Geography (0460) · Oct/Nov 2021 · Question paper 43
Cambridge Geography (0460) question paper for paper 43, Oct/Nov 2021 — 0460/43/O/N/21, file 0460_w21_qp_43.pdf.
Text of this paper
www.dynamicpapers.com
Cambridge IGCSE™
* 5 2 7 7 9 2 3 9 7 5 *
GEOGRAPHY
0460/43
October/November 2021
Paper 4 Alternative to Coursework
1 hour 30 minutes
You must answer on the question paper.
You will need:
Insert (enclosed)
Calculator
Protractor
Ruler
INSTRUCTIONS
●
Answer all questions.
●
Use a black or dark blue pen. You may use an HB pencil for any diagrams or graphs.
●
Write your name, centre number and candidate number in the boxes at the top of the page.
●
Write your answer to each question in the space provided.
●
Do not use an erasable pen or correction fluid.
●
Do not write on any bar codes.
●
If additional space is needed, you should use the lined pages at the end of this booklet; the question
number or numbers must be clearly shown.
INFORMATION
●
The total mark for this paper is 60.
●
The number of marks for each question or part question is shown in brackets [ ].
●
The insert contains additional resources referred to in the questions.
This document has 16 pages. Any blank pages are indicated.
DC (PQ/CGW) 199720/7
© UCLES 2021
[Turn over
www.dynamicpapers.com
2
1
A class of students did fieldwork at five sites along a local river to see how it changed downstream.
One group chose to investigate river velocity and the shape of rocks on the river bed (bedload).
The two hypotheses which the students tested were:
Hypothesis 1: There is a relationship between river velocity and the wetted perimeter of the
river channel.
The wetted perimeter is the part of the river channel cross-section which is in contact with the
water.
Hypothesis 2: Rocks on the bed of the river become more rounded downstream.
(a) Before beginning their fieldwork, the class of students discussed safety in and around a river.
They produced a risk assessment table to identify possible risks and ways to reduce them.
This is shown in Fig. 1.1 below.
Complete the table by suggesting different ways to reduce the three possible risks.
[3]
Risk assessment
possible risk
how to reduce the risk
slipping on rocks on the river bed
getting a disease or illness from the river water
getting wet whilst making measurements in the
river
falling into the river and getting injured
wear waterproof clothing
getting hypothermia in cold temperatures
wear warm clothing whilst outside in cold
temperatures
Fig. 1.1
© UCLES 2021
0460/43/O/N/21
www.dynamicpapers.com
3
(b) To investigate Hypothesis 1: There is a relationship between river velocity and the wetted
perimeter of the river channel, the students measured the velocity once at each fieldwork site.
(i)
Describe one method to measure river velocity.
[4]
(ii)
The students’ measurements of velocity are shown in Table 1.1 (Insert). Plot the result
for site 5 on Fig. 1.2 below.
[1]
Velocity at different sites
2.0
1.8
1.6
1.4
1.2
velocity
(m / sec)
1.0
0.8
0.6
0.4
0.2
0
1
2
upstream
3
site
4
5
downstream
Fig. 1.2
© UCLES 2021
0460/43/O/N/21
[Turn over
www.dynamicpapers.com
4
(c) The technique which the students used to measure the wetted perimeter of the river channel
is shown in Fig. 1.3 (Insert) which is from a student’s notebook.
(i)
Suggest two difficulties of this method of measuring the wetted perimeter of the river
channel.
1
2
[2]
(ii)
The students’ results are shown in Table 1.1 (Insert). Complete Fig. 1.4 below by plotting
the result for site 4.
[1]
Relationship between velocity and wetted perimeter
2.0
1.8
1.6
5
1.4
1.2
velocity
(m / sec)
1.0
0.8
0.6
3
2
0.4
1
0.2
0
0
1
2
3
4
5
6
7
8
wetted perimeter (m)
Fig. 1.4
© UCLES 2021
0460/43/O/N/21
9
10
11
12
13
5
(iii)
www.dynamicpapers.com
What conclusion would the students make about Hypothesis 1: There is a relationship
between river velocity and the wetted perimeter of the river channel? Support your
decision with evidence from Fig. 1.4 and Table 1.1.
[3]
© UCLES 2021
0460/43/O/N/21
[Turn over
6
www.dynamicpapers.com
(d) To investigate Hypothesis 2: Rocks on the bed of the river become more rounded
downstream, the students picked up 20 pebbles at random from the bed of the river at each
site. They then measured the roundness of the pebbles by comparing them with the Powers’
Scale of Roundness which is shown in Fig. 1.5 (Insert).
(i)
Suggest one problem of using the Powers’ Scale to measure roundness.
[1]
(ii)
The students simplified their investigation by combining descriptions on the Powers’
Scale. Their results are shown in Table 1.2 (Insert). Use these results to complete the
pie graph for site 2 in Fig. 1.6 opposite.
[3]
(iii)
The students decided that Hypothesis 2: Rocks on the bed of the river become more
rounded downstream was partly true with some exceptions. Use evidence from
Fig. 1.6 and Table 1.2 to explain why they reached this conclusion.
[3]
(iv)
Explain why rocks on the river bed generally become more rounded downstream.
[2]
(v)
Suggest ways in which the students could have improved the reliability of their method
for testing Hypothesis 2.
[2]
© UCLES 2021
0460/43/O/N/21
www.dynamicpapers.com
7
Roundness of rocks at different sites
90
%
0
10
80
20
site 1
upstream
30
70
60
90
50
%
0
40
10
80
20
site 2
30
70
60
90
50
%
0
40
10
80
20
site 3
30
70
60
90
50
%
0
40
10
80
Key
20
very angular and angular
site 4
slightly angular and
slightly rounded
30
70
60
90
50
%
0
rounded and very rounded
40
10
80
20
30
70
60
50
site 5
downstream
40
Fig. 1.6
© UCLES 2021
0460/43/O/N/21
[Turn over
www.dynamicpapers.com
8
(e) Other students in the class measured the size of the rocks on the river bed at each site to test
another hypothesis.
Which two pieces of equipment below could the students use to measure the size of each
rock? Tick (3) your choices.
[2]
equipment
tick (3)
callipers
clinometer
quadrat
ranging pole
ruler
(f)
While doing fieldwork one observant student noticed that the river valley was different at
each of the five sites. Describe possible changes in the features of the river and its valley
downstream.
[3]
[Total: 30]
© UCLES 2021
0460/43/O/N/21
www.dynamicpapers.com
9
2
Students lived in a village where a by-pass road had recently been completed. This is a road
which goes around the village to provide an alternative route for traffic going past it.
They decided to investigate the following hypotheses by doing a traffic survey:
Hypothesis 1: The total amount of traffic in the village has changed since the by-pass was
constructed.
Hypothesis 2: The amount of traffic on the by-pass is the same throughout the day.
(a) The route of the by-pass is shown in Fig. 2.1 (Insert).
Estimate the distance along the by-pass road between points A and B.
Tick (3) your choice in the table below.
distance
[1]
tick (3)
3.2 km
3.8 km
4.2 km
4.6 km
(b) Before they began their fieldwork, the students looked at the results of a traffic survey done in
the village in 2016, before the by-pass was constructed. These results are shown in Table 2.1
(Insert).
Why are these results ‘secondary’ data?
[1]
© UCLES 2021
0460/43/O/N/21
[Turn over
www.dynamicpapers.com
10
(c) The sites chosen for the traffic survey are shown in Fig. 2.1 (Insert).
The students agreed to do five separate counts at the same times as the survey was done in
2016. The recording sheet used by the students is shown in Fig. 2.2 (Insert).
(i)
Which one of the following methods would the students use to complete their recording
sheet? Tick (3) your choice in the table below.
[1]
method
tick (3)
estimate
interview
measure
sample
tally
(ii)
Describe how the students would carry out the traffic survey.
[4]
(iii)
Suggest three difficulties which the students had when doing their traffic survey.
1
2
3
[3]
© UCLES 2021
0460/43/O/N/21
www.dynamicpapers.com
11
(d) The results of the students’ traffic survey done in the village in 2018 after the by-pass was
constructed are shown in Table 2.2 (Insert).
(i)
Fig. 2.3 below shows the results of both traffic surveys done in the village (2016 and
2018). Plot the results of total traffic numbers for 16:30–17:00 and 19:30–20:00 in
2018 on Fig. 2.3.
[2]
Results of the traffic surveys done in the village
200
180
160
140
120
total
traffic 100
numbers
80
60
40
20
0
07:30 –
08:00
10:30 –
11:00
13:30 –
14:00
16:30 –
17:00
19:30 –
20:00
time
Key
2016 survey
2018 survey
Fig. 2.3
(ii)
Which one of the following would be another suitable method to show the results of total
traffic numbers?
Circle your answer below.
choropleth shading
© UCLES 2021
flow lines on a map
0460/43/O/N/21
scatter graph
[1]
[Turn over
www.dynamicpapers.com
12
(iii)
What conclusion would the students make about Hypothesis 1: The total amount of
traffic in the village has changed since the by-pass was constructed? Support your
decision with evidence from Fig. 2.3 and Tables 2.1 and 2.2 (Insert).
[3]
(e) The students then considered Hypothesis 2: The amount of traffic on the by-pass is the same
throughout the day. First, they used their recording sheet to count the number of vehicles in
each category at the different times. Their results are shown in Table 2.3 (Insert).
(i)
Use the results in Table 2.3 to complete the divided bar graph in Fig. 2.4 below to
show the results for 16:30 to 17:00.
[3]
Number of vehicles in each category at different times
07:30–
08:00
0
10
20
30
40
50
60
70
80
90
100 110 120 130
0
10
20
30
40
50
60
70
80
90
100
0
10
20
30
40
50
60
70
80
90
100
0
10
20
30
40
50
60
70
80
90
100 110 120 130 140
0
10
20
30
40
50
10:30–
11:00
13:30–
14:00
16:30–
17:00
19:30–
20:00
60
number of vehicles
Key
car / bike /
taxi
van /
minibus
lorry / bus /
coach
Fig. 2.4
© UCLES 2021
0460/43/O/N/21
13
(ii)
At which survey time was the number of lorries, buses and coaches more than the
number of vans and minibuses?
(iii)
www.dynamicpapers.com
[1]
The students concluded that Hypothesis 2: The amount of traffic on the by-pass is the
same throughout the day was false. Explain why they made this conclusion. Include
data from Fig. 2.4 and Table 2.3 (Insert) about total vehicle numbers and number of
vehicles in different categories.
[4]
(iv)
Suggest two reasons for the variation in the number of vehicles travelling along the
by-pass during the day.
1
2
[2]
(f)
Suggest likely advantages and disadvantages for people of constructing a by-pass road
around the village.
[4]
[Total: 30]
© UCLES 2021
0460/43/O/N/21
14
www.dynamicpapers.com
Additional Pages
If you use the following pages to complete the answer(s) to any question(s), the question number(s)
must be clearly shown.
© UCLES 2021
0460/43/O/N/21
15
www.dynamicpapers.com
© UCLES 2021
0460/43/O/N/21
16
www.dynamicpapers.com
BLANK PAGE
The boundaries and names shown, the designations used and the presentation of material on any maps contained in this question paper/insert do not imply
official endorsement or acceptance by Cambridge Assessment International Education concerning the legal status of any country, territory, or area or any of its
authorities, or of the delimitation of its frontiers or boundaries.
Permission to reproduce items where third-party owned material protected by copyright is included has been sought and cleared where possible. Every
reasonable effort has been made by the publisher (UCLES) to trace copyright holders, but if any items requiring clearance have unwittingly been included, the
publisher will be pleased to make amends at the earliest possible opportunity.
To avoid the issue of disclosure of answer-related information to candidates, all copyright acknowledgements are reproduced online in the Cambridge
Assessment International Education Copyright Acknowledgements Booklet. This is produced for each series of examinations and is freely available to download
at www.cambridgeinternational.org after the live examination series.
Cambridge Assessment International Education is part of the Cambridge Assessment Group. Cambridge Assessment is the brand name of the University of
Cambridge Local Examinations Syndicate (UCLES), which itself is a department of the University of Cambridge.
© UCLES 2021
0460/43/O/N/21