Computer Science (9618) · May/June 2025 · Mark scheme 23
Cambridge Computer Science (9618) mark scheme for paper 23, May/June 2025 — 9618/23/M/J/25, file 9618_s25_ms_23.pdf.
Text of this paper
Cambridge International AS & A Level
COMPUTER SCIENCE
9618/23
Paper 2 Fundamental Problem-solving and Programming Skills
May/June 2025
MARK SCHEME
Maximum Mark: 75
Published
This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of the
examination. It shows the basis on which Examiners were instructed to award marks. It does not indicate the
details of the discussions that took place at an Examiners’ meeting before marking began, which would have
considered the acceptability of alternative answers.
Mark schemes should be read in conjunction with the question paper and the Principal Examiner Report for
Teachers.
Cambridge International will not enter into discussions about these mark schemes.
Cambridge International is publishing the mark schemes for the May/June 2025 series for most
Cambridge IGCSE, Cambridge International A and AS Level components, and some Cambridge O Level
components.
This document consists of 14 printed pages.
© Cambridge University Press & Assessment 2025
[Turn over
9618/23
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
May/June 2025
Generic Marking Principles
These general marking principles must be applied by all examiners when marking candidate answers.
They should be applied alongside the specific content of the mark scheme or generic level
descriptions for a question. Each question paper and mark scheme will also comply with these
marking principles.
GENERIC MARKING PRINCIPLE 1:
Marks must be awarded in line with:
•
•
•
the specific content of the mark scheme or the generic level descriptors for the question
the specific skills defined in the mark scheme or in the generic level descriptors for the question
the standard of response required by a candidate as exemplified by the standardisation scripts.
GENERIC MARKING PRINCIPLE 2:
Marks awarded are always whole marks (not half marks, or other fractions).
GENERIC MARKING PRINCIPLE 3:
Marks must be awarded positively:
•
•
•
•
•
marks are awarded for correct/valid answers, as defined in the mark scheme. However, credit
is given for valid answers which go beyond the scope of the syllabus and mark scheme,
referring to your Team Leader as appropriate
marks are awarded when candidates clearly demonstrate what they know and can do
marks are not deducted for errors
marks are not deducted for omissions
answers should only be judged on the quality of spelling, punctuation and grammar when these
features are specifically assessed by the question as indicated by the mark scheme. The
meaning, however, should be unambiguous.
GENERIC MARKING PRINCIPLE 4:
Rules must be applied consistently, e.g. in situations where candidates have not followed
instructions or in the application of generic level descriptors.
GENERIC MARKING PRINCIPLE 5:
Marks should be awarded using the full range of marks defined in the mark scheme for the question
(however; the use of the full mark range may be limited according to the quality of the candidate
responses seen).
GENERIC MARKING PRINCIPLE 6:
Marks awarded are based solely on the requirements as defined in the mark scheme. Marks should
not be awarded with grade thresholds or grade descriptors in mind.
© Cambridge University Press & Assessment 2025
Page 2 of 14
9618/23
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
May/June 2025
Annotations guidance for centres
Examiners use a system of annotations as a shorthand for communicating their marking decisions to
one another. Examiners are trained during the standardisation process on how and when to use
annotations. The purpose of annotations is to inform the standardisation and monitoring processes
and guide the supervising examiners when they are checking the work of examiners within their team.
The meaning of annotations and how they are used is specific to each component and is understood
by all examiners who mark the component.
We publish annotations in our mark schemes to help centres understand the annotations they may
see on copies of scripts. Note that there may not be a direct correlation between the number of
annotations on a script and the mark awarded. Similarly, the use of an annotation may not be an
indication of the quality of the response.
The annotations listed below were available to examiners marking this component in this series.
Annotations
Annotation
Meaning
Benefit of the doubt
To indicate where a key word/phrase/code is missing
Incorrect
Follow through
Indicate a point in an answer
Highlighted text
To draw attention to a particular aspect or to indicate where parts of an answer
have been combined
Ignore
Not answered question
No examples or not enough
Not relevant or used to separate parts of an answer
Off-page
comment
Allows comments to be entered at the bottom of the RM marking window and
then displayed when the associated question item is navigated to.
Repetition
Indicates that work or a page has been seen including blank answer spaces
and blank pages.
Correct
© Cambridge University Press & Assessment 2025
Page 3 of 14
9618/23
Annotation
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Meaning
Too vague
© Cambridge University Press & Assessment 2025
Page 4 of 14
May/June 2025
9618/23
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
May/June 2025
Mark scheme abbreviations
/
separates alternative words / phrases within a marking point
//
separates alternative answers within a marking point
Underline
actual word given must be used by candidate (grammatical variants accepted)
Max
indicates the maximum number of marks that can be awarded
()
the word / phrase in brackets is not required, but sets the context
bold
word/phrase in bold indicates this is a key word/phrase in the candidates answer and
this word/phrase or a word/phrase with a similar meaning must be present
© Cambridge University Press & Assessment 2025
Page 5 of 14
9618/23
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
1(a)(i)
May/June 2025
Answer
MP1
MP2
MP3
MP4
MP5
Marks
When a task/module is repeated / reused / called // performed in
several places
A specific task can be identified /coded as a module / subroutine /
procedure / function.
Reduces complexity of program / code // Program / code is
simplified
Module / subroutine / procedure / function already available.
Testing / debugging / maintenance is easier
2
Local variables are used within a module // are accessible only within
the module (in which they are declared)
Global variables are accessible to all parts of the program /
Local variables use memory only while the module in is executing //
Global variables use memory for the whole time the program is
running
1
The same variable name can be reused in other parts of the
program
Using local variables makes modules self-contained // cannot
accidentally change the same identifier outside of the module
Using local variables aids modularisation.
Memory allocated to local variables can be reused when module not
in use
2
Max 2
1(a)(ii)
MP1
MP2
MP3
Max 1
1(a)(iii)
MP1
MP2
MP3
MP4
Max 2
1(b)
Mark as follows:
5
Expression
CHR(68)
MONTH(04/02/2025)
Evaluates to
Mark
'D'
1
2
1
FALSE
1
1.4
2
// -2 + DAY(04/02/2025)
// -2023 + YEAR(04/02/2025)
NOT TRUE
// FALSE = TRUE
STR_TO_NUM(MID("Court1.4Upper",6,3))
Mark Row 4 as follows:
STR_TO_NUM
1 mark
MID("Court1.4Upper",6,3)
1 mark
© Cambridge University Press & Assessment 2025
Page 6 of 14
9618/23
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
Answer
1(c)
May/June 2025
Marks
4
Variable
Data type
MemberCount
INTEGER
TotalTakings
REAL
BookingConfirmed
BOOLEAN
MemberDOB
DATE
Mark as follows:
1 mark per row
Question
2(a)(i)
Answer
MP1
MP2
400
6
2(a)(ii)
2
3
Stack
Memory
location
Value
409
408
'Y'
407
'Z'
406
‘C’
405
‘F’
404
‘K’
403
MP1
MP2
MP3
Marks
3
TopOfStack
‘B’
402
‘S’
401
‘R’
400
‘D’
TopOfStack pointing to 'Y' and value 'Y' in location 408
Values 'C' and 'Z' in 406 and 407
Values 'D' to 'F' unchanged in 400 to 405 and 409 is empty
© Cambridge University Press & Assessment 2025
Page 7 of 14
9618/23
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
Answer
2(b)(i)
2(c)
Marks
3
Index
Data
0
"Neptune"
2
1
"Jupiter"
4
2
"Saturn"
5
3
"Earth"
4
"Mercury"
5
"Uranus"
MP1
MP2
MP3
2(b)(ii)
May/June 2025
Pointer
1
MP3
MP1
0
-1
MP2
Earth pointer 1
Uranus pointer -1
Other four correct pointers
3
MP1
MP2
MP3
MP4
1
First value added to queue is the first value removed // FIFO // LILO
Two pointers needed to indicate the start and end of the queue
May behave as a circular queue
Manipulated using enqueue()/ dequeue() operations // by
description
Max 2
© Cambridge University Press & Assessment 2025
Page 8 of 14
2
9618/23
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
3
May/June 2025
Answer
Marks
Example solution:
7
FUNCTION RollDice(NoOfTimes : INTEGER) RETURNS REAL
DECLARE RollValue : INTEGER
DECLARE Average : REAL
DECLARE Count : INTEGER
DECLARE Sum : INTEGER
Sum 0
FOR Count 1 TO NoOfTimes
RollValue INT(RAND(6)) + 1
OUTPUT RollValue
Sum Sum + RollValue
NEXT Count
Average Sum / NoOfTimes
RETURN Average
ENDFUNCTION
MP1
MP2
Declare all variables used and initialise Sum to 0
Loop for ‘number of times’ parameter
MP3
MP4
MP5
Use RAND() function with Integer parameter
Use INT() function in a loop
Generate a random integer between 1 and 6
MP6
MP7
Output each value generated
in a loop
Calculate Sum and if Average used check declared as REAL and
return Average and check function header returns REAL
Question
4(a)
in a loop
in a loop
Answer
MP1
MP2
MP3
MP4
MP5
MP6
Open the file (Sales.txt) in read mode and subsequently close
Read a line (from the text file)
Convert the line read (string) to a number
If the number is greater than 500 and then output week number
Increment week number (must have been Initialised …)
Repeat from step 2 for 52 times // Repeat from step 2 until end of file
Max 5
© Cambridge University Press & Assessment 2025
Page 9 of 14
Marks
5
9618/23
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
4(b)
May/June 2025
Answer
MP1
Going through the program a line / statement at a time
// doing a dry run
// single-stepping (at run-time with an IDE)
// Peer testing/review is carried out
MP2
MP3
Creating a trace table
Draw up test data // draw up list of inputs with expected output
// boundary, normal, abnormal data is used
MP4
Errors will be indicated when a variable / output gives an
unexpected value
Faults in the logic of the program can be detected // Errors may be
indicated by an unexpected path through the program
MP5
Marks
3
Max 3
Question
5
Answer
Example solution:
8
FUNCTION Parity(BitString : STRING) RETURNS STRING
DECLARE Index, Count: INTEGER
Count 0
FOR Index 1 TO LENGTH(BitString)
IF MID(BitString, Index, 1) = '1' THEN
Count Count + 1
ENDIF
NEXT Index
IF Count MOD 2 = 1 THEN
BitString BitString & '1'
ELSE
BitString BitString & '0'
ENDIF
RETURN BitString
ENDFUNCTION
MP1
MP2
MP3
MP4
MP5
Function heading and ending and parameter (STRING) and return
type STRING
Loop for length of BitString
Extract current character
in a loop
Compare current character to '1' or '0' in a loop
Increment count and was Initialised earlier in a loop
MP6
MP7
MP8
Check if even/odd number of 1s
Append '1' or '0' as appropriate
Return amended BitString
© Cambridge University Press & Assessment 2025
Marks
Page 10 of 14
9618/23
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
6(a)
May/June 2025
Answer
MP1
MP2
Marks
A function returns a (single) value and a procedure does not
A procedure can pass parameters by ByRef
1
Max 1
6(b)
Sub_Part1A:
5
PROCEDURE Sub_Part1A(R: INTEGER)
1 Mark
Sub_Part2A:
FUNCTION Sub_Part2A(T : REAL) RETURNS BOOLEAN
2 Marks
Sub_Part3A:
PROCEDURE Sub_Part3A(V: INTEGER, W: BOOLEAN, BYREF U :
STRING)
2 Marks
6(c)
Symbol
Explanation
The module Main calls either Sub_A or Sub_B (which one
is called is determined at run time)
The module Sub_A will repeatedly call Sub_Part1A followed
by Sub_Part2A then by Sub_Part3A
MP1
MP2
MP3
Shape1: reference to selection
Shape2: reference to repetition // iteration
Descption (2) including correct use of all module names in both parts
© Cambridge University Press & Assessment 2025
Page 11 of 14
3
9618/23
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
7(a)(i)
May/June 2025
Answer
Example solution:
Marks
5
PROCEDURE UpdateVisit(BYREF LastVisitDate : DATE,__
BYREF LoyaltyPoints : INTEGER)
IF MONTH(TODAY()) = MONTH(LastVisitDate) THEN
LoyaltyPoints LoyaltyPoints + 4
ELSE
LoyaltyPoints LoyaltyPoints + 1
ENDIF
LastVisitDate TODAY()
ENDPROCEDURE
MP1
MP2
Procedure heading and ending and two parameters of correct type
… both passed BYREF
MP3
Use of TODAY() function to obtain current date
MP4
Use MONTH function (2) and one parameter is the header parameter
and 2nd parameter is TODAY() / assigned variable
MP5
MP6
If visit is same month, increase LoyaltyPoints by 4 otherwise
increase by 1
LastVisitDate set to TODAY() / ‘current date’ variable (assigned
or unassigned)
Max 5
7(a)(ii)
DAYINDEX(LastVisitDate) = DAYINDEX(TODAY())
© Cambridge University Press & Assessment 2025
Page 12 of 14
1
9618/23
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
7(b)(i)
May/June 2025
Answer
Marks
Example solution:
8
FUNCTION (MondayCheck(CustomerID : STRING) RETURNS
INTEGER
DECLARE LoyaltyPoints : INTEGER
DECLARE LoyaltyPointsString : STRING
DECLARE Line : STRING
Line FindCustomer(CustomerID)
LoyaltyPointsString MID(Line, 8, LENGTH(Line) –
16))
LoyaltyPoints STR_TO_NUM(LoyaltyPointsString)
IF DAYINDEX(TODAY()) = 2 THEN
LoyaltyPoints LoyaltyPoints + 10
ENDIF
RETURN LoyaltyPoints
ENDFUNCTION
MP1
Value is returned from FindCustomer(CustomerID) and stored
MP2
MP3
Function MID used
Attempt to extract LoyaltyPoints from the string returned by
FindCustomer()
Correct extraction of LoyaltyPoints from the string returned by
FindCustomer()
MP4
MP5
Conversion of LoyaltyPoints extracted to an integer
MP6
MP7
MP8
Check - is today’s date a Monday using TODAY()
… increase LoyaltyPoints by 10
Return LoyaltyPoints
© Cambridge University Press & Assessment 2025
Page 13 of 14
9618/23
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
7(b)(i)
May/June 2025
Answer
Marks
Alternative example solution:
Uses a loop to calculate the number of digits in the LoyaltyPoints string
FUNCTION MondayCheck(CustomerID : STRING) RETURNS INTEGER
DECLARE
DECLARE
DECLARE
DECLARE
LoyaltyPoints : INTEGER
LoyaltyPointsString : STRING
Index : INTEGER
Line : STRING
Line FindCustomer(CustomerID)
Index 9
WHILE MID(Line, Index, 1) <> ','
Index Index + 1
ENDWHILE
// calculate the number of digits in LoyaltyPoints
string
LoyaltyPointsString MID(Line, 8, Index - 8)
LoyaltyPoints STR_TO_NUM(LoyaltyPointsString)
IF DAYINDEX(TODAY()) = 2 THEN
LoyaltyPoints LoyaltyPoints + 10
ENDIF
RETURN LoyaltyPoints
ENDFUNCTION
7(b)(ii)
Example solution:
4
DayInt STR_TO_NUM(LEFT(LastVisitDateString, 2))
MonthInt STR_TO_NUM(MID(LastVisitDateString, 3, 2))
YearInt STR_TO_NUM(RIGHT(LastVisitDateString, 4))
LastVisitDate SETDATE(DayInt, MonthInt, YearInt)
Mark as follows:
MP1
MP2
Use of one substring function
DayInt, MonthInt and YearInt all correctly extracted
MP3
Use of STR_TO_NUM x 3
MP4
SETDATE() function used to convert to a date type and assigned to
LastVisitDate
© Cambridge University Press & Assessment 2025
Page 14 of 14