Travel and Tourism (0471) · May/June 2018 · Insert 12
Cambridge Travel and Tourism (0471) insert for paper 12, May/June 2018 — 0471/12/M/J/18, file 0471_s18_in_12.pdf.
Text of this paper
www.dynamicpapers.com
Cambridge International Examinations
Cambridge International General Certificate of Secondary Education
0471/12
TRAVEL AND TOURISM
May/June 2018
Core Module
INSERT
*1014362801-I*
2 hours
READ THESE INSTRUCTIONS FIRST
This Insert contains all the Figures referred to in the questions.
Anything the candidate writes on this Insert will not be marked.
This document consists of 4 printed pages.
DC (SC/FC) 146170/4
© UCLES 2018
[Turn over
2
www.dynamicpapers.com
Fig. 1 for Question 1
Goa Tourism
Goa is a state located on the southwest coast of India. It provides a variety of accommodation
types for visitors, from 5-star luxury hotels to homestays.
Tourists are attracted to Goa for many reasons; 120 kilometres of beaches with lifeguards and
24-hour law enforcement, well developed cities, nature reserves, water sports, cathedrals,
temples and much more.
Map of the state of Goa
Goa welcomes a total of 5.3 million visitors a year.
Domestic arrivals have increased by 34% and international visitors have increased by 5.4%.
Visitors to Goa
International
visitors,
541 000
Domestic
visitors,
4 800 000
The new e-tourist visa scheme has helped increase international arrivals to Goa. Tourists from
150 countries can now apply, pay for and receive an e-tourist visa online.
Fig. 1
© UCLES 2018
0471/12/INSERT/M/J/18
www.dynamicpapers.com
3
Photograph A for Question 2
WARNING
DO NOT GO
BEYOND FE
NC
E
A group of tourists viewing a geothermal vent as part of a guided tour.
Photograph A
Photograph B for Question 3
Photograph B
© UCLES 2018
0471/12/INSERT/M/J/18
[Turn over
4
www.dynamicpapers.com
Fig. 2 for Question 4
The world’s longest train tunnel, Switzerland
The new Gotthard Base Tunnel is 57 kilometres long and is 2300 metres below the Gotthard
Massif mountain range in the Alps. It is the longest railway tunnel in the world and offers
high-speed travel.
•
Passenger trains travel through the tunnel at speeds of up to 200 km/h.
•
The journey time through the tunnel is 20 minutes.
•
There are 65 scheduled trains per day that travel through the tunnel.
The tunnel is owned by Swiss Federal Railways. It took 17 years to build and was state funded.
Fig. 2
Permission to reproduce items where third-party owned material protected by copyright is included has been sought and cleared where possible. Every
reasonable effort has been made by the publisher (UCLES) to trace copyright holders, but if any items requiring clearance have unwittingly been included, the
publisher will be pleased to make amends at the earliest possible opportunity.
To avoid the issue of disclosure of answer-related information to candidates, all copyright acknowledgements are reproduced online in the Cambridge International
Examinations Copyright Acknowledgements Booklet. This is produced for each series of examinations and is freely available to download at www.cie.org.uk after
the live examination series.
Cambridge International Examinations is part of the Cambridge Assessment Group. Cambridge Assessment is the brand name of University of Cambridge Local
Examinations Syndicate (UCLES), which is itself a department of the University of Cambridge.
© UCLES 2018
0471/12/INSERT/M/J/18