6 marks for comments
1 mark for decision supported by a comment.
Building the sea wall alone has a positive NPV (1). But when the extension is added to the project the total NPV becomes
negative (1).
The ARR of the sea wall alone is greater than Hiram’s cost of capital (1). But when the extension is added the ARR will
change (1).
There is considerable risk involved in this project (1) as the figures are based on estimates (1). The existing residents may
change their minds and not pay their annual fees (1). The new houses may not be built or their owners may not want to
pay an annual fee (1).
Hiram may have a desire to help the community such that he would take on a project at a loss (1). He may have been
chosen by the village because he already has links with it/has family there/lives there himself (1).
Accept other valid responses.

© UCLES 2023

Page 12 of 15

Marks
7

9706/42
Question
2(a)

Answer

Marks

Complete the following statement to reconcile the flexible budgeted profit with the actual profit for April 2023.
$

$

Budgeted profit
Variance

Materials price
(18–15)  3150

Favourable

Adverse
18 750

(2)
2 700
(2)
3 825
(2)

Labour efficiency
(3–3.4)  9000
Fixed overhead
expenditure
(48 000–46 200)
Fixed overhead volume
(48 000–36 000)

(2)

9 450

Materials usage
(4–4.2)  13500
Labour rate
(12–10.5)  2550

$
25 500

Sales price
(190–165)  750

3 600
(2)
1 800
(2)

12 000

15 075

37 050

Actual profit

(2)
(21 975)
3 525 (1)

Marks for variances – (1) for amount and (1) for favourable / adverse

© UCLES 2023

May/June 2023
www.dynamicpapers.com

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Page 13 of 15

15

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
2(b)

May/June 2023
www.dynamicpapers.com

Answer
Explain one possible reason for the materials price variance.

Marks
2

The market price for the material had fallen (1) because there is lower demand for non recyclable material (1).
NOT lower quality material
Accept other valid responses.
2(c)

Explain one possible reason for the labour efficiency variance.
More hours have been worked (1) because the hourly rate had been cut / the workers were demotivated (1).
NOT less experienced workers had been hired.
Accept other valid responses.

© UCLES 2023

Page 14 of 15

2

9706/42

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

May/June 2023
www.dynamicpapers.com

Question

Answer

2(d)

Advise the directors whether or not they should replace the existing material used in production with a recyclable
material. The recyclable material would cost $24 per kilo. Justify your answer and support it with relevant
calculations.
Max 2 marks for calculations
Max 3 marks for comments
1 mark for decision supported by a comment.
With the cost of the new material the profit from the flexible budget statement would be only $7500/fall by $18 000 (750  4
 6) (1) and the actual profit would be a loss of $24 825/fall by $28 350 (750  4.2  9) (1).
The new material is more expensive (1).
If the company does not make the change it may struggle to continue production / make sales (1). If the product became
more popular again the selling price / sales could increase (1).
Costs of advertising would have to increase to ensure that customers knew of the change (1).
There may be factors other than the recyclability of the material affecting customer behaviour (1).
Consideration would have to be paid to the selling price of competitors’ products (1).
Accept other valid responses.

© UCLES 2023

Page 15 of 15

Marks
6

Advertisement