Business (9609) · May/June 2024 · Mark scheme 31
Cambridge Business (9609) mark scheme for paper 31, May/June 2024 — 9609/31/M/J/24, file 9609_s24_ms_31.pdf.
Text of this paper
www.dynamicpapers.com
Cambridge International AS & A Level
BUSINESS
9609/31
Paper 3 Business Decision-making
May/June 2024
MARK SCHEME
Maximum Mark: 60
Published
This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of the
examination. It shows the basis on which Examiners were instructed to award marks. It does not indicate the
details of the discussions that took place at an Examiners’ meeting before marking began, which would have
considered the acceptability of alternative answers.
Mark schemes should be read in conjunction with the question paper and the Principal Examiner Report for
Teachers.
Cambridge International will not enter into discussions about these mark schemes.
Cambridge International is publishing the mark schemes for the May/June 2024 series for most
Cambridge IGCSE, Cambridge International A and AS Level and Cambridge Pre-U components, and some
Cambridge O Level components.
This document consists of 25 printed pages.
© Cambridge University Press & Assessment 2024
[Turn over
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Generic Marking Principles
May/June 2024
www.dynamicpapers.com
These general marking principles must be applied by all examiners when marking candidate answers. They should be applied alongside the
specific content of the mark scheme or generic level descriptions for a question. Each question paper and mark scheme will also comply with these
marking principles.
GENERIC MARKING PRINCIPLE 1:
Marks must be awarded in line with:
the specific content of the mark scheme or the generic level descriptors for the question
the specific skills defined in the mark scheme or in the generic level descriptors for the question
the standard of response required by a candidate as exemplified by the standardisation scripts.
GENERIC MARKING PRINCIPLE 2:
Marks awarded are always whole marks (not half marks, or other fractions).
GENERIC MARKING PRINCIPLE 3:
Marks must be awarded positively:
marks are awarded for correct/valid answers, as defined in the mark scheme. However, credit is given for valid answers which go beyond
the scope of the syllabus and mark scheme, referring to your Team Leader as appropriate
marks are awarded when candidates clearly demonstrate what they know and can do
marks are not deducted for errors
marks are not deducted for omissions
answers should only be judged on the quality of spelling, punctuation and grammar when these features are specifically assessed by the
question as indicated by the mark scheme. The meaning, however, should be unambiguous.
GENERIC MARKING PRINCIPLE 4:
Rules must be applied consistently, e.g. in situations where candidates have not followed instructions or in the application of generic level
descriptors.
© Cambridge University Press & Assessment 2024
Page 2 of 25
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
May/June 2024
www.dynamicpapers.com
GENERIC MARKING PRINCIPLE 5:
Marks should be awarded using the full range of marks defined in the mark scheme for the question (however; the use of the full mark range may
be limited according to the quality of the candidate responses seen).
GENERIC MARKING PRINCIPLE 6:
Marks awarded are based solely on the requirements as defined in the mark scheme. Marks should not be awarded with grade thresholds or
grade descriptors in mind.
© Cambridge University Press & Assessment 2024
Page 3 of 25
9609/31
1
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Social Science-Specific Marking Principles
(for point-based marking)
May/June 2024
www.dynamicpapers.com
Components using point-based marking:
Point marking is often used to reward knowledge, understanding and application of skills. We give credit where the candidate’s answer
shows relevant knowledge, understanding and application of skills in answering the question. We do not give credit where the answer
shows confusion.
From this it follows that we:
a
b
c
d
e
f
g
2
DO credit answers which are worded differently from the mark scheme if they clearly convey the same meaning (unless the mark
scheme requires a specific term)
DO credit alternative answers/examples which are not written in the mark scheme if they are correct
DO credit answers where candidates give more than one correct answer in one prompt/numbered/scaffolded space where extended
writing is required rather than list-type answers. For example, questions that require n reasons (e.g. State two reasons …).
DO NOT credit answers simply for using a ‘key term’ unless that is all that is required. (Check for evidence it is understood and not used
wrongly.)
DO NOT credit answers which are obviously self-contradicting or trying to cover all possibilities
DO NOT give further credit for what is effectively repetition of a correct point already credited unless the language itself is being tested.
This applies equally to ‘mirror statements’ (i.e. polluted/not polluted).
DO NOT require spellings to be correct, unless this is part of the test. However spellings of syllabus terms must allow for clear and
unambiguous separation from other syllabus terms with which they may be confused (e.g. Corrasion/Corrosion).
Presentation of mark scheme:
Slashes (/) or the word ‘or’ separate alternative ways of making the same point.
Semi colons (;) bullet points (•) or figures in brackets (1) separate different points.
Content in the answer column in brackets is for examiner information/context to clarify the marking but is not required to earn the mark
(except Accounting syllabuses where they indicate negative numbers).
© Cambridge University Press & Assessment 2024
Page 4 of 25
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
May/June 2024
www.dynamicpapers.com
3
Calculation questions:
The mark scheme will show the steps in the most likely correct method(s), the mark for each step, the correct answer(s) and the mark
for each answer.
If working/explanation is considered essential for full credit, this will be indicated in the question paper and in the mark scheme. In all
other instances, the correct answer to a calculation should be given full credit, even if no supporting working is shown.
Where the candidate uses a valid method which is not covered by the mark scheme, award equivalent marks for reaching equivalent
stages.
Where an answer makes use of a candidate’s own incorrect figure from previous working, the ‘own figure rule’ applies: full marks will be
given if a correct and complete method is used. Further guidance will be included in the mark scheme where necessary and any
exceptions to this general principle will be noted.
4
Annotation:
For point marking, ticks can be used to indicate correct answers and crosses can be used to indicate wrong answers. There is no direct
relationship between ticks and marks. Ticks have no defined meaning for levels of response marking.
For levels of response marking, the level awarded should be annotated on the script.
Other annotations will be used by examiners as agreed during standardisation, and the meaning will be understood by all examiners
who marked that paper.
© Cambridge University Press & Assessment 2024
Page 5 of 25
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
May/June 2024
www.dynamicpapers.com
Guidance on using levels-based marking
Marking of work should be positive, rewarding achievement where possible, but clearly differentiating across the whole range of marks, where appropriate.
The examiner should look at the work and then make a judgement about which level statement is the best fit. In practice, work does not always match one level
statement precisely so a judgement may need to be made between two or more level statements.
Once a best-fit level statement has been identified, use the following guidance to decide on a specific mark:
If the candidate’s work convincingly meets the level statement, award the highest mark.
If the candidate’s work adequately meets the level statement, award the most appropriate mark in the middle of the range.
If the candidate’s work just meets the level statement, award the lowest mark.
L1, L2 etc. must be clearly annotated on the response at the point where the level is achieved.
Assessment objectives
AO1 Knowledge and understanding
Demonstrate knowledge and understanding of business concepts, terms and theories.
AO2 Application
Apply knowledge and understanding of business concepts, terms and theories to problems and issues in a variety of familiar and unfamiliar business situations
and contexts.
AO3 Analysis
Analyse business problems, issues and situations by:
using appropriate methods and techniques to make sense of qualitative and quantitative business information
searching for causes, impact and consequences
distinguishing between factual evidence and opinion or value judgement
drawing valid inferences and making valid generalisations.
AO4 Evaluation
Evaluate evidence in order to make reasoned judgements, present substantiated conclusions and, where appropriate, make recommendations for action and
implementation.
© Cambridge University Press & Assessment 2024
Page 6 of 25
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
1
May/June 2024
www.dynamicpapers.com
Answer
Marks
Analyse two advantages to GBS of using flexible part-time employment contracts.
Level
AO1 Knowledge and
understanding
2 marks
AO2 Application
2 marks
2
8
AO3 Analysis
4 marks
3–4 marks
Developed analysis
Developed analysis that
identifies connections
between causes, impacts
and/or consequences of two
points.
Developed analysis that
identifies connections
between causes, impacts
and/or consequences of one
point.
1
1–2 marks
Knowledge of two relevant
points is used to answer the
question.
Knowledge of one relevant
point is used to answer the
question.
1–2 marks
Application of two relevant
points to a business context.
Application of one relevant
point to a business context.
1–2 marks
Limited analysis
Limited analysis that identifies
connections between causes,
impacts and/or consequences
of two points.
Limited analysis that identifies
connections between causes,
impacts and/or consequences
of one point.
0
0 marks
No creditable response.
0 marks
No creditable response.
0 marks
No creditable response.
© Cambridge University Press & Assessment 2024
Page 7 of 25
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
1
May/June 2024
www.dynamicpapers.com
Answer
Note:
Only reward benefits.
If more than two benefits are referred to, reward the best two.
Benefits must apply to GBS.
All annotation (
) should be in the left margin.
Indicative content
AO1 Knowledge and understanding
Definition or explanation of flexible part-time employment contracts (max K 1 mark).
Employees are only contracted to work for a certain number of hours each week but less than the full-time working
week.
Possible advantages include (max 2 K marks):
Higher productivity due to improved employee morale
Lower fixed costs
Low labour turnover
Less absenteeism
Attract wider range of potential employees
Greater commitment to and engagement with the organisation.
© Cambridge University Press & Assessment 2024
Page 8 of 25
Marks
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
1
May/June 2024
www.dynamicpapers.com
Answer
AO2 Application
Limited application,
applies knowledge to GBS once.
Developed application,
+
applies knowledge to GBS twice.
Max one
for application for the first advantage and max one
for application for the second advantage.
Small number of employees (13).
Link to GBS being able to react quickly to seasonal fluctuations.
Link to low inventory of extracted materials.
AO3 Analysis
Limited analysis
- candidate shows one link in the chain of analysis.
Developed analysis
- candidate shows two or more links in the chain of analysis.
Employees feel they are in control of their work arrangements with regard to time so productivity is higher therefore unit
costs are lower
which enables GBS to be price competitive in the market
.
Employees feel trusted and have some choice, leading to lower labour turnover and therefore a reduction in
recruitment costs
.
Employees have a degree of choice over when they work resulting in less absenteeism
and greater output to meet
customer demands
.
Choice of work times attracts a wider range of potential employees improving the quality of workers and therefore
increasing output
.
Part-time employees can be employed at busy periods to ensure that demand is met
.
Accept all valid responses.
© Cambridge University Press & Assessment 2024
Page 9 of 25
Marks
9609/31
Question
2
May/June 2024
www.dynamicpapers.com
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Answer
Marks
Analyse two disadvantages to GBS of its proposed communication process innovation.
Level
AO1 Knowledge and
understanding
2 marks
AO2 Application
2 marks
2
AO3 Analysis
4 marks
3–4 marks
Developed analysis
Developed analysis that
identifies connections
between causes, impacts
and/or consequences of two
points.
Developed analysis that
identifies connections
between causes, impacts
and/or consequences of one
point.
1
1–2 marks
Knowledge of two relevant
points is used to answer the
question.
Knowledge of one relevant
point is used to answer the
question.
1–2 marks
Application of two relevant
points to a business context.
Application of one relevant
point to a business context.
1–2 marks
Limited analysis
Limited analysis that identifies
connections between causes,
impacts and/or consequences
of two points.
Limited analysis that identifies
connections between causes,
impacts and/or consequences
of one point.
0
0 marks
No creditable response.
0 marks
No creditable response.
0 marks
No creditable response.
© Cambridge University Press & Assessment 2024
Page 10 of 25
8
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
2
May/June 2024
www.dynamicpapers.com
Answer
Note:
Only reward problems / disadvantages.
If more than two problems are referred to, reward the best two.
L2AN (3 marks) is possible for just one point made.
All annotation (
) should be in the left margin.
Indicative content
AO1 Knowledge and understanding
Definition or explanation of process innovation (max K 1 mark).
Application or introduction of a new technology or methods/systems that increase efficiency.
Examples include new IT systems, use of blockchain, automated payments or inventory, robotics.
Possibility that the changes form part of an ERP system.
Possible disadvantages include (max K 2 marks):
Cost of the proposals and need for finance.
Possible employee resistance to change.
Cost of training employees.
Technology may fail.
© Cambridge University Press & Assessment 2024
Page 11 of 25
Marks
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
2
May/June 2024
www.dynamicpapers.com
Answer
AO2 Application
Limited application,
applies knowledge to GBS once.
Developed application,
+
applies knowledge to GBS twice.
Max one
for application for the first problem and max one
for application for the second problem.
Number of employees (13) – will need training.
Low inventory.
Proposal includes coordinated IT system linking customer orders and distribution.
Tracking of orders of sand & gravel.
Gordy is thinking of expanding the business.
Finance needed for new grinding machine.
AO3 Analysis
Limited analysis
– candidate shows one link in the chain of analysis.
Developed analysis
– candidate shows two or more links in the chain of analysis.
A new IT system could be expensive to implement resulting in cash flow problems
.
Employees may feel they have less control as a result of the process innovation. This may result in conflict and disturb
current effective working relationships and employees may leave
increasing recruitment costs
.
Employees will need training which will increase costs and reduce profit in the short term
.
Opportunity cost of investment which could delay the purchase of the new grinding machine
therefore reducing the
ability of GBS to meet increasing demand
.
The app could crash causing customers to be unable to place orders
and going elsewhere to purchase building
materials
resulting in a loss of sales and therefore profit.
Accept all valid responses.
© Cambridge University Press & Assessment 2024
Page 12 of 25
Marks
9609/31
Question
3(a)
May/June 2024
www.dynamicpapers.com
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Answer
Marks
Refer to lines 24–25. Calculate the accounting rate of return (ARR) for the new grinding machine.
2
Indicative content
3(b)
Note
Answer
Mark
Correct answer with or without
working
9000 / 55 000 100 = 16.4% OR 16.36%
Accept 16.4 OR 16.36
2
One or more of the following:
Average profit
Average investment
ARR equation
45 000 / 5 = 9000 [Accept 9]
110 000 / 2 = 55 000 [Accept 55]
ARR =Average profit / Average investment
100
1
Zero marks
No creditable response
0
Refer to Table 1.1. Calculate the net present value (NPV) of the new grinding machine.
2
Indicative content
Note
Answer
Correct answer with or without
working
$22 000 OR 22 000
Accept: $22 OR 22
2
One or more of the following:
Discounted cashflows Yrs
1–5
NPV equation
19 + 27.3 + 25.8 + 28.7 +31.2 = 132 (000)
Sum of discounted future cash flows minus the
initial cost
1
Zero marks
No creditable response
0
© Cambridge University Press & Assessment 2024
Mark
Page 13 of 25
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
3(c)
May/June 2024
www.dynamicpapers.com
Answer
Marks
Evaluate whether GBS should purchase the new grinding machine.
Level
AO1 Knowledge and
understanding
2 marks
AO2 Application
2 marks
AO3 Analysis
2 marks
3
12
AO4 Evaluation
6 marks
5–6 marks
Developed evaluation in
context
A developed
judgement/conclusion is
made in the business context.
Developed evaluative
comments which balance
some key arguments in the
business context.
2
2 marks
Developed knowledge
of relevant key term(s)
and/or factor(s) is used
to answer the question.
2 marks
Developed application
of relevant point(s) to
the business context.
2 marks
Developed analysis
that identifies
connections between
causes, impacts and/or
consequences.
3–4 marks
Developed evaluation
A developed
judgement/conclusion is
made.
Developed evaluative
comments which balance
some key arguments.
1
1 mark
Limited knowledge
of relevant key term(s)
and/or factor(s) is used
to answer the question.
1 mark
Limited application
of relevant point(s) to
the business context.
1 mark
Limited analysis
that identifies
connections between
causes, impacts and/or
consequences.
1–2 marks
Limited evaluation
A judgement/conclusion is
made with limited supporting
comment/evidence.
An attempt is made to
balance the arguments.
0
0 marks
No creditable response.
0 marks
No creditable response.
0 marks
No creditable response.
0 marks
No creditable response.
© Cambridge University Press & Assessment 2024
Page 14 of 25
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
3(c)
May/June 2024
www.dynamicpapers.com
Answer
All annotation (
) should be in the left margin.
Indicative content
AO1 Knowledge and understanding
Limited knowledge
will be demonstrated through knowledge of one factor in the decision.
Developed knowledge
+
will be demonstrated through knowledge of two or more factors in the decision.
Understanding of investment appraisal methods – NPV, ARR, payback period.
Understanding of possible qualitative factors in investment decision – business attitudes, risk, impact on stakeholders,
external factors, consistency with business objectives/strategy availability of finance.
AO2 Application
Limited application,
applies knowledge to GBS once.
Developed application,
+
applies knowledge to GBS twice.
Requirement for skilled operator.
Loan finance is available.
Use of data in Table 1.1 from manufacturer and Mo’s experience.
Impact on unit costs.
Use of answers to Q3(a) and 3(b) (OFR applies).
NPV is positive $22 000.
ARR is 16.4%.
Payback and is in 4th year, 3 years and 10.3 months or 3.86 years.
Discounted payback is 4 years 3.5 months or 4.29 years.
© Cambridge University Press & Assessment 2024
Page 15 of 25
Marks
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
May/June 2024
www.dynamicpapers.com
Question
Answer
3(c)
AO3 Analysis
Limited analysis
– candidate shows one link in the chain of analysis.
Developed analysis
– candidate shows two or more links in the chain of analysis.
Payback is within the 4th year so the investment is forecast to be profitable
and therefore potentially worth investing
in
.
NPV is positive and should therefore be considered as a worthwhile investment
.
GBS may need to finance the investment through borrowing which will increase the gearing of GBS
and this
increases risk for shareholders
.
The investment would enable GBS to meet the increasing demand for its products and therefore potentially increase
profit
.
The grinding machine would decrease unit costs and therefore GBS could set lower prices
which should result in
an increase in demand
.
NPV (positive) and ARR is higher than 5% cost of finance indicating GBS should go ahead
.
AO4 Evaluation
Limited evaluation
– limited supported judgement and/or a weak attempt at evaluative comment.
Developed evaluation
– supported judgement and/or reasonable evaluative comment.
Developed evaluation in context
– supported judgement in context and/or reasonable evaluative comment in
context.
Data and investment appraisal methods strongly support the purchase but are the figures accurate and reliable?
Is a 5-year life realistic? Can data over a 5-year future period be relied on?
Qualitative factors may be as or more important than calculations.
May not be reliable or accurate – can the manufacturer’s data be relied on? They are trying to make a sale so data
may be optimistic plus Mo has not done any market research or research into cost savings (relied on experience).
Are there any other possible investments or changes that will meet GBS’s needs? Little evidence of other possibilities
other than the bullet points in last section – might finance be better spent on one of these?
Can GBS afford another course of action as well as the purchase if it goes ahead?
These points support the conclusion that more detailed research into sales and cost savings including checking the
existing data is needed before making a decision.
Is there a time scale for making the decision?
Are there other possible ways for growth to occur? Need to investigate before deciding.
In view of other possible options/actions in the case more research would be justified before deciding.
Accept all valid responses.
© Cambridge University Press & Assessment 2024
Page 16 of 25
Marks
9609/31
Question
4(a)
May/June 2024
www.dynamicpapers.com
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Answer
Marks
Calculate the price elasticity of demand (PED) for GBS’s gravel product when the price decreased from $90 to $81
per tonne.
Note
Answer
Mark
Correct answer with or without
working
–2.5
4
Negative sign not included
All three of following stated:
Equation for PED
Percentage change in
demand
Percentage change in price
2.5
3
PED = % Change in Qd / % Change in P
25%
–10%
Two of the following
Equation for PED
Percentage change in
demand
Percentage change in price
PED = % Change in Qd / % Change in P
25%
–10%
One of the following:
Equation for PED
Percentage change in
demand
Percentage change in price
PED = % Change in Qd / % Change in P
600 / 2400 100 = 25%
–9 / 90 X 100 = –10%
Zero marks
No creditable response
© Cambridge University Press & Assessment 2024
2
1
Page 17 of 25
0
4
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
4(b)
May/June 2024
www.dynamicpapers.com
Answer
Marks
Evaluate the impact of elasticity measures when GBS makes marketing decisions.
Level
AO1 Knowledge and
understanding
2 marks
AO3 Analysis
2 marks
AO2 Application
2 marks
3
2
12
AO4 Evaluation
6 marks
5–6 marks
Developed evaluation in
context
A developed
judgement/conclusion
is made in the
business context.
Developed evaluative
comments which
balance some key
arguments in the
business context.
2 marks
Developed knowledge
of relevant key term(s)
and/or factor(s) is used
to answer the question.
2 marks
Developed application
of relevant point(s) to the
business context.
2 marks
Developed analysis
that identifies
connections between
causes, impacts and/or
consequences.
© Cambridge University Press & Assessment 2024
Page 18 of 25
3–4 marks
Developed evaluation
A developed
judgement/conclusion
is made.
Developed evaluative
comments which
balance some key
arguments.
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
4(b)
May/June 2024
www.dynamicpapers.com
Answer
Level
AO1 Knowledge and
understanding
2 marks
AO2 Application
2 marks
Marks
AO3 Analysis
2 marks
AO4 Evaluation
6 marks
1
1 mark
Limited knowledge
of relevant key term(s)
and/or factor(s) is used
to answer the question.
1 mark
Limited application
of relevant point(s) to the
business context.
1 mark
Limited analysis
that identifies
connections between
causes, impacts and/or
consequences.
1–2 marks
Limited evaluation
A
judgement/conclusion
is made with limited
supporting
comment/evidence.
An attempt is made to
balance the
arguments.
0
0 marks
No creditable response.
0 marks
No creditable response.
0 marks
No creditable response.
0 marks
No creditable response.
Indicative content
AO1 Knowledge and understanding
Limited knowledge
will be demonstrated through knowledge of elasticity measure or knowledge of the impact on GBS
marketing decisions.
Developed knowledge
+
will be demonstrated through knowledge of elasticity measure and knowledge of the impact
on GBS marketing decisions.
Explanation of elasticities – price, income, promotional.
PED – responsiveness of Qd to a change in price.
YED – responsiveness of Qd to a change in income.
PrEd – responsiveness of Qd to a change in promotional spending.
Understanding of marketing decisions linked to elasticity:
Effectiveness of change in price to impact demand and revenue.
Effectiveness of additional promotional spending to increase demand and profit.
Changing the product to reduce how responsive demand is to a change in price
Changing place to reduce PED.
© Cambridge University Press & Assessment 2024
Page 19 of 25
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
4(b)
May/June 2024
www.dynamicpapers.com
Answer
AO2 Application
Limited application,
applies knowledge to GBS once.
Developed application,
+
applies knowledge to GBS twice.
GBS extracts and distributes sand and gravel – product decision.
Decrease in price of 10% resulted in an increase in demand of 25%.
GBS considering cuts in price.
Estimated impact of a 25% increase in promotional expenditure is an increase in demand of 27.5%.
Source of information is building trade journal.
GDP in country Q increasing by 8%.
Asking for government help for construction industry.
PED for GBS gravel product is -2.5 (price elastic).
Elasticity of demand for all industry gravel products: YED is 1.8 (income elastic), PrEd is 1.1 (promotion elastic).
AO3 Analysis
Limited analysis
– candidate shows one link in the chain of analysis.
Developed analysis
– candidate shows two or more links in the chain of analysis.
Trade journal may be out of date so elasticity data may not be accurate
.
As demand for gravel products is price elastic this gives support for reducing price
as this will lead to a more than
proportionate change in demand and therefore increase revenue
.
The promotional elasticity of demand supports increasing spending on promotion
and this will contribute to meeting
GBS’s growth objectives
.
With rising GDP and a positive income elasticity of demand for gravel products demand should continue to rise
therefore GBS does not need to reduce price or increase promotion to achieve its growth objectives
.
Luxury homes are likely to have a high income elasticity of demand and therefore GBS can benefit from producing
more high value products
as rising GDP will result in an increase in the demand for luxury homes
.
The reaction of competitors to any cut in price made by GBS will impact the accuracy of the estimate of PED
.
© Cambridge University Press & Assessment 2024
Page 20 of 25
Marks
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
4(b)
May/June 2024
www.dynamicpapers.com
Answer
AO4 Evaluation
Limited evaluation
– limited supported judgement and/or a weak attempt at evaluative comment.
Developed evaluation
– supported judgement and/or reasonable evaluative comment.
Developed evaluation in context
– supported judgement in context and/or reasonable evaluative comment in
context.
Table 1.2 only refers to gravel products, Gordy’s PED is for only one product. This means the data can only form part
of an input to a marketing strategy.
Proposals: PED indicate that a price fall will significantly increase demand so this should form part of any marketing
strategy for gravel products in line with objective of growth. Effect on profits depends on costs of producing more.
Income elasticity indicates GBS should prepare for an increase in demand independent of any price or promotional
changes.
The above is subject to GBS’s products facing the same market conditions as all industry gravels.
Marketing strategy: sand products have no market information, though likely to be influenced by income in a similar
way to gravel products as construction industry demand grows.
A marketing strategy is much wider than just considering elasticities and GBS should use other tools and indicators
when deciding on an overall strategy.
Accept all valid responses.
© Cambridge University Press & Assessment 2024
Page 21 of 25
Marks
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
May/June 2024
www.dynamicpapers.com
Question
Answer
5
Evaluate the extent to which corporate social responsibility (CSR) should influence GBS’s decision to expand into
new land.
Level
AO1 Knowledge and
understanding
2 marks
AO2 Application
2 marks
Marks
AO3 Analysis
2 marks
3
2
AO4 Evaluation
6 marks
5–6 marks
Developed evaluation in
context
A developed
judgement/conclusion
is made in the
business context.
Developed evaluative
comments which
balance some key
arguments in the
business context.
2 marks
Developed knowledge
of relevant key term(s)
and/or factor(s) is used
to answer the question.
2 marks
Developed application
of relevant point(s) to the
business context.
2 marks
Developed analysis
that identifies
connections between
causes, impacts and/or
consequences.
© Cambridge University Press & Assessment 2024
Page 22 of 25
3–4 marks
Developed evaluation
A developed
judgement/conclusion
is made.
Developed evaluative
comments which
balance some key
arguments.
12
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
5
May/June 2024
www.dynamicpapers.com
Answer
Level
AO1 Knowledge and
understanding
2 marks
AO2 Application
2 marks
Marks
AO3 Analysis
2 marks
AO4 Evaluation
6 marks
1
1 mark
Limited knowledge
of relevant key term(s)
and/or factor(s) is used
to answer the question.
1 mark
Limited application
of relevant point(s) to the
business context.
1 mark
Limited analysis
that identifies
connections between
causes, impacts and/or
consequences.
1–2 marks
Limited evaluation
A judgement/conclusion
is made with limited
supporting
comment/evidence.
An attempt is made to
balance the arguments.
0
0 marks
No creditable response.
0 marks
No creditable response.
0 marks
No creditable response.
0 marks
No creditable response.
Indicative content
AO1 Knowledge and understanding
Limited knowledge
will be demonstrated through knowledge of CSR or knowledge of how CSR could impact GBS’s
decision to expand into new land.
Developed knowledge
+
will be demonstrated through knowledge of CSR and knowledge of how CSR could impact
GBS’s decision to expand into new land.
Knowledge/explanation of CSR, including social or environmental audits.
Business should take into account impact of decision on society and the environment.
Stakeholder view vs shareholder view.
Role of pressure groups.
Cost of implementing CSR policies.
Benefits to GBS of CSR approach:
Image
Retention of employees
Increased sales
Adds value
Possible objectives of GBS
Use of financial investment appraisal methods in making the decision.
© Cambridge University Press & Assessment 2024
Page 23 of 25
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
5
May/June 2024
www.dynamicpapers.com
Answer
AO2 Application
Limited application,
applies knowledge to GBS once.
Developed application,
+
applies knowledge to GBS twice.
Paying an incentive to local government official is unethical.
Economy requires increased supply of building materials.
Need for permission from local government.
Gordy has objective of expansion.
Using renewable energy to extract materials.
Job creation from expansion.
Protests from villagers about pollution and noise.
Mo is concerned about the cost of CSR to GBS.
AO3 Analysis
Limited analysis
- candidate shows one link in the chain of analysis.
Developed analysis
- candidate shows two or more links in the chain of analysis.
Failing to take account of CSR when making decisions could result in negative publicity and a loss of reputation
this
could result in losing contracts to supply building materials resulting in a loss of revenue and profit
.
Implementing socially responsible actions such as using renewable energy could increase costs and therefore reduce
the profitability of the expansion
.
Businesses are part of society and therefore have a moral responsibility to consider the impact of their decisions on
society
.
Making profit is the primary goal of private sector business and therefore it is acceptable to make any decision as long
as it is within the law
to increase profit on behalf of the owners
.
Due to the housing shortage society will benefit significantly by GBS producing more building materials
therefore
GBS does not need to take account of other CSR issues
.
© Cambridge University Press & Assessment 2024
Page 24 of 25
Marks
9609/31
Cambridge International AS & A Level – Mark Scheme
PUBLISHED
Question
5
May/June 2024
www.dynamicpapers.com
Answer
AO4 Evaluation
Limited evaluation
– limited supported judgement and/or a weak attempt at evaluative comment.
Developed evaluation
– supported judgement and/or reasonable evaluative comment.
Developed evaluation in context
– supported judgement in context and/or reasonable evaluative comment in
context.
Weighing up the financial vs non-financial considerations.
If expansion is a primary objective this may be more important than profit as long as costs are covered.
How committed are Gordy and Mo to CSR or to maximising profit? At the moment we are not sure.
Does practising CSR actually lead to an increase in costs? Short term costs vs long term savings.
How important is CSR to GBS’s customers? Construction businesses are more likely to be interested in minimising
their costs rather than purchasing supplies from a business practicing good social responsibility.
Conclusion as to extent of influence of CSR.
Accept all valid responses.
© Cambridge University Press & Assessment 2024
Page 25 of 25
Marks