Computer Science (9608) · Oct/Nov 2019 · Mark scheme 13

Cambridge Computer Science (9608) mark scheme for paper 13, Oct/Nov 2019 — 9608/13/O/N/19, file 9608_w19_ms_13.pdf.

Advertisement
Loading the paper…
Text of this paper

www.dynamicpapers.com

Cambridge Assessment International Education
Cambridge International Advanced Subsidiary and Advanced Level

COMPUTER SCIENCE

9608/13

Paper 1 Written Paper

October/November 2019

MARK SCHEME
Maximum Mark: 75

Published

This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of the
examination. It shows the basis on which Examiners were instructed to award marks. It does not indicate the
details of the discussions that took place at an Examiners’ meeting before marking began, which would have
considered the acceptability of alternative answers.
Mark schemes should be read in conjunction with the question paper and the Principal Examiner Report for
Teachers.
Cambridge International will not enter into discussions about these mark schemes.
Cambridge International is publishing the mark schemes for the October/November 2019 series for most
Cambridge IGCSE™, Cambridge International A and AS Level components and some Cambridge O Level
components.

This document consists of 9 printed pages.
© UCLES 2019

[Turn over

9608/13

Cambridge International AS/A Levelwww.dynamicpapers.com
– Mark Scheme
October/November
2019
PUBLISHED
Generic Marking Principles

These general marking principles must be applied by all examiners when marking candidate answers.
They should be applied alongside the specific content of the mark scheme or generic level descriptors
for a question. Each question paper and mark scheme will also comply with these marking principles.
GENERIC MARKING PRINCIPLE 1:
Marks must be awarded in line with:
•
•
•

the specific content of the mark scheme or the generic level descriptors for the question
the specific skills defined in the mark scheme or in the generic level descriptors for the question
the standard of response required by a candidate as exemplified by the standardisation scripts.

GENERIC MARKING PRINCIPLE 2:
Marks awarded are always whole marks (not half marks, or other fractions).
GENERIC MARKING PRINCIPLE 3:
Marks must be awarded positively:
•
•
•
•
•

marks are awarded for correct/valid answers, as defined in the mark scheme. However, credit
is given for valid answers which go beyond the scope of the syllabus and mark scheme,
referring to your Team Leader as appropriate
marks are awarded when candidates clearly demonstrate what they know and can do
marks are not deducted for errors
marks are not deducted for omissions
answers should only be judged on the quality of spelling, punctuation and grammar when these
features are specifically assessed by the question as indicated by the mark scheme. The
meaning, however, should be unambiguous.

GENERIC MARKING PRINCIPLE 4:
Rules must be applied consistently e.g. in situations where candidates have not followed
instructions or in the application of generic level descriptors.
GENERIC MARKING PRINCIPLE 5:
Marks should be awarded using the full range of marks defined in the mark scheme for the question
(however; the use of the full mark range may be limited according to the quality of the candidate
responses seen).
GENERIC MARKING PRINCIPLE 6:
Marks awarded are based solely on the requirements as defined in the mark scheme. Marks should
not be awarded with grade thresholds or grade descriptors in mind.

© UCLES 2019

Page 2 of 9

Cambridge International AS/A Levelwww.dynamicpapers.com
– Mark Scheme
October/November
2019
PUBLISHED

9608/13

Question
1(a)(i)

Answer

Marks

1 mark per input device to max 2

2

e.g.
• Barcode scanner / Infra-red scanner
• Pressure sensor
• RFID / chip reader
• Bank note scanner
• Pin / key pad
• Magnetic strip reader
1(a)(ii)

1 mark per output device to max 2

2

e.g.
• Speaker
• Printer
• LCD screen
1(a)(iii)

1 mark for at least two statements in the correct position, 2 marks for all
four statements in correct position.
1
2
3
4
5
6

1(b)(i)

1(b)(ii)

B «. «.. (The screen has a layer that stores an electrical charge)
When the user touches the screen
A ««« (Charge is drawn to the point of contact)
C ««« (There is a change in the electrostatic field)
The coordinates of the point of contact can be calculated
D «««. (These coordinates are sent to the touchscreen driver)

1 mark per bullet point to max 2
•
•
•
•

2

To store the files needed to boot the system
To store parts of the self- checkout machine operating system
To store the self-checkout machine software
To store the intermediate data / running total for items purchased

1 mark for at least one correct row, 2 marks for all three correct rows
Statement

SRAM

DRAM

9

More expensive to make

9

Requires refreshing (recharging)
9

Made from flip-flops

© UCLES 2019

2

Page 3 of 9

2

Cambridge International AS/A Levelwww.dynamicpapers.com
– Mark Scheme
October/November
2019
PUBLISHED

9608/13

Question
1(c)(i)

Answer
1 mark per bullet point to max 3 plus 1 mark for suitable example
•
•
•
•
•
•

1(c)(ii)

Marks
4

When a barcode on an item is scanned
« the server performs any requested tasks // the server looks up the
details of the product
The self-checkout machine is a client
« that send requests to the server // the self-checkout machine asks
for, e.g. the price of the item
The server returns the results of the request // the server returns e.g.
the item price
Self-checkout machine displays e.g. price to the user

1 mark for each security method to max 2, 1 mark for integrity

3

Security
• encryption
• access rights
• username and password // biometrics // user accounts
• backup // disk mirroring
• firewall
• Physical methods (e.g. CCTV, locked rooms etc.)
Integrity
• checksum
• parity
• validation on input
Question
2(a)

Answer
1 mark per bullet point to max 4 for each management task, max 6 in total
Process Management
• Manages the scheduling of processes
• « allows multi-tasking / multi-processing
• « ensures fair access
• « handles priorities
• Manages which resources the processes require
• Enables processes to share information
• Prevents interference between processes // resolution of conflicts
Memory Management
• Allocates memory to processes
• Ensures fair usage of memory
• Organises memory / by example
• Makes use of virtual memory
• Keep processes separate
• To release memory when a process stops

© UCLES 2019

Page 4 of 9

Marks
6

Cambridge International AS/A Levelwww.dynamicpapers.com
– Mark Scheme
October/November
2019
PUBLISHED

9608/13

Question
2(b)(i)

Answer
1 mark per bullet point to max 2
•
•
•

2(b)(ii)

2(b)(iii)

Marks
2

The amplitude of the wave is measured
« at set, regular time intervals
The value is stored as a binary number

1 mark per bullet point

2

•

Sampling resolution of 44100 Hz takes more samples per second, so
the file size will be larger // Sampling resolution of 21000 Hz takes fewer
samples per second, so the file size will be smaller

•

At a resolution of 44100 Hz, the sound recording is a closer / more
accurate representation of Leonardo's voice // At a resolution of 21000
Hz, the sound recording is a less accurate representation of Leonardo's
voice

1 mark for naming a feature, 1 mark for description, max 2 marks for each
feature

4

e.g.
• Amplify
• ... Increase the volume of a section of sound
•
•

Change pitch
... Increase/decrease frequency of section(s)

•
•

Change sampling resolution
« to change the accuracy of the sound / file size

Question
3(a)(i)

Answer
1 mark per table
•
•
•

3

CUSTOMER table has at least customer ID, customer name, address
and contact details
ROOM has at least room number, room type,
BOOKING has at least booking ID, room number, customer ID, start
date, number of nights

CUSTOMER (CustomerID, Name, Address, ContactDetails)
ROOM (RoomNumber, RoomType)
BOOKING (BookingID, RoomNumber, CustomerID, StartDate,
NumberNights)

© UCLES 2019

Marks

Page 5 of 9

Cambridge International AS/A Levelwww.dynamicpapers.com
– Mark Scheme
October/November
2019
PUBLISHED

9608/13

Question

Answer

Marks

3(a)(ii)

1 mark for 1 or 2 correct Primary Keys, 2 marks for 3 correct Primary Keys

2

CUSTOMER: CustomerID
ROOM: RoomNumber
BOOKING: BookingID
3(a)(iii)

1 mark for both table name and Foreign Key

1

Table: BOOKING
Foreign Key: CustomerID / RoomNumber
3(b)

1 mark per bullet point to max 2 plus 1 mark for suitable example for each
DBMS tool

5

Developer Interface
• To create user friendly features e.g. forms to enter new bookings
• To create outputs e.g. report of bookings on a given date
• To create interactive features e.g. buttons and menus
Query processor
• To create SQL/QBE queries
• To search for data that meets set criteria, e.g. all bookings for next
week
• To perform calculations on extracted data, e.g. number of empty rooms
tomorrow
3c

1 mark for at least two correct rows, 2 marks for all four correct rows
Script

DDL

DML

9

CREATE TABLE FILMS

9

SELECT FilmID FROM FILMS
ALTER TABLE FILMS ADD PRIMARY KEY (FilmID)

9

CREATE DATABASE MYDATA

9

Question

2

Answer

Marks

4(a)

1532

1

4(b)

1111 0001 0001

1

4(c)

101

1

4(d)

65

1

4(e)

DE

1

© UCLES 2019

Page 6 of 9

Cambridge International AS/A Levelwww.dynamicpapers.com
– Mark Scheme
October/November
2019
PUBLISHED

9608/13

Question
5(a)

Answer
1 mark for each correct gate
•
•
•
•
•

5(b)

© UCLES 2019

Marks
5

A OR C
NOT(A OR C)
NOT B
A AND NOT B
Final OR

1 mark for each pair of rows

4

A

B

C

Working space

0

0

0

1

0

0

1

0

0

1

0

1

0

1

1

0

1

0

0

1

1

0

1

1

1

1

0

0

1

1

1

0

Page 7 of 9

X

Cambridge International AS/A Levelwww.dynamicpapers.com
– Mark Scheme
October/November
2019
PUBLISHED

9608/13

Question
6(a)(i)

Answer
1 mark per bullet point to max 3
•
•
•
•
•
•

6(a)(ii)

3

checkAnswer
Math.floor // floor
Math.random // random
getElementById
toString
alert

1 mark per bullet point
•
•

Marks

2

12
17 and 19

6(a)(iii)

14

1

6(a)(iv)

1 mark per bullet point to max 2

2

•
•
•
6(b)

1 mark per bullet point to max 4
•
•
•
•
•
•

© UCLES 2019

Converts the number in the variable answer to a string
Compares the value in userAnswer with the string value of answer
The if determines which line is executed next
4

Using program libraries saves time
« as she does not have to write some routines
Program library routines should already be thoroughly tested
« so, Willow can use them without having to spend time checking they
work / correcting errors
Program library routines may perform complex tasks
... so, Willow won’t have to work out how to code them

Page 8 of 9

Cambridge International AS/A Levelwww.dynamicpapers.com
– Mark Scheme
October/November
2019
PUBLISHED

9608/13

Question
7

Answer
1 mark for each correct addressing mode
Addressing
mode

© UCLES 2019

Description

Relative

Form the address by adding the given number to a
base address. Load the contents of the calculated
address to the Accumulator (ACC).

Indirect

Load the contents of the address held at the given
address to ACC.

Direct

Load the contents of the given address to ACC.

Indexed

Form the address from the given address + the
contents of the Index Register. Load the contents of the
calculated address to ACC.

Immediate

Load the given value directly to ACC.

Page 9 of 9

Marks
5

Advertisement