Geography (0460) · Oct/Nov 2018 · Mark scheme 43

Cambridge Geography (0460) mark scheme for paper 43, Oct/Nov 2018 — 0460/43/O/N/18, file 0460_w18_ms_43.pdf.

Advertisement
Loading the paper…
Text of this paper

www.dynamicpapers.com

Cambridge Assessment International Education
Cambridge International General Certificate of Secondary Education

GEOGRAPHY

0460/43

Paper 4 Alternative to Coursework

October/November 2018

MARK SCHEME
Maximum Mark: 60

Published

This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of the
examination. It shows the basis on which Examiners were instructed to award marks. It does not indicate the
details of the discussions that took place at an Examiners’ meeting before marking began, which would have
considered the acceptability of alternative answers.
Mark schemes should be read in conjunction with the question paper and the Principal Examiner Report for
Teachers.
Cambridge International will not enter into discussions about these mark schemes.
Cambridge International is publishing the mark schemes for the October/November 2018 series for most
Cambridge IGCSE™, Cambridge International A and AS Level components and some Cambridge O Level
components.

This syllabus is approved for use in England, Wales and Northern Ireland as a Cambridge International Level 1/Level 2 Certificate.

This document consists of 7 printed pages.
© UCLES 2018

[Turn over

0460/43

Cambridge IGCSE – Mark Scheme
October/November
www.dynamicpapers.com
2018
PUBLISHED
Generic Marking Principles

These general marking principles must be applied by all examiners when marking candidate answers.
They should be applied alongside the specific content of the mark scheme or generic level descriptors
for a question. Each question paper and mark scheme will also comply with these marking principles.
GENERIC MARKING PRINCIPLE 1:
Marks must be awarded in line with:
•
•
•

the specific content of the mark scheme or the generic level descriptors for the question
the specific skills defined in the mark scheme or in the generic level descriptors for the question
the standard of response required by a candidate as exemplified by the standardisation scripts.

GENERIC MARKING PRINCIPLE 2:
Marks awarded are always whole marks (not half marks, or other fractions).
GENERIC MARKING PRINCIPLE 3:
Marks must be awarded positively:
•
•
•
•
•

marks are awarded for correct/valid answers, as defined in the mark scheme. However, credit
is given for valid answers which go beyond the scope of the syllabus and mark scheme,
referring to your Team Leader as appropriate
marks are awarded when candidates clearly demonstrate what they know and can do
marks are not deducted for errors
marks are not deducted for omissions
answers should only be judged on the quality of spelling, punctuation and grammar when these
features are specifically assessed by the question as indicated by the mark scheme. The
meaning, however, should be unambiguous.

GENERIC MARKING PRINCIPLE 4:
Rules must be applied consistently e.g. in situations where candidates have not followed
instructions or in the application of generic level descriptors.
GENERIC MARKING PRINCIPLE 5:
Marks should be awarded using the full range of marks defined in the mark scheme for the question
(however; the use of the full mark range may be limited according to the quality of the candidate
responses seen).
GENERIC MARKING PRINCIPLE 6:
Marks awarded are based solely on the requirements as defined in the mark scheme. Marks should
not be awarded with grade thresholds or grade descriptors in mind.

© UCLES 2018

Page 2 of 7

Cambridge IGCSE – Mark Scheme
October/November
www.dynamicpapers.com
2018
PUBLISHED

0460/43

Question

Answer

Marks

1(a)(i)

Source

1

1(a)(ii)

Confluence

1

1(b)(i)

Slippery surfaces in and around the river

1

1(b)(ii)

Slippery surfaces: wear suitable shoes / boots / work with a partner / don’t
work alone / use a stick for support
Fast currents: avoid the area of fast water or deep water / work with partner /
don’t work alone / use a rope
Waterborne disease: do not drink water / wash hands after being in river /
wear gloves / drink bottled water
3@1

3

Photo C, A, B

2

1(c)

3 correct = 2 marks, 1 or 2 correct = 1 mark
1(d)(i)

Average depth multiplied by width

1

1(d)(ii)

Plotting bar for site 3 = 0.51 sq m

1

1(d)(iii)

Partially – 1 mark reserve

4

Sites below waterfall / 7–12 / downstream generally or overall or majority or
most or some have a bigger cross section area
There are exceptions / anomalies at sites 2 / 5 / 7 / 9 / 12 (any e.g.)
e.g. site 7 is smaller cross section and there are larger ones upstream
e.g. site 12 is smaller cross section than site 11
Credit 2 marks maximum for data – any 2 sites and cross-section areas
(1 mark for supporting hypothesis and 1 mark for exception)
Sites must relate to a context above
e.g. Site 1 = 0.12 sq m and site 12 = 0.84 sq m (support)
e.g. Site 5 = 1.65 sq m and site 7 = 0.23 sq m (exception)
e.g. average 1–6 (above) = 0.8 / 0.81 sq m and average 7–12 (below) =
1.94 sq m
If no hypothesis conclusion credit evidence
1(e)(i)

Plotting score for site 10 = 1.53

1

1(e)(ii)

Hypothesis is true – 1 mark reserve

3

(Average) score is higher / increases downstream (of waterfall)
Credit 1 mark for paired data – average or sites above and below waterfall or
range – which support hypothesis e.g.
Sites 1–6 average = 1.11 and sites 7–12 average = 1.35
Site 1 = 1.19 and site 12 = 1.37
Range of sites 1–6 = 1.01 to 1.19 and range of sites 7–12 = 1.14 to 1.63
If no hypothesis conclusion credit evidence

© UCLES 2018

Page 3 of 7

0460/43

Cambridge IGCSE – Mark Scheme
October/November
www.dynamicpapers.com
2018
PUBLISHED

Question

Answer

Marks

1(f)(i)

Erosion on outside of meander / bank / side
Lateral / sideways erosion

1

1(f)(ii)

Plot width at site 8 = 8.4 m

1

1(f)(iii)

Credit evidence from upstream and downstream of waterfall such as
Second largest measurement at site 3 / upstream of waterfall
Sites 2 / 3 / 5 are wider than some sites downstream
Site 7 / 8 / 9 / 10 are narrower than some sites upstream

2

Credit any two appropriate sites (upstream and downstream of waterfall) –
either statement or statistics to 2 marks
e.g. site 3 is wider than site 7 OR site 3 = 24.7 m and site 7 = 4.2 m
e.g. site 2 is wider than site 10 OR Site 2 = 18.2 m and site 10 = 10.3 m
2@1

© UCLES 2018

Page 4 of 7

0460/43

Question
1(g)

Cambridge IGCSE – Mark Scheme
October/November
www.dynamicpapers.com
2018
PUBLISHED
Answer
Method to measure stream velocity or gradient or load characteristics or
wetted perimeter or pollution

Marks
4

Velocity using floats
Use tape measure to measure a fixed distance / 10 metres
Put poles/sticks at fixed distance / 10 metres along river / at start and end of
fixed distance
Put float / orange in river at start of measured distance
Start stopwatch or timer when float / orange is put in river
Stopwatch or timer measures time it takes to travel the measured distance /
stop stopwatch or timer when float reaches end of measured distance
Measure at different points across river channel
Velocity using flowmeter
Put velocity meter / propeller / flowmeter below surface of river / into the
water
Propeller must be facing upstream / nothing in front of propeller
Read / look at digital reading or display / speed is shown on display
Take readings across river channel
Gradient
Measure 10 m distance along river
Put two poles vertically on river bed
Hold / put poles at either end of measured distance
Hold clinometer next to top / at agreed height on pole
Line up identified position / top of two poles
Use clinometer to measure angle / degrees
Load – size, material or roundness
Select rocks at different sites downstream
Sample a number / 10–20 rocks at each site
Systematic or random sampling technique
Put rock into callipers or pebbleometer / adjusted callipers to hold rock
Measure length using scale on callipers
Measured long axis / length with ruler
Compare selected rock with Powers roundness scale
Classify rocks according to roundness scale
If characteristic does not match the method, credit method to 2 marks
maximum
If more than one method, credit best answer
1(h)

© UCLES 2018

(Layers of) hard and soft rock / hard rock (layer) on top of soft rock (layer)
Soft rock (layer) is eroded by river / river erodes at base of waterfall
Abrasion / corrasion
Hard rock (layer) is undercut / forms overhang / nothing to hold it /
unsupported
Hard rock (layer) collapses

Page 5 of 7

4

0460/43

Question
2(a)

Cambridge IGCSE – Mark Scheme
October/November
www.dynamicpapers.com
2018
PUBLISHED
Answer
Plotting O5 at 4.5 km SW from town centre
Plotting R3 at 3.8 km ENE from town centre

Marks
2
2@1

2(b)(i)

Traffic moving freely (with few parked vehicles)
Traffic moving slowly (with many parked vehicles)
Traffic not moving (with many parked vehicles)

1

2(b)(ii)

Tells students what they are looking for at each site / gives a description to
choose from / categories / specific description
Gives standardised / range of scores for different situations / scores are
specific
Decision is less subjective / scoring is more objective / unbiased

2

2(b)(iii)

Example of conditions which might vary during the day,
i.e. noise / litter / traffic
Creates time as a variable

1

2(b)(iv)

Watch out for traffic / keep away from road / be careful crossing road / stay
on pavement
Stay in your group / do not go off by yourself
Take a mobile phone
Wear appropriate clothing / high visibility jacket / sunblock, etc.
Do not talk to strangers / take valuables with you / go into dangerous areas /
pick up sharp objects, etc.
2@1

2

2(c)(i)

Results sheet to include:
At least 3 categories
Scoring system (3 2 1 0) / score out of 3 / score
Total score / EQ score

3

2(c)(ii)

Plotting site R1 = 8 (x)
Plotting average industry score = 10.6 (---)

2(c)(iii)

2
2@1

Agree with conclusion / Yes / conclusion is correct – 1 mark reserve (3HA)
There is variation in (mean) scores / values / figures
Compare any 2 types of land use – shops, residential, open space, industry
e.g. Highest score is for shops and lowest score is for industry OR
e.g. Shops score is higher than industry score
Credit 1 mark(s) for supporting paired data e.g.
(Average) score for shops = 16.2 and for industry = 10.6
Disagree with conclusion / conclusion is incorrect= 0 (XHA)
If no hypothesis conclusion ^HA and credit evidence

© UCLES 2018

Page 6 of 7

4

0460/43

Cambridge IGCSE – Mark Scheme
October/November
www.dynamicpapers.com
2018
PUBLISHED

Question
2(c)(iv)

Answer
Depends on type / age of industry / different industries / examples of two
different industries
Some industrial areas are more built-up / more concentrated number of
buildings / less open space
Some industries are noisier
Some industries cause more atmospheric pollution / smell
Some industries have no waste treatment / recycling
Variation in type / amount of transport / traffic to industry
Amount of landscaping in industrial sites vary

Marks
3

Need reference to variation or comparison between industries
2(d)(i)

Plotting score for site S5: 1.7 km distance and 15 EQ score

1

2(d)(ii)

No pattern / random / no relationship / no correlation / no trend / scattered /
all over
Same score at different distances from town centre

3

Credit 1 mark for paired data which shows that hypothesis is false – need
environmental scores and distances from centre
e.g. EQ score = 20 at 0.2 km (S1) and EQ score = 6 at 4.0 km (O3)
e.g. EQ score is 10 at 2.6 km and 5.3 km
2(e)

Repair roads / pavements
Landscaping / plants trees / cut grass
Example of ways to reduce number of vehicles or vehicles parking on road
– yellow lines / parking meters / more public transport / pedestrianisation /
congestion charge, etc.
Laws / regulations on noise / atmospheric pollution / fines for companies
polluting the air
Litter bins / / recycling facility / fines for dropping litter / fines for graffiti
Teams of people to tidy up area / remove graffiti
Repair broken street furniture or e.g.
2@1

2

2(f)

Produce a questionnaire / ask questions
Example of appropriate question e.g. Do you think this area / site is noisy? /
introduction or explanation about questionnaire

4

Name of sampling method (to use questionnaire)
Description of sampling method
Number of people to sample (20–100)
Do fieldwork at different times of day / decide which time to do fieldwork
Decide on who does which task within the group
OR interview methodology
No credit for environmental quality scores

© UCLES 2018

Page 7 of 7

Advertisement