Text of this paper

www.dynamicpapers.com

Cambridge International AS & A Level
COMPUTER SCIENCE

9618/12

Paper 1 Theory Fundamentals

October/November 2024

MARK SCHEME
Maximum Mark: 75

Published

This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of the
examination. It shows the basis on which Examiners were instructed to award marks. It does not indicate the
details of the discussions that took place at an Examiners’ meeting before marking began, which would have
considered the acceptability of alternative answers.
Mark schemes should be read in conjunction with the question paper and the Principal Examiner Report for
Teachers.
Cambridge International will not enter into discussions about these mark schemes.
Cambridge International is publishing the mark schemes for the October/November 2024 series for most
Cambridge IGCSE, Cambridge International A and AS Level components, and some Cambridge O Level
components.

This document consists of 10 printed pages.
© Cambridge University Press & Assessment 2024

[Turn over

9618/12

October/November
www.dynamicpapers.com

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

2024

Generic Marking Principles
These general marking principles must be applied by all examiners when marking candidate answers.
They should be applied alongside the specific content of the mark scheme or generic level
descriptions for a question. Each question paper and mark scheme will also comply with these
marking principles.
GENERIC MARKING PRINCIPLE 1:
Marks must be awarded in line with:
•
•
•

the specific content of the mark scheme or the generic level descriptors for the question
the specific skills defined in the mark scheme or in the generic level descriptors for the question
the standard of response required by a candidate as exemplified by the standardisation scripts.

GENERIC MARKING PRINCIPLE 2:
Marks awarded are always whole marks (not half marks, or other fractions).
GENERIC MARKING PRINCIPLE 3:
Marks must be awarded positively:
•
•
•
•
•

marks are awarded for correct/valid answers, as defined in the mark scheme. However, credit
is given for valid answers which go beyond the scope of the syllabus and mark scheme,
referring to your Team Leader as appropriate
marks are awarded when candidates clearly demonstrate what they know and can do
marks are not deducted for errors
marks are not deducted for omissions
answers should only be judged on the quality of spelling, punctuation and grammar when these
features are specifically assessed by the question as indicated by the mark scheme. The
meaning, however, should be unambiguous.

GENERIC MARKING PRINCIPLE 4:
Rules must be applied consistently, e.g. in situations where candidates have not followed
instructions or in the application of generic level descriptors.
GENERIC MARKING PRINCIPLE 5:
Marks should be awarded using the full range of marks defined in the mark scheme for the question
(however; the use of the full mark range may be limited according to the quality of the candidate
responses seen).
GENERIC MARKING PRINCIPLE 6:
Marks awarded are based solely on the requirements as defined in the mark scheme. Marks should
not be awarded with grade thresholds or grade descriptors in mind.

© Cambridge University Press & Assessment 2024

Page 2 of 10

October/November
www.dynamicpapers.com

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

9618/12

Question
1(a)

1(b)

Answer
1 mark for each shaded part.

2(a)

B

C

X

0

0

0

1

0

0

1

1

0

1

0

1

0

1

1

1

1

0

0

1

1

0

1

0

1

1

0

1

1

1

1

1

1 mark for (P XOR Q) and (Q OR NOT R)
1 mark for second XOR gate and final NAND gate with appropriate inputs

Answer
1 mark for each bullet point (max 3)
e.g.
• It is difficult to change / update the firmware by the user
• Errors cannot be fixed easily // Troubleshooting / fault-finding / repairing is
a specialist task / expensive
• Functionality cannot be changed/extended easily // Cannot be easily
adapted for another task
• Faulty / outdated devices are often thrown away rather than repaired
• … leading to e-waste

© Cambridge University Press & Assessment 2024

Marks
2

A

Question

2024

Page 3 of 10

2

Marks
3

October/November
www.dynamicpapers.com

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

9618/12

Question
2(b)

Answer

•
2(c)

1

DRAM is less expensive to manufacture/purchase than SRAM in the
embedded system
DRAM has a higher bit density per chip // more data can be stored
per chip

1 mark for each bullet point (max 2)
•
•
•

Answer

Marks

1 mark for each correct purpose

4

Register

Purpose

Program Counter
(PC)

Stores the address of the next instruction to be
fetched/executed

Memory Address
Register (MAR)

Stores the address of the memory location
where data will be read from/written to

Memory Data
Register (MDR)
Index Register (IX)
3(b)

2

EPROM uses ultraviolet light to erase data whilst EEPROM uses an
electrical signal to do this
EPROM has to be removed from the circuit board when changing the
data whilst EEPROM remains in the circuit when the data is changed
EPROM erases all the data, EEPROM can erase parts of the data

Question
3(a)

Marks

1 mark from:
•

2024

Stores the data read from the address in the
MAR // stores the data to be written to the
address in the MAR
Stores a number that will be added to the
operand, to form the address of the data

1 mark for each bullet point (max 4)
e.g.
• HDMI has faster transfer rates than VGA
• … needed due to high resolution / large number of pixels of monitor //
HDMI supports the high resolution of the monitor
• HDMI supports video and audio transfer between computer and
monitor speakers
• … so no separate sound cable is needed unlike VGA
• HDMI is digital interface therefore no data is lost in transfer to analogue
and back
• HDMI is less prone to error/crosstalk/external interference

© Cambridge University Press & Assessment 2024

Page 4 of 10

4

October/November
www.dynamicpapers.com

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

9618/12

Question
3(c)

Answer
1 mark for each bullet point (max 4)

2024

Marks
4

e.g.
• It manages the scheduling of processes // Decides which process is to be
run next
• Allows multi-tasking/multi-processing
• Ensures fair access
• Handles interrupts
• Manages / allocates which resources the processes require
• Facilitates the sharing and exchange of data between processes
• Prevents interference between processes // conflict resolution

Question
4(a)

Answer
1 mark for each bullet point (max 4)

Marks
4

e.g.

4(b)

•
•
•

Single stepping
Run the program one line at a time
… and check the variable contents / program flow // show the effect of
each line of code

•
•
•

Set breakpoints
… run the code up to a set line
... and then check the status

•
•

Variable/report watch window
… view how the data changes as the program is running

1 mark for each bullet point (max 3)

3

e.g.
•
•
•
•
•
4(c)

Subroutines can be shared / reused
… between team members who are working independently
… without having to rewrite/re-test them which saves the
programmers’ time
A program library provides continuity between programs/programmers
Individual programmers can contribute their specialisms to the library //
Individual programmers can use the specialisms of others

1 mark for the security method. 2 marks for explanation
Security method:
Encryption
Explanation
• File contents are converted to cipher text
• If intercepted the data cannot be understood without the decryption key

© Cambridge University Press & Assessment 2024

Page 5 of 10

3

October/November
www.dynamicpapers.com

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

9618/12

Question
5(a)

Answer
1 mark for each bullet point max 2 for public max 2 for colleagues

2024

Marks
4

e.g.
Colleagues:
The programmer should:
• Treat colleagues fairly and avoid acts of discrimination
• Be prepared to accept / offer critique
• … so that technical work can be improved
• Credit the contributions of colleagues
• … so that they feel valued / respected
• Help / train colleagues
etc.
e.g.
The public:
The programmer should:
• Maintain the health, safety and welfare of the public
• … so as not to endanger anyone
• Be honest / realistic in making claims about the software
• … so that public trust is maintained
• Maintain the security of the public's data
etc.
5(b)(i)

Type of software licence
1 mark for
•

3

Open Source Initiative // Free Software Foundation

Reason for choice:
1 mark for each bullet point (max 2)
•
•
•
5(b)(ii)

Allows program source code to be examined
… so that the business can adapt/modify the program to meet their needs
Allows the programmer to earn money for the software and updates

1 mark for each bullet point (max 2)
•
•
•

To identify themselves as the owner/author // To gain formal recognition
of ownership
To allow for legal consequences if anyone steals/copies it
To restrict competition

© Cambridge University Press & Assessment 2024

Page 6 of 10

2

October/November
www.dynamicpapers.com

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

9618/12

Question
6(a)

Answer
1 mark each to max 3

2024

Marks
3

e.g.
• There is reduced data redundancy // less repeated data
• … because each item of data is only stored once
• Data consistency is maintained // Data integrity is improved
• … changes in one table will automatically update in another
• ... linked data cannot be entered differently in two tables
• Program-data independence is ensured
• … changes to the data do not require programs to be re-written // queries
are not dependent on the structure of the data
• Complex queries are easier to run
• Different views can be provided
• …. so users can only see specific aspects of the database
• Multiple concurrent access is possible
• ... through record locking
6(b)(i)

6(b)(ii)

1 mark each to max 6

6

•
•

CUSTOMER to JOB is 1 to many

•
•

EMPLOYEE to LOGIN_DATA is 1 to 1
… implemented by Primary Key in EMPLOYEE is Foreign Key in
LOGIN_DATA

•
•

JOB to JOB_EMPLOYEE is 1 to many
… implemented by Primary Key in JOB is Foreign Key in
JOB_EMPLOYEE

•
•

EMPLOYEE to JOB_EMPLOYEE is 1 to many
… implemented by Primary Key in EMPLOYEE is Foreign Key in
JOB_EMPLOYEE

… implemented by Primary Key in CUSTOMER is Foreign Key in JOB

1 mark each
•
•
•

3

Select SUM of Amount
From the correct table and one correct condition
Remaining correct condition

Example:

SELECT SUM(Amount)
FROM INVOICE
WHERE Paid = "Y"
AND DateSent >= #01/01/2023# AND DateSent <=
#31/12/2023#

© Cambridge University Press & Assessment 2024

Page 7 of 10

9618/12

October/November
www.dynamicpapers.com

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

Question
7(a)(i)

Answer
1 mark for each correct definition

2024

Marks
2

Colour depth:
• the number of bits used to represent a colour // the number of colours that
can be represented in an image
File header:
• stores data about the image file / metadata
7(a)(ii)

1 mark for each correct explanation

2

Image quality:
• Decreasing resolution means details within the image are lost because
there are fewer pixels // Increasing resolution means the image is more
detailed because there are more pixels
File size:
• Decreasing the resolution will decrease the file size because there are
fewer pixels therefore less data // Increasing the resolution will increase
the file size because there are more pixels therefore more data
7(a)(iii)

1 mark for correct method

1

For example:
• Run-Length Encoding
7(b)

1 mark for each correct definition
Property:
• an attribute of a drawing object // data about a shape // defines one
aspect of the appearance of a drawing object
Drawing list:
• all the drawing objects/shapes in an image // stores the
commands/descriptions / mathematical equations required to draw
each object

© Cambridge University Press & Assessment 2024

Page 8 of 10

2

October/November
www.dynamicpapers.com

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

9618/12

Question
8(a)

Answer

8(b)(i)

5

ACC content

IX content

1

LDM #19
DEC ACC

18

20

2

LDD 23
ADD 19

40

20

3

LDI 25
INC ACC

5

20

4

LDR #21
LDX 2

15

21

1 mark each correct content of ACC
Instructions

8(b)(ii)

Marks

1 mark for each correct content of the ACC (4)
1 mark for correct IX column
Instructions

3
ACC content

1

LSL #2

0110 1000

2

ADD #5
AND #30

0001 1110

3

OR B11110010
INC ACC

1111 1011

1 mark each to max 2 for explanation
•
•
•
•

An odd binary number will have a 1 in the Least Significant Bit (LSB)
A bit manipulation operation is required to access/mask only the LSB and
clear all the others
Compare the result of the masking with denary 1
… the result of the comparison will be true if the number is odd

1 mark for correct instruction
•

AND B00000001 // AND #1 // AND &01

© Cambridge University Press & Assessment 2024

2024

Page 9 of 10

3

October/November
www.dynamicpapers.com

Cambridge International AS & A Level – Mark Scheme
PUBLISHED

9618/12

Question
9(a)

9(b)

Answer
1 mark for sensor and its use in this system
•
•

Infra-red sensor
Measure / check the height of the vehicle

•
•

Pressure sensor
Measure / check the weight of the vehicle

1 mark for each bullet point (max 2) for a correct justification
No marks for the identification of the system
Monitoring system
• Because there is no use of feedback // the warning sign is only
an indicator
• ... the output of the turning on of the sign does not affect the input of data
from the sensors
• The system does not have any actuators

© Cambridge University Press & Assessment 2024

Page 10 of 10

2024

Marks
2

2